History: Below is a listing of the Revisions and Changes made to this UFGS.

KEYPREPARING ACTIVITY (PA)A ArmyN NavyF Air ForceS NASA [ARCHIVED]
ACTIONN NewR RevisionC ChangeD Deletion
Release PA Action Change # Nature of Change or Revision
Nov-2020 N C 1 Updated Reference Article and paragraphs "Contractor Qualifications" (1.4.1), "Flange Gaskets, Non-Electrically Isolating" (2.2.3), "Insulating Flange Kits, (Electrically Isolating)" (2.3.2), and "Swing Type Check Valves" (2.6.3) to clarify and incorporate CCRs.
Nov-2018 N R Complete review and update including Section title change from SERVICE PIPING FUEL SYSTEMS; Preparing Activity changed from Army to Navy
Apr-2008 A N Superseding UFGS 23 11 13.00 20 Fuel Oil Piping and UFGS 23 11 16.00 20 Fiberglass Reinforced Piping (FRP) Piping (for Petroleum)