Series
1 - POLICY, PROCEDURES AND GUIDANCE
1-300: PROCEDURES AND GUIDANCE
CCR
Summary
This UFS provides guidance for the preparation of UFGS and establishes the general content and format of UFGS and project specifications. Each DWG is responsible for the technical content, format, and overall quality of their UFGS. Publication of UFGS is available by electronic media, not proprietary, and at no cost to the user.
Preparers for both UFGS Masters and project specifications must use this UFS. Specific guidance for each is provided as applicable.
Superseded Versions
PDF Download ufc_1_300_02_2014_c3.pdf" target="_blank">UFC 1-300-02 UFGS Format Standard, with Change 3 05-18-2021)
PDF Download ufc_1_300_02_2014_c2.pdf" target="_blank">UFC 1-300-02 UFGS Format Standard, with Change 2 04-01-2019)
PDF Download ufc_1_300_02_2014_c1.pdf" target="_blank">UFC 1-300-02 UFGS Format Standard, with Change 1 04-01-2017)
PDF Download ufc_1_300_02_2014.pdf" target="_blank">UFC 1-300-02 UFGS Format Standard (04-01-2014)
PDF Download ufc_1_300_02_2004_c4.pdf" target="_blank">UFC 1-300-02 UFGS Format Standard, with Change 4 (12-04-2006)
PDF Download ufc_1_300_02_2004_c3.pdf" target="_blank">UFC 1-300-02 UFGS Format Standard, with Change 3 (01-06-2006)