Below is a listing of the Revisions and Changes made to UFGS Sections for each release. You can narrow the list by selecting a UFGS Release date from the drop-down and clicking 'Apply'.

KEYPREPARING ACTIVITY (PA)A ArmyN NavyF Air ForceS NASA [ARCHIVED]
ACTIONN NewR RevisionC ChangeD Deletion
Release PA UFGS Section Action Change # Nature of Change or Revision
Feb-2024 F UFGS 46 07 53.19 Composting Toilet D Archived with no replacement.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2023 N UFGS 01 32 17.00 20 Cost-Loaded Network Analysis Schedules (NAS) R Complete review and update. Added new Related Materials: "Contractor Baseline Schedule General Commissioning/HVAC Review Checklist"
Nov-2023 N UFGS 01 32 17.00 20 Cost-Loaded Network Analysis Schedules (NAS) R Complete review and update. Added new Related Materials: "Contractor Baseline Schedule General Commissioning/HVAC Review Checklist"
Nov-2023 A UFGS 01 45 00.15 10 Resident Management System Contractor Mode (RMS CM) R Complete review and update.
Nov-2023 N UFGS 01 78 24.00 20 Facility Data Workbook (FDW) C 1 In response to CCR 13686, added "eOMSI" to the Definitions paragraph (1.1)
Nov-2023 N UFGS 01 91 00.15 Building Commissioning C 2 In response to CCR 13595, moved language related to warranty period requirements from PROJECT SCHEDULE paragraph (1.8) to CONSTRUCTION PHASE COMMISSIONING PLANS paragraph (3.7); added language for Air Force usage.
Nov-2023 N UFGS 03 30 00 Cast-In-Place Concrete C 6 In response to the following CCRs: 14190, "LEED NC" removed from the References and submittal items with "LEED NC" reference replaced with an "S" submittal tag; 14340 and 14341, updated list items under Blended Cements paragraph (2.3.1.2)
Nov-2023 N UFGS 03 30 00 Cast-In-Place Concrete C 6 In response to the following CCRs: 13850, edited Specifier Notes in Silica Fume paragraph (2.3.1.5) to clarify the use of silica fume; 13683, added requirement for ACI 301 in Concrete Mix Design paragraph (1.6.1.2)
Nov-2023 N UFGS 03 30 00 Cast-In-Place Concrete C 6 In response to the following CCRs: 12710 - updated requirements in Testing Concrete Structure for Strength (1.14.3.9 - item d.); 12783 - updated Mixing (3.6.2) to align with current ASTM C94 and ACI 301; 12993 - updated table in Properties and Requirements (2.5.1, item i.) under column 'Miscellaneous Requirements,' row 'Lightweight concrete suspended slab' changed units to pounds per cubic foot; 13132 - updated submittal item to "Quality Control Program"; and 13205 - updated test intervals/requirements in paragraphs Slump Tests (3.14.3.1) and Compressive Strength Tests (3.14.3.3).
Nov-2023 N UFGS 03 30 00 Cast-In-Place Concrete C 6 In response to the following CCRs: 10852, deleted paragraph Maximum Allowable Construction Joint Spacing (3.11.1) and list items a. and b.; 11572, updated Concrete Mix Design paragraph (1.6.1.2); 11445, updated Table under Sulfate Resistance paragraph (2.5.2.4 list item a.); 11120, removed list item b. under Reinforcement paragraph (6.2) and added list item e. under Epoxy-Coated Reinforcing Bars paragraph (2.6.1.2); and 11115, added ASTM A1094/A1094M to the Reference Article and as an option in paragraph Galvanized Reinforcing Bars (2.6.1.1) list item a.
Nov-2023 A UFGS 03 37 29 Concrete for Concrete Cutoff Walls C 1 Incorporated CCR #12904.
Nov-2023 N UFGS 03 62 16 Metallic Non-Shrink Grouting C 1 Administrative Change: Preparing Activity changed from NASA to NAVFAC.
Nov-2023 N UFGS 05 51 00 Metal Stairs C 1 Administrative Change: Preparing Activity changed from NASA to NAVFAC.
Nov-2023 N UFGS 05 52 00 Metal Railings C 1 Administrative Change: Preparing Activity changed from NASA to NAVFAC.
Nov-2023 N UFGS 05 72 00 Decorative Metal Specialties C 1 Administrative Change: Preparing Activity changed from NASA to NAVFAC.
Nov-2023 A UFGS 06 18 00 Glued-Laminated Construction C 1 Administrative Change: Preparing Activity changed from NASA to USACE.
Nov-2023 N UFGS 06 71 33 Fiberglass Reinforced Plastic (FRP) Ladders C 1 Administrative Change: Preparing Activity changed from NASA to NAVFAC.
Nov-2023 N UFGS 06 73 01 Fiberglass Reinforced Plastic (FRP) Grating C 1 Administrative Change: Preparing Activity changed from NASA to NAVFAC.
Nov-2023 N UFGS 06 82 14 Fiberglass Reinforced Plastic (FRP) Pipe and Tube Railings C 1 Administrative Change: Preparing Activity changed from NASA to NAVFAC.
Nov-2023 A UFGS 12 48 13 Entrance Floor Mats and Frames C 1 Administrative Change: Preparing Activity changed from NASA to USACE.
Nov-2023 N UFGS 22 05 83.63 Cured-In-Place Pipe (CIPP) Lining for Plumbing Applications D Archived with no replacement.
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2023 N UFGS 23 64 00 Packaged Water Chillers, Absorption Type D Archived with no replacement.
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2023 A UFGS 26 05 13.00 10 Medium-Voltage Cables N Renumbered/Superseded NASA UFGS-26 05 13.00 40 without revision
Nov-2023 A UFGS 26 05 48 Seismic Protection for Electrical Equipment N New Unified Section; Superseding UFGS-26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT.
Nov-2023 A UFGS 26 05 48.00 10 Seismic Protection for Electrical Equipment D Superseded by UFGS-26 05 48 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT
Nov-2023 N UFGS 26 12 19 Pad-Mounted, Liquid-Filled, Medium Voltage Transformers C 2 Updated information in Related Materials: Three-Phase Pad-Mounted Transformer Details
Nov-2023 N UFGS 26 12 21 Single-Phase Pad-Mounted Transformers C 1 Updated information in Related Materials: Single-Phase Pad-Mounted Transformer Details; in response to CCRs 11442 and 14105, "ABB" has been updated to "ABB/Hitachi Energy in Reduced Submittal Requirements paragraph (1.4.2)
Nov-2023 A UFGS 26 13 32 Medium-Voltage Switchgear, Gas-Insulated N New UFGS Section
Nov-2023 A UFGS 26 22 00.00 10 480-Volt Station Service Switchgear and Transformers R Complete review and update.
Nov-2023 A UFGS 26 55 53 Security Lighting N Renumbered/Superseded NASA UFGS-26 55 53.00 40 without revision
Nov-2023 N UFGS 31 31 16.13 Chemical Termite Control C 1 In response to CCR 13819, revised the Termiticides paragraph (2.2.1), as well as several minor edits
Nov-2023 A UFGS 32 01 11.51 Rubber and Paint Removal From Airfield Pavements R Complete review and update. Preparing Activity changed from NAVFAC to USACE.
Nov-2023 A UFGS 32 01 11.51 Rubber and Paint Removal From Airfield Pavements R Complete review and update.
Nov-2023 A UFGS 32 01 13.62 Bituminous Surface Treatment [and] [Sand Seal] R Complete review and update, including section title change from ASPHALT SURFACE TREATMENT to BITUMINOUS SURFACE TREATMENT [AND] [SAND SEAL].
Nov-2023 A UFGS 32 01 13.64 Rejuvenation of Asphalt Pavement Surfaces R Complete review and update, including section title change from BITUMINOUS PAVEMENT LIQUID REJUVENATING to REJUVENATION OF ASPHALT PAVEMENT SURFACES.
Nov-2023 A UFGS 32 01 17.61 Sealing Cracks in Asphalt Paving C 1 Incorporated CCR #13888.
Nov-2023 A UFGS 32 01 18.71 Grooving of Airfield Paving R Complete review and update. Added new Related Materials.
Nov-2023 A UFGS 32 12 36.13 Bituminous Fog Seal R Complete review and update, including section title change from ASPHALTIC SEAL AND FOG COATS to BITUMINOUS FOG SEAL.
Nov-2023 N UFGS 33 11 00 Water Utility Distribution Piping C 2 In response to the following CCRs: 13045, updated paragraph reference in first Specifier Note of MATERIALS paragraph (2.1); and 13586, added paragraph Knife Gate Valves (2.1.2.3) and reference AWWA C520
Nov-2023 F UFGS 33 32 16 Packaged Utility Wastewater Pumping Stations C 1 Incorporated various CCRs.
Nov-2023 A UFGS 35 05 40.14 10 Hydraulic Power Systems for Civil Works Structures R Superseding UFGS-41 24 26 HYDRAULIC POWER SYSTEMS. Complete review and update.
Nov-2023 A UFGS 35 31 19 Stone, Channel, Shoreline/Coastal Protection for Structures R Complete review and update.
Nov-2023 A UFGS 35 31 19.20 Articulating Concrete Block Revetments R Complete review and update.
Nov-2023 A UFGS 41 24 26 Hydraulic Power Systems D Superseded by UFGS-35 05 40.14 10 HYDRAULIC POWER SYSTEMS FOR CIVIL WORKS STRUCTURES.
Nov-2023 N UFGS 46 07 53 Packaged Wastewater Treatment Equipment C 2 In response to CCR 13074, updated to imperative mood; removed "shall" from the Section text.
Nov-2023 A UFGS 48 06 15 Turbine Oil R Complete review and update.
Nov-2023 A UFGS 48 06 15 Turbine Oil R Complete review and update.
Aug-2023 N UFGS 01 30 00 Administrative Requirements C 3 Revised benchmarks for NAVFAC partnering based on 11013.40B
Aug-2023 N UFGS 01 31 23.13 20 Electronic Construction and Facility Support Contract Management System (eCMS) R Complete refresh of the Section to coincide with the 15.2 update of the system; added "(eCMS)" to Section title
Aug-2023 A UFGS 01 32 01.00 10 Project Schedule R Complete review and update.
Aug-2023 N UFGS 01 35 26 Governmental Safety Requirements C 4 In response to CCR 11849, "CONSTRUCTION INDOOR AIR QUALITY (IAQ) MANAGEMENT PLAN" (1.17) has been relocated to this section from UFGS-01 45 00 QUALITY CONTROL. The references and submittals have also been updated to correspond with this new Article.
Aug-2023 A UFGS 01 42 00 Sources for Reference Publications C 1 Incorporated new organization Cool Roof Rating Council (CRRC)
Aug-2023 N UFGS 01 45 00 Quality Control N Unified Section superseding UFGS-01 45 00.00 10 QUALITY CONTROL (Army), UFGS-01 45 00.00 20 QUALITY CONTROL (Navy), and UFGS-01 45 00.10 20 QUALITY CONTROL FOR MINOR CONSTRUCTION
Aug-2023 A UFGS 01 45 00.00 10 Quality Control D Superseded by UFGS 01 45 00 QUALITY CONTROL.
"Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives."
Aug-2023 N UFGS 01 45 00.00 20 Quality Control D Superseded by Unified UFGS-01 45 00 QUALITY CONTROL
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2023 S UFGS 01 45 00.00 40 Quality Control R Complete life cycle review. Update technical requirements, references, formatting.
Aug-2023 N UFGS 01 45 00.10 20 Quality Control for Minor Construction D Superseded by Unified UFGS-01 45 00 QUALITY CONTROL
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2023 N UFGS 01 91 00.15 Building Commissioning C 1 Clarified the language in COMMISSIONING FIRM paragraph (1.11)
Aug-2023 A UFGS 03 41 16.08 Precast Concrete Slabs (MAX. SPAN 8 FEET O.C.) C 1 Administrative Change: Preparing Activity changed from NASA to USACE.
Aug-2023 A UFGS 03 41 33 Precast Structural Pretensioned Concrete C 1 Administrative Change: Preparing Activity changed from NASA to USACE.
Aug-2023 A UFGS 03 47 13 Tilt-Up Concrete C 1 Administrative Change: Preparing Activity changed from NASA to USACE.
Aug-2023 S UFGS 03 62 16 Metallic Non-Shrink Grouting R Complete life cycle review. Update technical requirements, references, formatting.
Aug-2023 A UFGS 05 14 00.13 Welding Structural Aluminum Framing C 1 Administrative Change: Preparing Activity changed from NASA to USACE.
Aug-2023 S UFGS 05 51 00 Metal Stairs R Complete life cycle review. Update technical requirements, references, formatting. Incorporated CCR# 5458, 7328, 11237
Aug-2023 S UFGS 05 52 00 Metal Railings R Complete life cycle review. Update technical requirements, references, formatting. Incorporated CCR# 11143
Aug-2023 S UFGS 05 72 00 Decorative Metal Specialties R Complete life cycle review. Update technical requirements, references, formatting.
Aug-2023 S UFGS 06 18 00 Glued-Laminated Construction R Complete life cycle review. Update technical requirements, references, formatting.
Aug-2023 S UFGS 06 71 33 Fiberglass Reinforced Plastic (FRP) Ladders R Complete life cycle review. Update technical requirements, references, formatting.
Aug-2023 S UFGS 06 73 01 Fiberglass Reinforced Plastic (FRP) Grating R Complete life cycle review. Update technical requirements, references, formatting. Incorporated CCR# 10243
Aug-2023 S UFGS 06 82 14 Fiberglass Reinforced Plastic (FRP) Pipe and Tube Railings R Complete life cycle review. Update technical requirements, references, formatting.
Aug-2023 N UFGS 07 11 13 Bituminous Dampproofing R Complete review and update including the incorporation of CCRs.
Aug-2023 N UFGS 07 14 00 Fluid-Applied Waterproofing R Complete review and update including the incorporation of CCRs.
Aug-2023 N UFGS 07 16 19 Metallic Oxide Waterproofing R Complete review and update including the incorporation of CCRs.
Aug-2023 N UFGS 07 19 00 Water Repellents R Complete review and update including the incorporation of CCRs.
Aug-2023 N UFGS 07 21 13 Board and Block Insulation R Complete review and update
Aug-2023 N UFGS 07 21 16 Mineral Fiber Blanket Insulation R Complete review and update including the incorporation of CCRs.
Aug-2023 N UFGS 07 21 23 Loose Fill Thermal Insulation R Complete review and update
Aug-2023 N UFGS 07 22 00 Roof and Deck Insulation R Complete review and update including the incorporation of CCRs.
Aug-2023 N UFGS 07 24 00 Exterior Insulation and Finish Systems R Complete review and update including the incorporation of CCRs.
Aug-2023 A UFGS 07 27 10 Building Air Barrier System N Superseding UFGS 07 27 10.00 10 BUILDING AIR BARRIER SYSTEM. Complete review and update, to include section number chage (unification). Incorporated CCRs #5650, 9348, 12613
Aug-2023 A UFGS 07 27 10.00 10 Building Air Barrier System D Superseded by UFGS 07 27 10 BUILDING AIR BARRIER SYSTEM.
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2023 N UFGS 07 27 19.01 Self-Adhering Air Barriers R Complete review and update including the incorporation of CCRs.
Aug-2023 N UFGS 07 27 26 Fluid-Applied Membrane Barriers R Complete review and update including the incorporation of CCRs.
Aug-2023 N UFGS 07 27 36 Spray Foam Air Barriers R Complete review and update including the incorporation of CCRs.
Aug-2023 A UFGS 07 54 19 Polyvinyl Chloride Roofing R Complete review and update.
Aug-2023 N UFGS 07 60 00 Flashing and Sheet Metal R Complete review and update including the incorporation of CCRs.
Aug-2023 A UFGS 07 72 20 Gravity-Type Roof Ventilators R Complete review and update.
Aug-2023 N UFGS 07 92 00 Joint Sealants R Complete review and update including the incorporation of CCRs.
Aug-2023 S UFGS 12 48 13 Entrance Floor Mats and Frames R Complete life cycle review. Update technical requirements, references, formatting.
Aug-2023 N UFGS 22 05 83.63 Cured-In-Place Pipe (CIPP) Lining for Plumbing Applications C 1 Administrative Change: Preparing Activity changed from NASA to NAVFAC.
Aug-2023 N UFGS 23 01 30.41 HVAC System Cleaning C 1 Administrative Change: Preparing Activity changed from NASA to NAVFAC.
Aug-2023 N UFGS 23 05 15 Common Piping for HVAC C 1 Administrative Change: Preparing Activity changed from NASA to NAVFAC.
Aug-2023 A UFGS 25 05 11 Cybersecurity for Facility-Related Control Systems C 1 Incorporated various CCRs.
Aug-2023 S UFGS 26 05 71.00 40 Low-Voltage Overcurrent Protective Devices R Complete life cycle review. Update technical requirements, references, formatting.
Aug-2023 A UFGS 26 05 73 Power System Studies N Superseding UFGS 26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION. New UFGS section.
Aug-2023 N UFGS 26 20 00 Interior Distribution System R Complete review and update to incorporate CCRs
Aug-2023 A UFGS 26 28 01.00 10 Coordinated Power System Protection D Superseded by UFGS 26 05 73 POWER SYSTEM STUDIES.
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2023 S UFGS 26 28 21.00 40 Automatic Transfer Switches R Complete life cycle review. Update technical requirements, references, formatting. Incorporated CCR# 9563
Aug-2023 N UFGS 26 41 00 Lightning Protection System R Complete review and update based on CCRs and age of the document.
Aug-2023 S UFGS 26 52 00.00 40 Emergency Lighting R Complete life cycle review. Update technical requirements, references, formatting.