May-2025 |
N
|
UFGS 26 20 00 Interior Distribution System |
May-2025 |
R
|
|
Complete review and update. |
May-2025 |
N
|
UFGS 27 10 00 Building Telecommunications Cabling System |
May-2025 |
R
|
|
Complete review and update. |
May-2025 |
A
|
UFGS 31 33 10 Foundation Drilling and Grouting in Rock |
May-2025 |
N
|
|
New UFGS Section to address rock grouting scenarios where grouting occurs directly on the bedrock surface, through soil, or through limited concrete. |
May-2025 |
A
|
UFGS 31 73 19 Tunnel and Shaft Grouting |
May-2025 |
R
|
|
Complete review and update. |
May-2025 |
A
|
UFGS 32 01 29.62 Concrete Pavement Raising |
May-2025 |
R
|
|
Complete review and update. |
May-2025 |
A
|
UFGS 32 12 19.16 Resin-Modified Asphalt Paving Wearing Courses |
May-2025 |
R
|
|
Complete review and update. |
May-2025 |
N
|
UFGS 33 01 50.75 Repair of Field Fabricated Fuel Storage Tanks |
May-2025 |
N
|
|
New Section to address the repair of a field fabricated fuel storage tank. |
May-2025 |
N
|
UFGS 33 08 55 Fuel Distribution System Start-Up (Non-Hydrant) |
May-2025 |
R
|
|
Complete review and update. |
May-2025 |
N
|
UFGS 33 52 23.15 POL Service Piping Welding |
May-2025 |
R
|
|
Complete review and update. |
May-2025 |
N
|
UFGS 33 52 40 Fuel Systems Piping (Non-Hydrant) |
May-2025 |
R
|
|
Complete review and update. |
May-2025 |
A
|
UFGS 33 56 10 Factory-Fabricated Fuel Storage Tanks |
May-2025 |
R
|
|
Complete review and update. |
May-2025 |
N
|
UFGS 33 56 21.17 Single Wall Aboveground Fixed Roof Steel POL Storage Tank |
May-2025 |
R
|
|
Complete review and update. |
May-2025 |
N
|
UFGS 33 56 21.18 Single Wall POL Tank Undertank Interstitial Space |
May-2025 |
R
|
|
Complete review and update. |
May-2025 |
N
|
UFGS 41 22 13.19 Jib Cranes |
May-2025 |
N
|
|
New UFGS Section to address jib cranes. |
May-2025 |
N
|
UFGS 41 22 23.19 Monorail Hoists |
May-2025 |
R
|
|
Complete review and update. |
Feb-2025 |
N
|
UFGS 01 14 00 Work Restrictions |
Nov-2022 |
C
|
4 |
In response to multiple CCRs updates made throughout including removal of NCACS ID badges paragraph, removal/replacement of "shall" and "must", update to Guantanamo Bay requirements, and addition of the reference "EM 385-1-1". |
Feb-2025 |
N
|
UFGS 01 20 00 Price and Payment Procedures |
Nov-2020 |
C
|
5 |
In response to CCR 15538, update made to paragraph Obligation of Government Payments (1.7.1). |
Feb-2025 |
N
|
UFGS 01 30 00 Administrative Requirements |
Feb-2025 |
C
|
5 |
In response to multiple CCRs, updates have been made to paragraphs Progress and Completion Pictures (1.5), Non-Compliance Actions (1.7.4), Facility Turnover Planning Meetings (1.11), Partnering (1.14), and Performance Assessment Plan (PAP (1.15). A PAP document has also been added to the Related Materials. |
Feb-2025 |
A
|
UFGS 02 51 19 Solidification and Stabilization Decontamination |
Feb-2025 |
R
|
|
Complete review and update. |
Feb-2025 |
A
|
UFGS 02 53 16.13 Remediation of Contaminated Soils by Thermal Desorption |
Feb-2025 |
R
|
|
Complete review and update. |
Feb-2025 |
A
|
UFGS 02 53 16.16 In-Situ Thermal Remediation |
Feb-2025 |
N
|
|
New UFGS Section to address in-situ thermal remediation of materials contaminated by hazardous or toxic organic wastes and/or by petroleum, oil, or lubricants. |
Feb-2025 |
A
|
UFGS 02 54 19.13 Bioremediation Using Landfarming |
Feb-2025 |
R
|
|
Complete review and update. |
Feb-2025 |
A
|
UFGS 02 54 19.16 Bioremediation of Soils Using Windrow Composting |
Feb-2025 |
R
|
|
Complete review and update. |
Feb-2025 |
A
|
UFGS 02 54 23 Soil Washing Through Separation/Solubilization |
Feb-2025 |
R
|
|
Complete review and update. |
Feb-2025 |
A
|
UFGS 02 56 13.13 Geomembrane Waste Containment |
Feb-2025 |
R
|
|
Complete review and update. |
Feb-2025 |
A
|
UFGS 02 56 13.16 Clay Waste Containment |
Feb-2025 |
R
|
|
Complete review and update. |
Feb-2025 |
A
|
UFGS 02 56 13.19 Geosynthetic Clay Liner Waste Containment |
Feb-2025 |
R
|
|
Complete review and update. |
Feb-2025 |
A
|
UFGS 02 61 13 Excavation and Handling of Contaminated Material |
Feb-2025 |
R
|
|
Complete review and update. |
Feb-2025 |
N
|
UFGS 02 61 23 Removal and Disposal of PCB Contaminated Soils |
Feb-2025 |
R
|
|
Complete review and update. |
Feb-2025 |
A
|
UFGS 02 66 13 Select Fill and Topsoil for Landfill Cover |
Feb-2025 |
R
|
|
Complete review and update. |
Feb-2025 |
A
|
UFGS 02 72 13.13 Point of Entry Treatment for Drinking Water |
Feb-2025 |
N
|
|
New UFGS Section to address requirements for drinking water treatment via a point of entry treatment (POET) system. |
Feb-2025 |
N
|
UFGS 22 05 48.00 20 Mechanical Sound, Vibration, and Seismic Control |
Apr-2006 |
D
|
|
Archived with no replacement.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
Feb-2025 |
A
|
UFGS 23 05 48.19 Seismic Bracing Mechanical Systems |
Feb-2025 |
R
|
|
Complete review and update, including title change; brackets removed [SEISMIC] BRACING FOR MECHANICAL SYSTEMS. |
Feb-2025 |
A
|
UFGS 23 30 00 HVAC Air Distribution |
Feb-2025 |
R
|
|
Complete review and update. |
Feb-2025 |
A
|
UFGS 23 35 16 Mechanical Engine[ and Welding Fume] Exhaust Systems |
Feb-2025 |
N
|
|
Superseded UFGS-23 35 16.17 10 MECHANICAL ENGINE[ AND WELDING FUME] EXHAUST SYSTEMS. |
Feb-2025 |
A
|
UFGS 23 35 16.17 10 Mechanical Engine [and Welding Fume] Exhaust Systems |
May-2020 |
D
|
|
Superseded by UFGS-23 35 16 MECHANICAL ENGINE[ AND WELDING FUME] EXHAUST SYSTEMS.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
Feb-2025 |
N
|
UFGS 23 81 47 Water-Loop and Ground-Loop Heat Pump Systems |
Feb-2025 |
R
|
|
Complete review and update. |
Feb-2025 |
F
|
UFGS 33 51 13.00 30 Natural-Gas Metering |
May-2010 |
D
|
|
Archived with no replacement.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
Feb-2025 |
N
|
UFGS 33 63 13 Exterior Underground Steam Distribution System |
Feb-2025 |
R
|
|
Complete review and update. |
Nov-2024 |
N
|
UFGS 08 39 55.00 20 Navy Standard Earth-Covered Magazine Doors |
Nov-2024 |
N
|
|
New Navy-only section to cover the requirements for doors for earth covered Navy magazine definitive drawings, including security, operations, and controls. |
Nov-2024 |
A
|
UFGS 09 65 00 Resilient Flooring |
Nov-2024 |
R
|
|
Complete review and update. |
Nov-2024 |
A
|
UFGS 09 68 00 Carpeting |
Nov-2024 |
R
|
|
Complete review and update. |
Nov-2024 |
A
|
UFGS 09 69 13 Rigid Grid Access Flooring |
Nov-2024 |
R
|
|
Complete review and update. |
Nov-2024 |
A
|
UFGS 09 69 19 Stringerless Access Flooring |
Nov-2024 |
R
|
|
Complete review and update. |
Nov-2024 |
A
|
UFGS 10 22 43 Sliding Partitions |
Nov-2024 |
R
|
|
Complete review and update. |
Nov-2024 |
N
|
UFGS 11 31 13 Electric Kitchen Equipment |
Aug-2017 |
C
|
2 |
In response to CCR 11242, Related Requirements (1.2) has been tailored for Navy. |
Nov-2024 |
N
|
UFGS 22 00 00 Plumbing, General Purpose |
May-2024 |
C
|
1 |
In response to CCR #15264, MSS SP-91 has been added to the Reference Article and the paragraph VALVES (2.3) |
Nov-2024 |
N
|
UFGS 23 35 19.00 20 Industrial Ventilation and Exhaust |
Feb-2010 |
C
|
3 |
In response to CCR 10381, replaced "Division 16" with "Division 26" in Electrical Ground Continuity paragraph (3.1.2) |
Nov-2024 |
N
|
UFGS 23 51 43.02 20 Electrostatic Dust Collector of Flue Gas Particulates |
Apr-2006 |
C
|
1 |
In response to CCR 10402, replaced "Division 16" with "Division 26" in paragraphs Material and Workmanship (2.3.1.1) and Equipment Enclosure Grounding (2.3.2.2) |
Nov-2024 |
N
|
UFGS 23 51 43.03 20 Fabric Filter Dust Collector of Fly Ash Particles in Flue Gas |
Feb-2010 |
C
|
1 |
In response to CCR 10403, replaced "Division 16" with "Division 26" in Specifier Notes. |
Nov-2024 |
N
|
UFGS 26 13 02 Pad-Mounted Solid Dielectric Switchgear |
Nov-2024 |
N
|
|
New UFGS section to address solid dielectric, dead-front, enclosed and non-enclosed, pad-mounted switchgear with load and fault interrupting ways, with maximum ratings of 600 amperes and 38 kV (35kV Class), 60 Hz. |
Nov-2024 |
A
|
UFGS 26 42 19.00 10 Cathodic Protection Systems (Impressed Current) for Civil Works Structures |
Nov-2024 |
N
|
|
New Section superseding UFGS 26 42 19.10 CATHODIC PROTECTION SYSTEMS (IMPRESSED CURRENT) FOR LOCK MITER GATES. |
Nov-2024 |
A
|
UFGS 26 42 19.10 Cathodic Protection Systems (Impressed Current) For Lock Miter Gates |
Nov-2008 |
D
|
|
Superseded by UFGS 26 42 19.00 10 CATHODIC PROTECTION SYSTEMS (IMPRESSED CURRENT) FOR CIVIL WORKS STRUCTURES.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
Nov-2024 |
A
|
UFGS 31 33 20 Void and Permeation Grouting |
Nov-2024 |
N
|
|
New UFGS Section to address permeation grouting, void grouting, and grouting in unconsolidated deposits. |
Nov-2024 |
A
|
UFGS 31 33 30 Limited Mobility Grouting in Soil |
Nov-2024 |
N
|
|
New UFGS Section to address limited mobility grouting (LMG) with cementitious grout. |
Nov-2024 |
N
|
UFGS 32 01 19.61 Sealing of Joints in Rigid Pavement |
Nov-2019 |
C
|
1 |
In response to CCR 10403, replaced "Division 16" with "Division 26" in Specifier Notes |
Nov-2024 |
A
|
UFGS 32 17 23 Pavement Markings |
Aug-2016 |
D
|
|
Superseded by UFGS 32 17 23.16 ROAD AND PARKING LOT PAVEMENT MARKINGS and 32 17 23.19 AIRFIELD PAVEMENT MARKINGS.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
Nov-2024 |
A
|
UFGS 32 17 23.16 Road and Parking Lot Pavement Markings |
Nov-2024 |
N
|
|
New Section; superseding UFGS-32 17 23 PAVEMENT MARKINGS. |
Nov-2024 |
A
|
UFGS 32 17 23.19 Airfield Pavement Markings |
Nov-2024 |
N
|
|
New Section; superseding UFGS-32 17 23 PAVEMENT MARKINGS. |
Nov-2024 |
A
|
UFGS 35 31 19 Stone, Channel, Shoreline/Coastal Protection for Structures |
Nov-2023 |
D
|
|
Superseded by UFGS-35 31 19.40 STONE REVETMENTS.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
Nov-2024 |
A
|
UFGS 35 31 19.40 Stone Revetments |
Nov-2024 |
N
|
|
New Section superseding UFGS 35 31 19 STONE, CHANNEL, SHORLINE/COASTAL PROTECTION FOR STRUCTURES. Non-technical revision to update section title and number. |
Nov-2024 |
N
|
UFGS 43 21 29 Flow Measuring Equipment (Potable Water) (Sewage Treatment Plant) |
Apr-2006 |
C
|
1 |
In response to CCR 10405, replaced "Division 16" with "Division 26" in ELECTRICAL REQUIREMENTS paragraph (2.3) |
Aug-2024 |
N
|
UFGS Section Template (Template CCRs Only) |
Aug-2024 |
R
|
|
Within the Submittals Article, removed paragraph in the standard notes referencing the use of brackets in the standard paragraph; brackets replaced with “AIR FORCE, NAVY” and “ARMY” tailoring in the standard paragraph; outside brackets removed in the ARMY tailoring tag for the “G” submittals: |
Aug-2024 |
N
|
UFGS 01 14 00 Work Restrictions |
Nov-2022 |
C
|
3 |
In response to CCR 12882, updated SPECIAL SCHEDULING REQUIREMENTS paragraph (1.4) to include list item for restricted access areas. This information was removed from UFGS-01 50 00 and relocated here. |
Aug-2024 |
N
|
UFGS 01 20 00 Price and Payment Procedures |
Nov-2020 |
C
|
4 |
Updated to clarify cost loading and price and payment procedures. |
Aug-2024 |
N
|
UFGS 01 30 00 Administrative Requirements |
Nov-2020 |
C
|
4 |
In response to the following CCR 15440, updated for USACE adoption of Red Zone Process; CCR 11650, added optional ARMY tailoring for submittal Color Boards and Color Board paragraph (1.3) |
Aug-2024 |
A
|
UFGS 01 32 01.00 10 Project Schedule |
Aug-2023 |
C
|
1 |
Incorporated various CCRs. |
Aug-2024 |
N
|
UFGS 01 32 17.00 20 Cost-Loaded Network Analysis Schedules (NAS) |
Nov-2023 |
C
|
1 |
Updated to clarify cost loading and price and payment procedures. |
Aug-2024 |
A
|
UFGS 01 50 00 Temporary Construction Facilities and Controls |
Nov-2020 |
C
|
3 |
Incorporated various CCRs. |
Aug-2024 |
N
|
UFGS 03 30 00 Cast-In-Place Concrete |
Feb-2019 |
C
|
9 |
In response to CCR 15076, added "Type IT" cements to items i, ii, and iii in paragraph Freezing and Thawing Resistance (2.5.2.2) |
Aug-2024 |
N
|
UFGS 05 05 20 Post-Installed Concrete and Masonry Anchors |
May-2022 |
C
|
1 |
In response to CCR 15088, replaced Material Safety Data Sheets (MSDS) with Safety Data Sheets (SDS) in QUALITY ASSURANCE paragraph (1.5) |
Aug-2024 |
N
|
UFGS 05 50 13 Miscellaneous Metal Fabrications |
Aug-2024 |
R
|
|
Complete review and update. |
Aug-2024 |
N
|
UFGS 05 51 33 Metal Ladders |
Aug-2024 |
R
|
|
Complete review and update. |
Aug-2024 |
N
|
UFGS 06 20 00 Finish Carpentry |
Aug-2024 |
R
|
|
Complete review and update. |
Aug-2024 |
N
|
UFGS 07 27 19.01 Self-Adhering Air Barriers |
Aug-2023 |
C
|
1 |
In response to CCR 13571, corrected the air leakage rate in list item b. Assembly Air Leakage, under Physical Properties paragraph (2.1.1) |
Aug-2024 |
N
|
UFGS 08 34 16.10 Horizontal Rolling Steel Doors |
Nov-2021 |
C
|
1 |
In response to CCR 15267, corrected wind velocities in Wind Loads paragraph (1.3.2.1) to coordinate with UFC 3-301-01. |
Aug-2024 |
N
|
UFGS 08 34 16.20 Vertical Lift Fabric Doors |
Aug-2021 |
C
|
2 |
Corrected wind velocities in Wind Loads paragraph (1.3.2.1) to coordinate with UFC 3-301-01. |
Aug-2024 |
N
|
UFGS 08 34 63 Detention Hollow Metal Frames, Doors, and Door Frames |
Aug-2024 |
R
|
|
Complete review and update. |
Aug-2024 |
N
|
UFGS 08 56 53 Blast Resistant Tempered Glass Windows |
Aug-2020 |
C
|
1 |
In response to CCR 12317, updated section to active language (replacing "must") |
Aug-2024 |
N
|
UFGS 08 71 63 Detention Hardware |
Aug-2024 |
R
|
|
Complete review and update. |
Aug-2024 |
N
|
UFGS 09 22 00 Supports for Plaster and Gypsum Board |
Aug-2024 |
R
|
|
Complete review and update. |
Aug-2024 |
N
|
UFGS 09 22 36 Lath |
Aug-2024 |
R
|
|
Complete review and update. |
Aug-2024 |
N
|
UFGS 09 23 00 Gypsum Plastering |
Aug-2024 |
R
|
|
Complete review and update. |
Aug-2024 |
N
|
UFGS 09 26 00 Veneer Plaster |
Aug-2024 |
R
|
|
Complete review and update. |
Aug-2024 |
N
|
UFGS 09 29 00 Gypsum Board |
Aug-2024 |
R
|
|
Complete review and update. Incorporate CCRs #4960, 8088, 10091, 10122, 10479, 10609. |
Aug-2024 |
N
|
UFGS 09 97 23.16 Linseed Oil Protection of Concrete Surfaces |
Aug-2024 |
R
|
|
Complete review and update. |
Aug-2024 |
N
|
UFGS 10 21 23.16 Cubicle Track and Hardware |
Aug-2024 |
R
|
|
Complete review and update. |
Aug-2024 |
N
|
UFGS 10 22 13 Wire Mesh Partitions |
Aug-2024 |
R
|
|
Complete review and update. Incorporate CCRs #10216, 13813. |
Aug-2024 |
N
|
UFGS 10 22 26.13 Accordion Folding Partitions |
Aug-2024 |
R
|
|
Complete review and update. |
Aug-2024 |
N
|
UFGS 10 22 26.23 Coiling Partitions |
Aug-2024 |
R
|
|
Complete review and update. |
Aug-2024 |
N
|
UFGS 10 51 13 Lockers |
Aug-2024 |
R
|
|
Complete review and update including title change from “Metal Lockers” to “Lockers” |
Aug-2024 |
N
|
UFGS 10 56 13 Steel Shelving |
Aug-2024 |
R
|
|
Complete review and update. |
Aug-2024 |
N
|
UFGS 12 55 00 Detention Furniture and Accessories |
Aug-2024 |
R
|
|
Complete review and update. |
Aug-2024 |
N
|
UFGS 23 05 15 Common Piping for HVAC |
May-2022 |
C
|
2 |
In response to CCR 13457, added requirement for Type 19 and 23 C-clamps |
Aug-2024 |
A
|
UFGS 23 07 00 Thermal Insulation for Mechanical Systems |
Aug-2024 |
R
|
|
Complete review and update. |
Aug-2024 |
N
|
UFGS 23 09 53.00 20 Space Temperature Control Systems |
Feb-2010 |
C
|
3 |
Added PNEUMATIC tailoring option. |
Aug-2024 |
N
|
UFGS 33 11 00 Water Utility Distribution Piping |
Aug-2024 |
R
|
|
Complete review and update. |
Aug-2024 |
A
|
UFGS 33 60 02 Aboveground Heat Distribution System |
Aug-2024 |
R
|
|
Complete review and update. |
Aug-2024 |
A
|
UFGS 33 61 13 Pre-Engineered Underground Heat Distribution System |
Aug-2024 |
R
|
|
Complete review and update. |
Aug-2024 |
N
|
UFGS 34 60 13 Electric Vehicle Charging Facility (EVCF) |
Aug-2024 |
R
|
|
Complete review and update including renumber/retitle from UFGS-11 11 37 ELECTRIC VEHICLE SUPPLY EQUIPMENT to UFGS-34 60 13 ELECTRIC VEHICLE CHARGING FACILITY (EVCF). |