Status
Active
View/Download
PDF   ZIP  
Publish Date
Pages
24
Spec. Division
33 - Utilities
CCR

History: Below is a listing of the Revisions and Changes made to this UFGS.

KEYPREPARING ACTIVITY (PA)A ArmyN NavyF Air ForceS NASA [ARCHIVED]
ACTIONN NewR RevisionC ChangeD Deletion
Release PA Action Change # Nature of Change or Revision
Nov-2023 A C 1 Incorporated various CCRs.
Nov-2019 A C 1 Administrative Change: Preparing Activity changed from NASA to Air Force.
Nov-2019 N R Revised to combine Section 33 32 16 Packaged Utility Wastewater Pumping Stations with Section 33 32 13.13 Packaged Sewage Lift Stations, Wet Well Type. Preparing Activity changed from NAVFAC to NASA.
Aug-2016 N N Superseding Section 33 32 13.14 Packaged Sewage Lift Stations, Grinder Pump Type. Includes updates to format as well as technical updates and adding non clog submersible pipe.