| Nov-2025 |
N
|
UFGS 01 78 23 Operation and Maintenance Data |
May-2023 |
C
|
2 |
In response to CCR 17101, metric units have been corrected in General Facility and Systems Description paragraph (1.6.2.1) |
| Nov-2025 |
N
|
UFGS 22 15 19.13 20 Large Nonlubricated Reciprocating Air Compressors (Over 300 HP) |
Nov-2009 |
D
|
|
Superseded by new unified section UFGS-22 15 19.13 LARGE NONLUBRICATED RECIPROCATING AIR COMPRESSORS (OVER 100 HP)Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
| Nov-2025 |
A
|
UFGS 22 15 19.13 Large Nonlubricated Reciprocating Air Compressors (Over 100 HP) |
Nov-2025 |
N
|
|
Superseding UFGS 22 15 19.13 20 LARGE NONLUBRICATED RECIPROCATING AIR COMPRESSORS (OVER 300 HP). Complete review and update including section number and title changes. |
| Nov-2025 |
N
|
UFGS 22 15 19.19 20 Nonlubricated Rotary Screw Air Compressors (100 HP and Larger) |
May-2011 |
D
|
|
Superseded by new unified section UFGS-22 15 19.19 NONLUBRICATED ROTARY SCREW AIR COMPRESSORS (100 HP AND LARGERNote: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
| Nov-2025 |
A
|
UFGS 22 15 19.19 Nonlubricated Rotary Screw Air Compressors (100 HP and Larger) |
Nov-2025 |
N
|
|
Superseding UFGS 22 15 19.19 20 NONLUBRICATED ROTARY SCREW AIR COMPRESSORS (100 HP AND LARGER). Complete review and update including section number change. |
| Nov-2025 |
A
|
UFGS 22 15 26 Compressed Air Piping Systems (Up to 5000 PSI) |
Nov-2025 |
N
|
|
Superseding UFGS 22 15 26.00 20 HIGH AND MEDIUM PRESURE COMPRESSED AIR PIPING SYSTEMS (UP TO 5000 PSI). Complete review and update including section number and title changes. |
| Nov-2025 |
N
|
UFGS 22 15 26.00 20 High and Medium Pressure Compressed Air Piping |
Apr-2006 |
D
|
|
Superseded by new unified section UFGS-22 15 26 COMPRESSED AIR PIPING SYSTEMS (UP TO 5000 PSI)Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
| Nov-2025 |
N
|
UFGS 22 16 19.26 20 Large Centrifugal Air Compressors (Over 200 HP) |
Nov-2009 |
D
|
|
Superseded by new unified section UFGS-22 16 19.26 Large Centrifugal Air Compressors (Over 100 HP)Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
| Nov-2025 |
A
|
UFGS 22 16 19.26 Large Centrifugal Air Compressors (Over 100 HP) |
Nov-2025 |
N
|
|
Superseding UFGS 22 16 19.26 20 LARGE CENTRIFUGAL AIR COMPRESSORS (OVER 200 HP). Complete review and update including section number and title changes. |
| Nov-2025 |
N
|
UFGS 23 03 00 Basic Mechanical Materials and Methods |
Nov-2025 |
N
|
|
New unified section superseding UFGS-23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS |
| Nov-2025 |
N
|
UFGS 23 03 00.00 20 Basic Mechanical Materials and Methods |
Aug-2010 |
D
|
|
Superseded by new unified section UFGS-23 03 00 BASIC MECHANICAL MATERIALS AND METHODSNote: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
| Nov-2025 |
N
|
UFGS 23 64 26 Chilled, Chilled-Hot, and Condenser Water Piping Systems |
Nov-2025 |
R
|
|
Revision of August 2009 version. |
| Nov-2025 |
A
|
UFGS 27 05 26 Grounding and Bonding for Communications Systems |
Nov-2025 |
N
|
|
New UFGS section. |
| Nov-2025 |
A
|
UFGS 27 05 29.00 10 Protective Distribution System (PDS) for SIPRNET Communication Systems |
Nov-2025 |
R
|
|
Complete review and update. |
| Nov-2025 |
A
|
UFGS 35 20 16.54 Slide Gates and Actuators |
May-2021 |
C
|
1 |
Incorporated various CCRs. |
| Nov-2025 |
N
|
UFGS 41 22 13.55 Bridge Cranes, Aircraft Maintenance Hangar |
Nov-2025 |
R
|
|
Comprehensive review and significant overhaul of the specification: clarified terminology, revised submittal requirements, updated technical and testing criteria, and alignment with current crane standards. Title changed from BRIDGE CRANES, UNDER RUNNING, AIRCRAFT HANGAR to BRIDGE CRANES, AIRCRAFT MAINTENANCE HANGAR. |
| Nov-2025 |
A
|
UFGS 41 65 10 [Diesel] [Natural Gas] Fueled Engine [Pump] Drives |
Nov-2025 |
N
|
|
Superseding UFGS 41 65 10.00 10 [DIESEL][NATURAL GAS] FUELED ENGINE PUMP DRIVES. Complete review and update including section number change. |
| Nov-2025 |
A
|
UFGS 41 65 10.00 10 [Diesel] [Natural Gas] Fueled Engine Pump Drives |
May-2009 |
D
|
|
Superseded by UFGS 41 65 10 [DIESEL] [NATURAL GAS] FUELED ENGINE [PUMP] DRIVES.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
| Nov-2025 |
N
|
UFGS 43 15 00.00 20 Low Pressure Compressed Air Piping (Non-Breathing Air Type) |
Apr-2006 |
D
|
|
Superseded by new unified section UFGS 22 15 26 COMPRESSED AIR PIPING SYSTEMS (UP TO 5000 PSI).Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
| Aug-2025 |
N
|
UFGS 01 32 16.00 20 Small Project Construction Progress Schedules |
Aug-2018 |
D
|
|
Section archived; Superseded by UFGS 01 32 17.00 20 Cost-Loaded Network Analysis Schedules (NAS) for NAVFAC Design-Build projects. |
| Aug-2025 |
N
|
UFGS 01 33 29 Sustainability Requirements and Reporting |
Feb-2021 |
C
|
1 |
Section changes to align with UFC 1-200-02 High Performance and Sustainable Building Requirements, Change 3 (July 08, 2025) |
| Aug-2025 |
N
|
UFGS 01 35 13 Special Project Procedures |
Nov-2020 |
C
|
2 |
In response to CCR 16609, Annual Pearl Harbor "Hydrofest" is no longer a standard for NAVFAC HI Projects and has been deleted (3.2.5). |
| Aug-2025 |
N
|
UFGS 01 45 00 Quality Control |
Aug-2023 |
C
|
3 |
In response to CCR 16473, "quality control" has been added to list item d. in paragraph Quality Control (QC) Meetings (1.5.1.3). |
| Aug-2025 |
N
|
UFGS 01 57 19 Temporary Environmental Controls |
Aug-2022 |
C
|
2 |
In response to CCR 16848, updated Recyclables paragraph (1.2.20.6). |
| Aug-2025 |
A
|
UFGS 02 81 00 Transportation and Disposal of Hazardous Materials |
Aug-2025 |
R
|
|
Complete review and update. |
| Aug-2025 |
N
|
UFGS 02 82 00 Asbestos Remediation |
Aug-2025 |
R
|
|
Complete review and update. |
| Aug-2025 |
N
|
UFGS 02 83 00 Lead Remediation |
Aug-2025 |
R
|
|
Complete review and update. |
| Aug-2025 |
N
|
UFGS 02 85 00 Mold Remediation |
Aug-2025 |
R
|
|
Complete review and update. |
| Aug-2025 |
N
|
UFGS 03 30 00 Cast-In-Place Concrete |
Feb-2019 |
C
|
10 |
In response to the following CCRs: 13637 - added ASTM references, updated paragraphs "Admixtures" (2.3.4 e), "Properties and Requirements" (2.5.1 f and g), "Strength ofConcrete Required for Removal of Formwork" (3.3.10), "Mixing" (3.6.2 b), "Concrete Sampling" (3.14.2), "Slump Tests" (3.14.3.1), "Compressive Strength Tests" (3.14.3.4), and "Air Content" (3.14.3.5). Added new paragraph "Slump Flow and Visual Stability Index Tests" (3.14.3.2); CCRs 13637, 15345, and 16154 - updated Submittal Article SD-03 and SD-06; CCR 15427 - replaced reference "ACI 308.1" with “ACI SPEC 308.1"; CCR 15860 - updated paragraph "Normal-Weight Aggregate" (2.3.3.1 a) to include reference to ACI 302.1R, Table 8.5.1; CCR 16032 - added Note and updated "Welding" paragraph (2.6.8 a). |
| Aug-2025 |
N
|
UFGS 03 45 00 Precast Architectural Concrete |
May-2016 |
C
|
3 |
In response to CCR 15942, updated Fabricator Quality Certifications paragraph (1.8.1), with current PCI Certification Types. |
| Aug-2025 |
A
|
UFGS 04 03 00 Conservation Treatment for Period Masonry |
Aug-2025 |
R
|
|
Complete review and update. |
| Aug-2025 |
A
|
UFGS 04 23 00 Glass Unit Masonry |
Aug-2025 |
R
|
|
Complete review and update. |
| Aug-2025 |
N
|
UFGS 05 50 13 Miscellaneous Metal Fabrications |
Aug-2024 |
C
|
1 |
Updated paragraphs CORNER GUARDS (2.4) and MISCELLANEOUS PLATES AND SHAPES (2.9) to require "hot dip galvanized". |
| Aug-2025 |
A
|
UFGS 06 41 16.00 10 Plastic-Laminate-Clad Architectural Cabinets |
Aug-2025 |
R
|
|
Complete review and update. |
| Aug-2025 |
N
|
UFGS 07 12 00 Built-Up Bituminous Waterproofing |
Aug-2025 |
R
|
|
Complete review and update. |
| Aug-2025 |
N
|
UFGS 07 13 53 Elastomeric Sheet Waterproofing |
Aug-2025 |
R
|
|
Complete review and update. |
| Aug-2025 |
N
|
UFGS 07 17 00 Bentonite Waterproofing |
Aug-2025 |
R
|
|
Complete review and update. |
| Aug-2025 |
N
|
UFGS 07 18 16 Cold Liquid-Applied Reinforced Polymethyl Methacrylate Roofing |
Aug-2025 |
N
|
|
New UFGS Section to address requirements for PMMA roofing applied over existing or new roofing systems in accordance with UFC 3-110-03 recommendations. |
| Aug-2025 |
N
|
UFGS 07 21 13 Board and Block Insulation |
Aug-2023 |
C
|
1 |
In response to CCR 15491, updated list items in Vapor Retarder under Floor Slab paragraph (2.2.3).. |
| Aug-2025 |
N
|
UFGS 07 21 16 Mineral Fiber Blanket Insulation |
Aug-2023 |
C
|
1 |
In response to CCRs 14183 and 14753 updated requirement for list item b. Mineral Wool in Recycled Materials paragraph (2.1.1). |
| Aug-2025 |
N
|
UFGS 07 31 13 Asphalt Shingles |
Aug-2025 |
R
|
|
Complete review and update. |
| Aug-2025 |
A
|
UFGS 07 31 26 Slate Shingles |
Aug-2025 |
R
|
|
Complete review and update. |
| Aug-2025 |
A
|
UFGS 07 31 26 Slate Shingles |
Aug-2025 |
R
|
|
Complete review and update. |
| Aug-2025 |
N
|
UFGS 07 32 13 Concrete Tile Roofing Replacement or Repair |
Aug-2025 |
R
|
|
Complete review and update including title change; from "ROOF TILES" to "CONCRETE TILE ROOFING REPLACEMENT OR REPAIR". |
| Aug-2025 |
N
|
UFGS 07 32 14 Clay Tile Roofing Replacement or Repair |
Aug-2025 |
R
|
|
Complete review and update. |
| Aug-2025 |
N
|
UFGS 07 41 13 Metal Roof Panels |
Aug-2025 |
R
|
|
Complete review and update. |
| Aug-2025 |
A
|
UFGS 07 41 13.16 Copper Roof Panels |
Aug-2025 |
R
|
|
Complete review and update. |
| Aug-2025 |
A
|
UFGS 07 41 63 Fabricated Roof Panel Assemblies |
Aug-2025 |
R
|
|
Complete review and update. |
| Aug-2025 |
N
|
UFGS 07 42 13 Metal Wall Panels |
Aug-2025 |
R
|
|
Complete review and update. |
| Aug-2025 |
N
|
UFGS 07 42 63 Fabricated Wall Panel Assemblies |
Aug-2025 |
R
|
|
Complete review and update. |
| Aug-2025 |
N
|
UFGS 07 51 13 Built-Up Asphalt Roofing |
Aug-2025 |
R
|
|
Complete review and update. |
| Aug-2025 |
N
|
UFGS 07 52 00 Modified Bituminous Membrane Roofing |
Aug-2025 |
R
|
|
Complete review and update. |
| Aug-2025 |
N
|
UFGS 07 53 23 Ethylene-Propylene-Diene-Monomer Roofing |
Aug-2025 |
R
|
|
Complete review and update. |
| Aug-2025 |
A
|
UFGS 07 54 23 Thermoplastic-Polyolefin Roofing |
Aug-2025 |
N
|
|
New UFGS Section to address requirements for thermoplastic polyolefin (TPO) thermoplastic sheet roofing. |
| Aug-2025 |
A
|
UFGS 07 55 00 Protected Membrane Roofing (PMR) |
Aug-2025 |
R
|
|
Complete review and update. |
| Aug-2025 |
N
|
UFGS 07 56 00.60 Mesh Reinforced Elastomeric Coating (MREC) Roofing |
Aug-2025 |
N
|
|
New UFGS Section to address requirements for MREC roofing applied over existing roofing systems in accordance with UFC 3-110-03 recommendations. |
| Aug-2025 |
N
|
UFGS 07 57 13 Sprayed Polyurethane Foam (SPF) Roofing |
Aug-2025 |
R
|
|
Complete review and update. |
| Aug-2025 |
N
|
UFGS 07 61 14 Steel Standing Seam Roofing |
Aug-2025 |
N
|
|
New unified Section; superseding UFGS-07 61 14.00 20 STEEL STANDING SEAM ROOFING. |
| Aug-2025 |
N
|
UFGS 07 61 14 Steel Standing Seam Roofing |
Aug-2025 |
N
|
|
New unified Section; superseding UFGS-07 61 14.00 20 STEEL STANDING SEAM ROOFING. |
| Aug-2025 |
N
|
UFGS 07 61 14.00 20 Steel Standing Seam Roofing |
Aug-2016 |
D
|
|
Superseded by unified Section UFGS-07 61 14 STEEL STANDING SEAM ROOFING.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
| Aug-2025 |
N
|
UFGS 07 61 15 Aluminum Standing Seam Roofing |
Aug-2025 |
N
|
|
New unified section; superseding UFGS-07 61 15.00 20 ALUMINUM STANDING SEAM ROOFING. |
| Aug-2025 |
A
|
UFGS 07 62 13 Copper Sheet Metal Flashing and Trim |
Aug-2025 |
R
|
|
Complete review and update. |
| Aug-2025 |
N
|
UFGS 08 11 13 Steel Doors and Frames |
Aug-2020 |
C
|
1 |
In response to the following CCRs: 15239 - updated U-Factor values in paragraph Insulation Cores; 16041 updated paragraphs Standard Steel Doors (2.1) and Standard Steel Frames (2.6). |
| Aug-2025 |
A
|
UFGS 08 13 73 Sliding Metal Doors |
Aug-2025 |
R
|
|
Complete review and update. |
| Aug-2025 |
A
|
UFGS 08 33 13 Coiling Counter Doors |
Aug-2025 |
R
|
|
Complete review and update. |
| Aug-2025 |
A
|
UFGS 08 34 58 File Room Doors and Frames |
Aug-2025 |
R
|
|
Complete review and update. |
| Aug-2025 |
A
|
UFGS 08 34 59 Vault Doors and Day Gates |
Aug-2025 |
R
|
|
Complete review and update. |
| Aug-2025 |
A
|
UFGS 08 87 23.13 Safety Films |
Aug-2009 |
D
|
|
Archived with no replacement.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
| Aug-2025 |
A
|
UFGS 09 64 23 Wood Parquet Flooring |
Aug-2016 |
D
|
|
Archived with no replacement.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
| Aug-2025 |
N
|
UFGS 09 97 23.16 Linseed Oil Protection of Concrete Surfaces |
Aug-2024 |
D
|
|
Archived with no replacement; Section uses old technology, any relevant information is covered in other UFGS sections.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
| Aug-2025 |
A
|
UFGS 11 46 00 Food Dispensing Equipment |
Aug-2025 |
R
|
|
Complete review and update. |
| Aug-2025 |
N
|
UFGS 12 35 30.23 20 Bathroom Casework |
Aug-2011 |
D
|
|
Archived with no replacement.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
| Aug-2025 |
A
|
UFGS 12 35 39 Commercial Kitchen Casework |
Aug-2017 |
D
|
|
Archived with no replacement.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
| Aug-2025 |
N
|
UFGS 14 21 13 Electric Traction Freight Elevators |
Aug-2025 |
R
|
|
Complete review and update. |
| Aug-2025 |
N
|
UFGS 14 21 23 Electric Traction Passenger Elevators |
Aug-2025 |
R
|
|
Complete review and update. |
| Aug-2025 |
N
|
UFGS 14 24 13 Hydraulic Freight Elevators |
Aug-2025 |
R
|
|
Complete review and update. |
| Aug-2025 |
N
|
UFGS 14 24 23 Hydraulic Passenger Elevators |
Aug-2025 |
R
|
|
Complete review and update. |
| Aug-2025 |
N
|
UFGS 22 33 30 Solar Water Heating Equipment |
Aug-2025 |
N
|
|
New unified Section covering requirements for solar domestic and service water heating equipment. This section supersedes UFGS-22 33 30.00 10 SOLAR WATER HEATING EQUIPMENT and UFGS-48 14 13.00 20 SOLAR LIQUID FLAT PLATE AND EVACUATED TUBE COLLECTORS. |
| Aug-2025 |
A
|
UFGS 22 33 30.00 10 Solar Water Heating Equipment |
Aug-2020 |
D
|
|
Superseded by UFGS 22 33 30 SOLAR WATER HEATING EQUIPMENT.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
| Aug-2025 |
A
|
UFGS 23 09 00 Instrumentation and Control for HVAC |
Aug-2024 |
C
|
1 |
Incorporated various CCRs.. |
| Aug-2025 |
A
|
UFGS 23 50 52.00 10 Central High Temperature Water (HTW) Generating Plant and Auxiliaries |
Feb-2016 |
D
|
|
Archived with no replacement.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
| Aug-2025 |
A
|
UFGS 23 58 00.00 10 Central Steam Heating and Utilities Systems |
May-2020 |
D
|
|
Archived with no replacement.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
| Aug-2025 |
A
|
UFGS 25 10 10 Utility Monitoring and Control System (UMCS) Front End and Integration |
Feb-2019 |
C
|
2 |
Incorporated various CCRs. |
| Aug-2025 |
A
|
UFGS 25 10 10 Utility Monitoring and Control System (UMCS) Front End and Integration |
Feb-2019 |
C
|
2 |
Incorporated various CCRs. |
| Aug-2025 |
A
|
UFGS 26 05 13 Medium-Voltage Cables |
Aug-2025 |
N
|
|
New Section superseding UFGS 26 05 13.00 10 MEDIUM-VOLTAGE CABLES. |
| Aug-2025 |
A
|
UFGS 26 05 13.00 10 Medium-Voltage Cables |
Nov-2023 |
D
|
|
Superseded by UFGS 26 05 13 MEDIUM-VOLTAGE CABLES.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
| Aug-2025 |
N
|
UFGS 26 20 00 Interior Distribution System |
May-2025 |
C
|
1 |
Telecommunications systems information removed and relocated to UFGS-27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM. |
| Aug-2025 |
A
|
UFGS 33 46 13 Foundation Drainage |
May-2020 |
D
|
|
Archived with no replacement.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
| Aug-2025 |
A
|
UFGS 33 56 53 Compressed Gases Storage Tanks |
May-2020 |
D
|
|
Archived with no replacement.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
| Aug-2025 |
N
|
UFGS 33 57 55 Fuel Systems Components (Non-Hydrant) |
Aug-2025 |
R
|
|
Complete review and update. |
| Aug-2025 |
A
|
UFGS 43 11 00.10 Off-Gas Fans, Blowers and Pumps |
May-2020 |
D
|
|
Archived with no replacement.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
| Aug-2025 |
A
|
UFGS 44 13 10.13 Vapor Phase Activated Carbon Adsorption Units |
May-2020 |
D
|
|
Archived with no replacement.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
| Aug-2025 |
A
|
UFGS 44 13 51 Thermal Oxidation Equipment |
May-2020 |
D
|
|
Archived with no replacement.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
| Aug-2025 |
A
|
UFGS 46 30 13 Advanced Oxidation Processes (AOP) |
Aug-2025 |
R
|
|
Complete review and update. |
| Aug-2025 |
A
|
UFGS 46 71 16 Gravity Belt Thickeners |
Aug-2025 |
R
|
|
Complete review and update. |
| Aug-2025 |
N
|
UFGS 48 14 13.00 20 Solar Liquid Flat Plate and Evacuated Tube Collectors |
May-2015 |
D
|
|
Section archived; Superseded by unified section UFGS 22 33 30 SOLAR WATER HEATING EQUIPMENT.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
| May-2025 |
N
|
UFGS 01 11 00 Summary of Work |
Feb-2024 |
C
|
1 |
In response to the following: CCR 14812, added "dual frequency" to GPR in paragraph LOCATION OF UNDERGROUND UTILITIES (1.5); CCR 15262, changed to initial capital "Contract" in four locations; and CCR 16075, added new bracketed paragraph Utility Locations (1.5.2) to address requirements for locating underground utilities. |
| May-2025 |
N
|
UFGS 01 14 00 Work Restrictions |
Nov-2022 |
C
|
5 |
In response to the following: CCR 15090, updated paragraph Extraordinary Security Requirements (1.14.1.1) and CCR 16084, removed duplicate paragraph Personnel List under Employment Restrictions For NAVFAC SW (1.6.18). |
| May-2025 |
N
|
UFGS 01 32 17.00 20 Cost-Loaded Network Analysis Schedules (NAS) |
May-2025 |
R
|
|
Complete review and update. |
| May-2025 |
A
|
UFGS 01 32 33.00 10 Photographic Documentation |
May-2025 |
N
|
|
New UFGS Section to address requirements for Photographic Documentation on all contract delivery types. |