UFGS 33 09 53 Aviation Fuel Pump Control and Annunciation System (Type III)
02/01/2021
View/Download |View/Download
CCR
UFGS 33 09 54 Aviation Fuel Pump Control and Annunciation System (Type [IV][V])
08/01/2018
View/Download |View/Download
CCR
UFGS 33 09 55 Aviation Fuel Pump Control and Annunciation System (Cut-N-Cover Tanks)
08/01/2018
View/Download |View/Download
CCR
UFGS 33 11 00 Water Utility Distribution Piping
08/01/2024
View/Download |View/Download
CCR
UFGS 33 11 13 Potable Water Supply Wells
08/01/2017
View/Download |View/Download
CCR
UFGS 33 11 23 Natural Gas and Liquid Petroleum Piping
11/01/2009
View/Download |View/Download
CCR
UFGS 33 16 13.16 Wire-Wound Circular Prestressed-Concrete Water Tank
04/01/2006
View/Download |View/Download
CCR
UFGS 33 16 15 Water Storage Steel Tanks
11/01/2020
View/Download |View/Download
CCR
UFGS 33 26 00.00 10 Relief Wells
04/01/2008
View/Download |View/Download
CCR
UFGS 33 30 00 Sanitary Sewerage
05/01/2018
View/Download |View/Download
CCR
UFGS 33 31 23.00 10 Sanitary Sewer Force Main Piping
08/01/2018
View/Download |View/Download
CCR
UFGS 33 32 16 Packaged Utility Wastewater Pumping Stations
11/01/2019
View/Download |View/Download
CCR
UFGS 33 34 56.00 10 Drainage Field Dosing Chambers
08/01/2018
View/Download |View/Download
CCR
UFGS 33 40 00 Stormwater Utilities
11/01/2021
View/Download |View/Download
CCR
UFGS 33 46 13 Foundation Drainage
05/01/2020
View/Download |View/Download
CCR
UFGS 33 46 16 Subdrainage Piping
05/01/2018
View/Download |View/Download
CCR
UFGS 33 47 13 Pond and Reservoir Liners
11/01/2014
View/Download |View/Download
CCR
UFGS 33 51 15 Natural-Gas / Liquid Petroleum Gas Distribution Pipelines
08/01/2019
View/Download |View/Download
CCR
UFGS 33 51 39 Monitoring Wells
08/01/2017
View/Download |View/Download
CCR
UFGS 33 51 43 Instrumentation and Performance Monitoring of Structures
05/01/2022
View/Download |View/Download
CCR
UFGS 33 52 10 Fuel Systems Piping (Service Station)
11/01/2018
View/Download |View/Download
CCR
UFGS 33 52 23.15 POL Service Piping Welding
11/01/2018
View/Download |View/Download
CCR
UFGS 33 52 40 Fuel Systems Piping (Non-Hydrant)
11/01/2018
View/Download |View/Download
CCR
UFGS 33 52 43.11 Aviation Fuel Mechanical Equipment
08/01/2018
View/Download |View/Download
CCR
UFGS 33 52 43.12 Aviation Fuel Pantographs
08/01/2018
View/Download |View/Download
CCR
UFGS 33 52 43.13 Aviation Fuel Piping
08/01/2018
View/Download |View/Download
CCR
UFGS 33 52 43.14 Aviation Fuel Control Valves
08/01/2018
View/Download |View/Download
CCR
UFGS 33 52 43.23 Aviation Fuel Pumps
08/01/2018
View/Download |View/Download
CCR
UFGS 33 52 43.28 Filter Separator, Aviation Fueling System
08/01/2018
View/Download |View/Download
CCR
UFGS 33 52 80 Liquid Fuels Pipeline Coating Systems
08/01/2022
View/Download |View/Download
CCR
UFGS 33 56 10 Factory-Fabricated Fuel Storage Tanks
05/01/2019
View/Download |View/Download
CCR
UFGS 33 56 19 Fuel Impermeable Liner System
11/01/2022
View/Download |View/Download
CCR
UFGS 33 56 21.17 Single Wall Aboveground Fixed Roof Steel POL Storage Tank
11/01/2018
View/Download |View/Download
CCR
UFGS 33 56 21.18 Single Wall POL Tank Undertank Interstitial Space
11/01/2018
View/Download |View/Download
CCR
UFGS 33 56 53 Compressed Gases Storage Tanks
05/01/2020
View/Download |View/Download
CCR
UFGS 33 57 55 Fuel Systems Components (Non-Hydrant)
11/01/2018
View/Download |View/Download
CCR
UFGS 33 60 02 Aboveground Heat Distribution System
08/01/2024
View/Download |View/Download
CCR
UFGS 33 61 13 Pre-Engineered Underground Heat Distribution System
08/01/2024
View/Download |View/Download
CCR
UFGS 33 61 13.13 Prefabricated Underground Hydronic Energy Distribution
02/01/2016
View/Download |View/Download
CCR
UFGS 33 61 13.19 Valves, Piping, and Equipment in Valve Manholes
02/01/2016
View/Download |View/Download
CCR
UFGS 33 61 14 Exterior Buried Preinsulated Water Piping
02/01/2010
View/Download |View/Download
CCR
UFGS 33 63 13 Exterior Underground Steam Distribution System
02/01/2025
View/Download |View/Download
CCR
UFGS 33 63 13.19 Concrete Trench Hydronic and Steam Energy Distribution
02/01/2016
View/Download |View/Download
CCR
UFGS 33 63 14 Exterior Buried Pumped Condensate Return
04/01/2006
View/Download |View/Download
CCR
UFGS 33 63 16 Exterior Shallow Trench Steam Distribution
07/01/2006
View/Download |View/Download
CCR
UFGS 33 63 23 Exterior Aboveground Steam Distribution
04/01/2006
View/Download |View/Download
CCR
UFGS 33 71 01 Overhead Transmission and Distribution
05/01/2019
View/Download |View/Download
CCR
UFGS 33 71 02 Underground Electrical Distribution
08/01/2021
View/Download |View/Download
CCR
UFGS 33 82 00 Telecommunications Outside Plant (OSP)
04/01/2006
View/Download |View/Download
CCR
DIVISION 34 - TRANSPORTATION
02/01/2025
ZIP
UFGS 34 11 00 Railroad Track and Accessories
04/01/2008
View/Download |View/Download
CCR
UFGS 34 11 19.00 20 Welding Crane and Railroad Rail - Thermite Method
08/01/2018
View/Download |View/Download
CCR
UFGS 34 60 13 Electric Vehicle Charging Facility (EVCF)
08/01/2024
View/Download |View/Download
CCR
UFGS 34 71 13.16 Vehicle Crash Barriers
02/01/2015
View/Download |View/Download
CCR
UFGS 34 73 13 Aircraft Tiedowns
11/01/2019
View/Download |View/Download
CCR
UFGS 34 73 16 Airfield Grounding
11/01/2019
View/Download |View/Download
CCR
UFGS 34 75 13.13 Crash Rated Active Vehicle Barriers And Controls
02/01/2022
View/Download |View/Download
CCR
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
02/01/2025
ZIP
UFGS 35 01 41.00 10 Electromechanical Operating Machinery for Locks and Dams
08/01/2020
View/Download |View/Download
CCR
UFGS 35 01 70.13 Wire Rope for Gate Operating Devices
05/01/2021
View/Download |View/Download
CCR
UFGS 35 05 40.14 10 Hydraulic Power Systems for Civil Works Structures
11/01/2023
View/Download |View/Download
CCR
UFGS 35 05 40.17 Self-Lubricated Materials, Fabrication, Handling, and Assembly
08/01/2020
View/Download |View/Download
CCR
UFGS 35 20 14 Stoplogs
08/01/2022
View/Download |View/Download
CCR
UFGS 35 20 15 FRP Composites for Low-Head Water Control Structures
08/01/2018
View/Download |View/Download
CCR
UFGS 35 20 16.33 Hydraulic Miter Gates
08/01/2022
View/Download |View/Download
CCR
UFGS 35 20 16.39 Hydraulic Sector Gates
08/01/2022
View/Download |View/Download
CCR
UFGS 35 20 16.46 Hydraulic Tainter Gates and Anchorages
08/01/2022
View/Download |View/Download
CCR
UFGS 35 20 16.53 Hydraulic Vertical Lift Gates
08/01/2022
View/Download |View/Download
CCR
UFGS 35 20 16.54 Slide Gates and Actuators
05/01/2021
View/Download |View/Download
CCR
UFGS 35 20 16.59 Closure Gates
08/01/2022
View/Download |View/Download
CCR
UFGS 35 20 20 Electrical Equipment for Gate Hoist
05/01/2022
View/Download |View/Download
CCR
UFGS 35 20 23 Dredging
08/01/2020
View/Download |View/Download
CCR
UFGS 35 20 23.13 National Dredging Quality Management Program - Scow [Monitoring][ and ][Ullage] Profile
02/01/2022
View/Download |View/Download
CCR
UFGS 35 20 23.23 National Dredging Quality Management Program - Hopper Dredge
02/01/2022
View/Download |View/Download
CCR
UFGS 35 20 23.33 National Dredging Quality Management Program - Pipeline Hydraulic Dredge
02/01/2022
View/Download |View/Download
CCR
UFGS 35 31 19.20 Articulating Concrete Block Revetments
11/01/2023
View/Download |View/Download
CCR
UFGS 35 41 00 Levee Construction
11/01/2018
View/Download |View/Download
CCR
UFGS 35 42 34 Reinforced Soil Slope
08/01/2020
View/Download |View/Download
CCR
UFGS 35 45 01 Vertical Pumps, Axial-Flow and Mixed-Flow Impeller-Type
02/01/2021
View/Download |View/Download
CCR
UFGS 35 45 02.00 10 Submersible Pump, Axial-Flow and Mixed-Flow Type
05/01/2021
View/Download |View/Download
CCR
UFGS 35 45 03.00 10 Speed Reducers for Storm Water Pumps
05/01/2022
View/Download |View/Download
CCR
UFGS 35 45 04.00 10 Submersible Pump, Centrifugal Type
11/01/2020
View/Download |View/Download
CCR
UFGS 35 51 13.00 20 Concrete Floating Pier for Small Craft
04/01/2006
View/Download |View/Download
CCR
UFGS 35 59 13.13 Prestressed Concrete Fender Piling
08/01/2009
View/Download |View/Download
CCR
UFGS 35 59 13.14 20 Polymeric Piles
02/01/2018
View/Download |View/Download
CCR
UFGS 35 59 13.16 Extruded and Molded Marine Fenders
11/01/2021
View/Download |View/Download
CCR
UFGS 35 59 13.17 Foam-Filled Marine Fenders
11/01/2021
View/Download | ZIP
CCR
UFGS 35 59 13.18 Pneumatic and Hydro-Pneumatic Marine Fenders
11/01/2021
View/Download |View/Download
CCR
UFGS 35 73 13 Embankment for Earth and Rockfill Dams
11/01/2018
View/Download |View/Download
CCR
UFGS35 31 19.40 Stone Revetments
11/01/2024
View/Download |View/Download
CCR
DIVISION 40 - PROCESS INTEGRATION
02/01/2025
ZIP
UFGS 40 05 13 Pipelines, Liquid Process Piping
10/01/2007
View/Download |View/Download
CCR
UFGS 40 05 13.96 Welding Process Piping
05/01/2010
View/Download |View/Download
CCR
UFGS 40 17 26.00 20 Welding Pressure Piping
04/01/2006
View/Download |View/Download
CCR
UFGS 40 60 00 Process Control
05/01/2020
View/Download |View/Download
CCR
DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT
02/01/2025
ZIP
UFGS 41 22 13.14 Bridge Cranes, Overhead Electric, Top Running
11/01/2019
View/Download |View/Download
CCR
UFGS 41 22 13.15 Bridge Cranes, Overhead Electric, Under Running Trolley
11/01/2022
View/Download |View/Download
CCR
UFGS 41 22 13.16 Gantry Cranes
04/01/2008
View/Download |View/Download
CCR
UFGS 41 22 13.33 Portal Crane Track Installation
05/01/2010
View/Download |View/Download
CCR
UFGS 41 22 13.55 Bridge Cranes, Under Running, Aircraft Hangar
02/01/2022
View/Download |View/Download
CCR
UFGS 41 22 23.19 Monorail Hoists
05/01/2020
View/Download |View/Download
CCR
UFGS 41 36 30.00 10 Ultrasonic Inspection of Plates
01/01/2008
View/Download |View/Download
CCR
UFGS 41 65 10.00 10 [Diesel] [Natural Gas] Fueled Engine Pump Drives
05/01/2009
View/Download |View/Download
CCR
DIVISION 43 - PROCESS GAS AND LIQUID HANDLING, PURIFICATION AND STORAGE EQUIPMENT
02/01/2025
ZIP
UFGS 43 11 00.10 Off-Gas Fans, Blowers and Pumps
05/01/2020
View/Download |View/Download
CCR
UFGS 43 15 00.00 20 Low Pressure Compressed Air Piping (Non-Breathing Air Type)
04/01/2006
View/Download |View/Download
CCR
UFGS 43 21 29 Flow Measuring Equipment (Potable Water) (Sewage Treatment Plant)
04/01/2006
View/Download |View/Download
CCR
UFGS 43 31 13.13 10 Activated Carbon-Gas and Liquid Purification Filters
08/01/2018
View/Download |View/Download
CCR
DIVISION 44 - POLLUTION AND WASTE CONTROL EQUIPMENT
02/01/2025
ZIP
UFGS 44 10 00 Air Pollution Control
11/01/2022
View/Download |View/Download
CCR
UFGS 44 13 10.13 Vapor Phase Activated Carbon Adsorption Units
05/01/2020
View/Download |View/Download
CCR
UFGS 44 13 51 Thermal Oxidation Equipment
05/01/2020
View/Download |View/Download
CCR
UFGS 44 41 00 Water Pollution Containment And Cleanup Equipment
08/01/2020
View/Download |View/Download
CCR
DIVISION 46 - WATER AND WASTEWATER EQUIPMENT
02/01/2025
ZIP
UFGS 46 07 13.13 Precipitation/Coagulation/Flocculation (P/C/F) Water Treatment
05/01/2021
View/Download |View/Download
CCR
UFGS 46 07 53 Packaged Wastewater Treatment Equipment
02/01/2020
View/Download |View/Download
CCR
UFGS 46 20 20 Sewage Bar Screen and Mechanical Shredder
05/01/2021
View/Download |View/Download
CCR
UFGS 46 23 00 Grit Removal and Handling Equipment
02/01/2020
View/Download |View/Download
CCR
UFGS 46 24 16 Comminutors
05/01/2021
View/Download |View/Download
CCR
UFGS 46 25 14 Coalescing [or Vertical Tube] Oil-Water Separators
02/01/2011
View/Download |View/Download
CCR
UFGS 46 30 00 Water and Wastewater Chemical Feed Systems
08/01/2017
View/Download |View/Download
CCR
UFGS 46 30 13 Advanced Oxidation Processes (AOP)
02/01/2011
View/Download |View/Download
CCR
UFGS 46 31 11 Chlorine Gas Feed Equipment
08/01/2017
View/Download |View/Download
CCR
UFGS 46 43 21 Circular Clarifier Equipment
02/01/2020
View/Download |View/Download
CCR
UFGS 46 51 00.00 10 Air and Gas Diffusion System
05/01/2021
View/Download |View/Download
CCR
UFGS 46 53 22 Trickling Filter
05/01/2018
View/Download |View/Download
CCR
UFGS 46 53 62 Continuous Loop Reactor (CLR) Wastewater Treatment System
05/01/2021
View/Download |View/Download
CCR
UFGS 46 61 00 Filtration Equipment
05/01/2021
View/Download |View/Download
CCR
UFGS 46 66 56 Open-Channel Disinfection Equipment
05/01/2021
View/Download |View/Download
CCR
UFGS 46 71 16 Gravity Belt Thickeners
02/01/2011
View/Download |View/Download
CCR
DIVISION 48 - ELECTRICAL POWER GENERATION
02/01/2025
ZIP
UFGS 48 06 15 Turbine Oil
11/01/2023
View/Download |View/Download
CCR
UFGS 48 14 00 Solar Photovoltaic Systems
05/01/2017
View/Download |View/Download
CCR
UFGS 48 14 13.00 20 Solar Liquid Flat Plate and Evacuated Tube Collectors
05/01/2015
View/Download |View/Download
CCR
UFGS 48 15 00 Wind Generator System
05/01/2017
View/Download |View/Download
CCR
UFGS 48 16 00 Landfill Gas Systems
05/01/2017
View/Download |View/Download
CCR