| Aug-2025 |
A
|
UFGS 12 35 39 Commercial Kitchen Casework |
Aug-2017 |
D
|
|
Archived with no replacement.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
| Aug-2025 |
N
|
UFGS 14 21 13 Electric Traction Freight Elevators |
Aug-2025 |
R
|
|
Complete review and update. |
| Aug-2025 |
N
|
UFGS 14 21 23 Electric Traction Passenger Elevators |
Aug-2025 |
R
|
|
Complete review and update. |
| Aug-2025 |
N
|
UFGS 14 24 13 Hydraulic Freight Elevators |
Aug-2025 |
R
|
|
Complete review and update. |
| Aug-2025 |
N
|
UFGS 14 24 23 Hydraulic Passenger Elevators |
Aug-2025 |
R
|
|
Complete review and update. |
| Aug-2025 |
N
|
UFGS 22 33 30 Solar Water Heating Equipment |
Aug-2025 |
N
|
|
New unified Section covering requirements for solar domestic and service water heating equipment. This section supersedes UFGS-22 33 30.00 10 SOLAR WATER HEATING EQUIPMENT and UFGS-48 14 13.00 20 SOLAR LIQUID FLAT PLATE AND EVACUATED TUBE COLLECTORS. |
| Aug-2025 |
A
|
UFGS 22 33 30.00 10 Solar Water Heating Equipment |
Aug-2020 |
D
|
|
Superseded by UFGS 22 33 30 SOLAR WATER HEATING EQUIPMENT.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
| Aug-2025 |
A
|
UFGS 23 09 00 Instrumentation and Control for HVAC |
Aug-2024 |
C
|
1 |
Incorporated various CCRs.. |
| Aug-2025 |
A
|
UFGS 23 50 52.00 10 Central High Temperature Water (HTW) Generating Plant and Auxiliaries |
Feb-2016 |
D
|
|
Archived with no replacement.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
| Aug-2025 |
A
|
UFGS 23 58 00.00 10 Central Steam Heating and Utilities Systems |
May-2020 |
D
|
|
Archived with no replacement.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
| Aug-2025 |
A
|
UFGS 25 10 10 Utility Monitoring and Control System (UMCS) Front End and Integration |
Feb-2019 |
C
|
2 |
Incorporated various CCRs. |
| Aug-2025 |
A
|
UFGS 26 05 13 Medium-Voltage Cables |
Aug-2025 |
N
|
|
New Section superseding UFGS 26 05 13.00 10 MEDIUM-VOLTAGE CABLES. |
| Aug-2025 |
A
|
UFGS 26 05 13.00 10 Medium-Voltage Cables |
Nov-2023 |
D
|
|
Superseded by UFGS 26 05 13 MEDIUM-VOLTAGE CABLES.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
| Aug-2025 |
N
|
UFGS 26 20 00 Interior Distribution System |
May-2025 |
C
|
1 |
Telecommunications systems information removed and relocated to UFGS-27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM. |
| Aug-2025 |
A
|
UFGS 26 33 53 Static Uninterruptible Power Supply (UPS) |
Aug-2025 |
R
|
|
Complete review and update. |
| Aug-2025 |
A
|
UFGS 33 46 13 Foundation Drainage |
May-2020 |
D
|
|
Archived with no replacement.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
| Aug-2025 |
A
|
UFGS 33 56 53 Compressed Gases Storage Tanks |
May-2020 |
D
|
|
Archived with no replacement.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
| Aug-2025 |
N
|
UFGS 33 57 55 Fuel Systems Components (Non-Hydrant) |
Aug-2025 |
R
|
|
Complete review and update. |
| Aug-2025 |
A
|
UFGS 43 11 00.10 Off-Gas Fans, Blowers and Pumps |
May-2020 |
D
|
|
Archived with no replacement.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
| Aug-2025 |
A
|
UFGS 44 13 10.13 Vapor Phase Activated Carbon Adsorption Units |
May-2020 |
D
|
|
Archived with no replacement.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
| Aug-2025 |
A
|
UFGS 44 13 51 Thermal Oxidation Equipment |
May-2020 |
D
|
|
Archived with no replacement.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
| Aug-2025 |
A
|
UFGS 46 30 13 Advanced Oxidation Processes (AOP) |
Aug-2025 |
R
|
|
Complete review and update. |
| Aug-2025 |
A
|
UFGS 46 71 16 Gravity Belt Thickeners |
Aug-2025 |
R
|
|
Complete review and update. |
| Aug-2025 |
N
|
UFGS 48 14 13.00 20 Solar Liquid Flat Plate and Evacuated Tube Collectors |
May-2015 |
D
|
|
Section archived; Superseded by unified section UFGS 22 33 30 SOLAR WATER HEATING EQUIPMENT.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
| May-2025 |
N
|
UFGS 01 11 00 Summary of Work |
Feb-2024 |
C
|
1 |
In response to the following: CCR 14812, added "dual frequency" to GPR in paragraph LOCATION OF UNDERGROUND UTILITIES (1.5); CCR 15262, changed to initial capital "Contract" in four locations; and CCR 16075, added new bracketed paragraph Utility Locations (1.5.2) to address requirements for locating underground utilities. |
| May-2025 |
N
|
UFGS 01 14 00 Work Restrictions |
Nov-2022 |
C
|
5 |
In response to the following: CCR 15090, updated paragraph Extraordinary Security Requirements (1.14.1.1) and CCR 16084, removed duplicate paragraph Personnel List under Employment Restrictions For NAVFAC SW (1.6.18). |
| May-2025 |
N
|
UFGS 01 32 17.00 20 Cost-Loaded Network Analysis Schedules (NAS) |
May-2025 |
R
|
|
Complete review and update. |
| May-2025 |
A
|
UFGS 01 32 33.00 10 Photographic Documentation |
May-2025 |
N
|
|
New UFGS Section to address requirements for Photographic Documentation on all contract delivery types. |
| May-2025 |
A
|
UFGS 01 35 13.43 10 Special Project Procedures for Contaminated Sites |
Aug-2015 |
D
|
|
Section is archived with no replacement.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
| May-2025 |
N
|
UFGS 01 35 26 Governmental Safety Requirements |
May-2024 |
C
|
1 |
In response to the following: CCR 15361, promoted 'USE OF EXPLOSIVES' from a subparagraph to a main paragraph/article (3.7); CCR 15362, updated Monthly Exposure Report paragraph (1.5); CCR 15523, added Accident Prevention Plan (APP) Design and Accident Prevention Plan (APP) Construction to Submittals and text; CCR 15536, added Critical Lift Plan to Submittals and text; and CCR 16414, updated paragraph Unforeseen Hazardous Material (3.1.4) |
| May-2025 |
N
|
UFGS 01 45 00 Quality Control |
Aug-2023 |
C
|
2 |
In response to the following: CCR 15269 added "FC 1-300-09N" to the References Article; CCR 15448, updated Construction Quality Management Training paragraph (1.6.2.3); CCR 15700 updated bracketed option in paragraph Coordination and Mutual Understanding Meeting (1.5.1.2) and updated paragraph Acceptance of the Quality Control (QC) and Design Quality Control (DQC) Plan (1.5.3). Non-Technical CCRs 15466, 15469, 16004, 16145,, and 16432 also addressed. |
| May-2025 |
N
|
UFGS 01 57 19 Temporary Environmental Controls |
Aug-2022 |
C
|
1 |
In response to the following: CCR 14366, replaced "Safety Plan" with "Accident Prevention Plan (APP)" in HAZARDOUS MATERIAL MANAGEMENT paragraph (1.3.8); CCR 14378, updated Protection of the Environment from Waste Derived from Contractor Operations paragraph (1.7.6); CCR 14380, added additional environmental requirements for NW region to align with new environmental regulations; CCRs 14410, 14411, and 14412, updated Cuba's requirement in Parts 2 and 3; CCR 14528, added new WASHINGTON tailoring for Location Specific Universal Waste paragraph (1.2.26); CCR 14539, added 40 CFR 372 to REFERENCES; CCR 14658 updated Submittal Article; CCR 15470, added brackets and Note to Documentation paragraph (1.7.2.3); and CCRs 15851 & 16065, added 'Critical Root Zone' definition. |
| May-2025 |
N
|
UFGS 01 78 23 Operation and Maintenance Data |
May-2023 |
C
|
1 |
In response to the following: CCRs 12782 and 14164, added new list item "Risk Category V" under paragraph O&M MANUAL CONTENT (1.6); CCR 15035, updated language in paragraph Operation and Maintenance Manual, Prefinal Submittal (3.2.2) |
| May-2025 |
A
|
UFGS 04 01 20.73 Masonry Strengthening Using FRP Bars |
May-2025 |
R
|
|
Complete review and update. |
| May-2025 |
A
|
UFGS 04 01 20.75 Masonry Strengthening Using Surface Applied FRP Composites |
May-2025 |
R
|
|
Complete review and update. |
| May-2025 |
A
|
UFGS 04 20 00 Unit Masonry |
May-2025 |
R
|
|
Complete review and update. |
| May-2025 |
N
|
UFGS 06 10 00 Rough Carpentry |
Aug-2016 |
C
|
3 |
In response to CCR 13960, updated Submittals Article (1.2) removing/relocating non-submittal items. |
| May-2025 |
N
|
UFGS 07 60 00 Flashing and Sheet Metal |
Aug-2023 |
C
|
1 |
In response to CCR 14505, corrected metric measurement in Table I. |
| May-2025 |
N
|
UFGS 09 29 00 Gypsum Board |
Aug-2024 |
C
|
1 |
In response to the following: CCR 10091, added bracketed text to Finishing of Gypsum Board (3.4); CCR 10609, updated 'Abuse Resistant Gypsum Board' and 'Hard Body Impact Test' paragraphs to Level 1 performance; and CCR 14909, deleted "tapered edge" from Joint Tape paragraph (2.1.9.5) |
| May-2025 |
A
|
UFGS 13 48 73 Seismic Control For Nonstructural Components |
May-2025 |
R
|
|
Complete review and update including section title change from SEISMIC CONTROL FOR MISCELLANEOUS EQUIPMENT to SEISMIC CONTROL FOR NONSTRUCTURAL COMPONENTS. |
| May-2025 |
N
|
UFGS 21 12 00 Standpipe Systems |
May-2011 |
N
|
|
Reinstated May 2011 version of Section without any revisions; Section was previously archived February 2024 due to limited use. |
| May-2025 |
A
|
UFGS 22 31 00 Water Softeners, Cation-Exchange (Sodium Cycle) |
Feb-2009 |
D
|
|
Superseded by UFGS 22 31 03 DOMESTIC WATER SOFTENERS AND WATER CONDITIONERSNote: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
| May-2025 |
A
|
UFGS 22 31 03 Domestic Water Softeners and Water Conditioners |
May-2025 |
N
|
|
New Section superseding UFGS 22 31 00 WATER SOFTENERS, CATION EXCHANGE (SODIUM CYCLCE). |
| May-2025 |
N
|
UFGS 23 05 93 Testing, Adjusting, and Balancing for HVAC |
May-2025 |
R
|
|
Complete review and update. |
| May-2025 |
A
|
UFGS 23 21 23 Hydronic Pumps |
May-2025 |
R
|
|
Complete review and update. |
| May-2025 |
N
|
UFGS 23 64 10 Water Chillers, Vapor Compression Type |
May-2025 |
R
|
|
Complete review and update. |
| May-2025 |
N
|
UFGS 23 65 00 Cooling Towers and Remote Evaporatively-Cooled Condensers |
May-2025 |
R
|
|
Complete review and update. |
| May-2025 |
N
|
UFGS 26 20 00 Interior Distribution System |
May-2025 |
R
|
|
Complete review and update. |
| May-2025 |
N
|
UFGS 27 10 00 Building Telecommunications Cabling System |
May-2025 |
R
|
|
Complete review and update. |
| May-2025 |
A
|
UFGS 31 33 10 Foundation Drilling and Grouting in Rock |
May-2025 |
N
|
|
New UFGS Section to address rock grouting scenarios where grouting occurs directly on the bedrock surface, through soil, or through limited concrete. |
| May-2025 |
A
|
UFGS 31 73 19 Tunnel and Shaft Grouting |
May-2025 |
R
|
|
Complete review and update. |
| May-2025 |
A
|
UFGS 32 01 29.62 Concrete Pavement Raising |
May-2025 |
R
|
|
Complete review and update. |
| May-2025 |
A
|
UFGS 32 12 19.16 Resin-Modified Asphalt Paving Wearing Courses |
May-2025 |
R
|
|
Complete review and update. |
| May-2025 |
N
|
UFGS 33 01 50.75 Repair of Field Fabricated Fuel Storage Tanks |
May-2025 |
N
|
|
New Section to address the repair of a field fabricated fuel storage tank. |
| May-2025 |
N
|
UFGS 33 08 55 Fuel Distribution System Start-Up (Non-Hydrant) |
May-2025 |
R
|
|
Complete review and update. |
| May-2025 |
N
|
UFGS 33 52 23.15 POL Service Piping Welding |
May-2025 |
R
|
|
Complete review and update. |
| May-2025 |
N
|
UFGS 33 52 40 Fuel Systems Piping (Non-Hydrant) |
May-2025 |
R
|
|
Complete review and update. |
| May-2025 |
A
|
UFGS 33 56 10 Factory-Fabricated Fuel Storage Tanks |
May-2025 |
R
|
|
Complete review and update. |
| May-2025 |
N
|
UFGS 33 56 21.17 Single Wall Aboveground Fixed Roof Steel POL Storage Tank |
May-2025 |
R
|
|
Complete review and update. |
| May-2025 |
N
|
UFGS 33 56 21.18 Single Wall POL Tank Undertank Interstitial Space |
May-2025 |
R
|
|
Complete review and update. |
| May-2025 |
N
|
UFGS 41 22 13.19 Jib Cranes |
May-2025 |
N
|
|
New UFGS Section to address jib cranes. |
| May-2025 |
N
|
UFGS 41 22 23.19 Monorail Hoists |
May-2025 |
R
|
|
Complete review and update. |
| Feb-2025 |
N
|
UFGS 01 14 00 Work Restrictions |
Nov-2022 |
C
|
4 |
In response to multiple CCRs updates made throughout including removal of NCACS ID badges paragraph, removal/replacement of "shall" and "must", update to Guantanamo Bay requirements, and addition of the reference "EM 385-1-1". |
| Feb-2025 |
N
|
UFGS 01 20 00 Price and Payment Procedures |
Nov-2020 |
C
|
5 |
In response to CCR 15538, update made to paragraph Obligation of Government Payments (1.7.1). |
| Feb-2025 |
N
|
UFGS 01 30 00 Administrative Requirements |
Feb-2025 |
C
|
5 |
In response to multiple CCRs, updates have been made to paragraphs Progress and Completion Pictures (1.5), Non-Compliance Actions (1.7.4), Facility Turnover Planning Meetings (1.11), Partnering (1.14), and Performance Assessment Plan (PAP (1.15). A PAP document has also been added to the Related Materials. |
| Feb-2025 |
A
|
UFGS 02 51 19 Solidification and Stabilization Decontamination |
Feb-2025 |
R
|
|
Complete review and update. |
| Feb-2025 |
A
|
UFGS 02 53 16.13 Remediation of Contaminated Soils by Thermal Desorption |
Feb-2025 |
R
|
|
Complete review and update. |
| Feb-2025 |
A
|
UFGS 02 53 16.16 In-Situ Thermal Remediation |
Feb-2025 |
N
|
|
New UFGS Section to address in-situ thermal remediation of materials contaminated by hazardous or toxic organic wastes and/or by petroleum, oil, or lubricants. |
| Feb-2025 |
A
|
UFGS 02 54 19.13 Bioremediation Using Landfarming |
Feb-2025 |
R
|
|
Complete review and update. |
| Feb-2025 |
A
|
UFGS 02 54 19.16 Bioremediation of Soils Using Windrow Composting |
Feb-2025 |
R
|
|
Complete review and update. |
| Feb-2025 |
A
|
UFGS 02 54 23 Soil Washing Through Separation/Solubilization |
Feb-2025 |
R
|
|
Complete review and update. |
| Feb-2025 |
A
|
UFGS 02 56 13.13 Geomembrane Waste Containment |
Feb-2025 |
R
|
|
Complete review and update. |
| Feb-2025 |
A
|
UFGS 02 56 13.16 Clay Waste Containment |
Feb-2025 |
R
|
|
Complete review and update. |
| Feb-2025 |
A
|
UFGS 02 56 13.19 Geosynthetic Clay Liner Waste Containment |
Feb-2025 |
R
|
|
Complete review and update. |
| Feb-2025 |
A
|
UFGS 02 61 13 Excavation and Handling of Contaminated Material |
Feb-2025 |
R
|
|
Complete review and update. |
| Feb-2025 |
N
|
UFGS 02 61 23 Removal and Disposal of PCB Contaminated Soils |
Feb-2025 |
R
|
|
Complete review and update. |
| Feb-2025 |
A
|
UFGS 02 66 13 Select Fill and Topsoil for Landfill Cover |
Feb-2025 |
R
|
|
Complete review and update. |
| Feb-2025 |
A
|
UFGS 02 72 13.13 Point of Entry Treatment for Drinking Water |
Feb-2025 |
N
|
|
New UFGS Section to address requirements for drinking water treatment via a point of entry treatment (POET) system. |
| Feb-2025 |
N
|
UFGS 22 05 48.00 20 Mechanical Sound, Vibration, and Seismic Control |
Apr-2006 |
D
|
|
Archived with no replacement.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
| Feb-2025 |
A
|
UFGS 23 05 48.19 Seismic Bracing Mechanical Systems |
Feb-2025 |
R
|
|
Complete review and update, including title change; brackets removed [SEISMIC] BRACING FOR MECHANICAL SYSTEMS. |
| Feb-2025 |
A
|
UFGS 23 30 00 HVAC Air Distribution |
Feb-2025 |
R
|
|
Complete review and update. |
| Feb-2025 |
A
|
UFGS 23 35 16 Mechanical Engine[ and Welding Fume] Exhaust Systems |
Feb-2025 |
N
|
|
Superseded UFGS-23 35 16.17 10 MECHANICAL ENGINE[ AND WELDING FUME] EXHAUST SYSTEMS. |
| Feb-2025 |
A
|
UFGS 23 35 16.17 10 Mechanical Engine [and Welding Fume] Exhaust Systems |
May-2020 |
D
|
|
Superseded by UFGS-23 35 16 MECHANICAL ENGINE[ AND WELDING FUME] EXHAUST SYSTEMS.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
| Feb-2025 |
N
|
UFGS 23 81 47 Water-Loop and Ground-Loop Heat Pump Systems |
Feb-2025 |
R
|
|
Complete review and update. |
| Feb-2025 |
F
|
UFGS 33 51 13.00 30 Natural-Gas Metering |
May-2010 |
D
|
|
Archived with no replacement.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
| Feb-2025 |
N
|
UFGS 33 63 13 Exterior Underground Steam Distribution System |
Feb-2025 |
R
|
|
Complete review and update. |
| Nov-2024 |
N
|
UFGS 08 39 55.00 20 Navy Standard Earth-Covered Magazine Doors |
Nov-2024 |
N
|
|
New Navy-only section to cover the requirements for doors for earth covered Navy magazine definitive drawings, including security, operations, and controls. |
| Nov-2024 |
A
|
UFGS 09 65 00 Resilient Flooring |
Nov-2024 |
R
|
|
Complete review and update. |
| Nov-2024 |
A
|
UFGS 09 68 00 Carpeting |
Nov-2024 |
R
|
|
Complete review and update. |
| Nov-2024 |
A
|
UFGS 09 69 13 Rigid Grid Access Flooring |
Nov-2024 |
R
|
|
Complete review and update. |
| Nov-2024 |
A
|
UFGS 09 69 19 Stringerless Access Flooring |
Nov-2024 |
R
|
|
Complete review and update. |
| Nov-2024 |
A
|
UFGS 10 22 43 Sliding Partitions |
Nov-2024 |
R
|
|
Complete review and update. |
| Nov-2024 |
N
|
UFGS 11 31 13 Electric Kitchen Equipment |
Aug-2017 |
C
|
2 |
In response to CCR 11242, Related Requirements (1.2) has been tailored for Navy. |
| Nov-2024 |
N
|
UFGS 22 00 00 Plumbing, General Purpose |
May-2024 |
C
|
1 |
In response to CCR #15264, MSS SP-91 has been added to the Reference Article and the paragraph VALVES (2.3) |
| Nov-2024 |
N
|
UFGS 23 35 19.00 20 Industrial Ventilation and Exhaust |
Feb-2010 |
C
|
3 |
In response to CCR 10381, replaced "Division 16" with "Division 26" in Electrical Ground Continuity paragraph (3.1.2) |
| Nov-2024 |
N
|
UFGS 23 51 43.02 20 Electrostatic Dust Collector of Flue Gas Particulates |
Apr-2006 |
C
|
1 |
In response to CCR 10402, replaced "Division 16" with "Division 26" in paragraphs Material and Workmanship (2.3.1.1) and Equipment Enclosure Grounding (2.3.2.2) |
| Nov-2024 |
N
|
UFGS 23 51 43.03 20 Fabric Filter Dust Collector of Fly Ash Particles in Flue Gas |
Feb-2010 |
C
|
1 |
In response to CCR 10403, replaced "Division 16" with "Division 26" in Specifier Notes. |
| Nov-2024 |
N
|
UFGS 26 13 02 Pad-Mounted Solid Dielectric Switchgear |
Nov-2024 |
N
|
|
New UFGS section to address solid dielectric, dead-front, enclosed and non-enclosed, pad-mounted switchgear with load and fault interrupting ways, with maximum ratings of 600 amperes and 38 kV (35kV Class), 60 Hz. |
| Nov-2024 |
A
|
UFGS 26 42 19.00 10 Cathodic Protection Systems (Impressed Current) for Civil Works Structures |
Nov-2024 |
N
|
|
New Section superseding UFGS 26 42 19.10 CATHODIC PROTECTION SYSTEMS (IMPRESSED CURRENT) FOR LOCK MITER GATES. |
| Nov-2024 |
A
|
UFGS 26 42 19.10 Cathodic Protection Systems (Impressed Current) For Lock Miter Gates |
Nov-2008 |
D
|
|
Superseded by UFGS 26 42 19.00 10 CATHODIC PROTECTION SYSTEMS (IMPRESSED CURRENT) FOR CIVIL WORKS STRUCTURES.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |