Status
              Active
          Publish Date
              Pages
              48
          Spec. Division
              33 - Utilities
          CCR
              
          History: Below is a listing of the Revisions and Changes made to this UFGS.
| KEY | PREPARING ACTIVITY (PA) | A Army | N Navy | F Air Force | S NASA [ARCHIVED] | 
|---|---|---|---|---|---|
| ACTION | N New | R Revision | C Change | D Deletion | 
| Release | PA | Date | Action | Change # | Nature of Change or Revision | 
|---|---|---|---|---|---|
| Nov-2020 | N | Nov-2018 | C | 1 | Updated Reference Article and paragraphs "Contractor Qualifications" (1.4.1), "Flange Gaskets, Non-Electrically Isolating" (2.2.3), "Insulating Flange Kits, (Electrically Isolating)" (2.3.2), and "Swing Type Check Valves" (2.6.3) to clarify and incorporate CCRs. | 
| Nov-2018 | N | Nov-2018 | R | Complete review and update including Section title change from SERVICE PIPING FUEL SYSTEMS; Preparing Activity changed from Army to Navy | |
| Apr-2008 | A | Apr-2008 | N | Superseding UFGS 23 11 13.00 20 Fuel Oil Piping and UFGS 23 11 16.00 20 Fiberglass Reinforced Piping (FRP) Piping (for Petroleum) | 
 
         
 
 
 
 
 
 
 
 
