Status
Active
View/Download
PDF   ZIP  
Publish Date
Pages
18
Spec. Division
08 - Openings
CCR

History: Below is a listing of the Revisions and Changes made to this UFGS.

KEYPREPARING ACTIVITY (PA)A ArmyN NavyF Air ForceS NASA [ARCHIVED]
ACTIONN NewR RevisionC ChangeD Deletion
Release PA Action Change # Nature of Change or Revision
Aug-2025 N C 1

In response to the following CCRs: 15239 - updated U-Factor values in paragraph Insulation Cores; 16041 updated paragraphs Standard Steel Doors (2.1) and Standard Steel Frames (2.6).

Aug-2020 N R This is a periodic revision incorporating updated technical sustainability and corrosion control requirements and responses to CCRs as well as correcting formatting, references, and submittals.
Nov-2018 N C 3 Added note for door louvers and exterior screens in humid or ESC C3-C5 locations.
Aug-2018 N C 2 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Feb-2014 N C 1 Modified subpart 2.3
Feb-2010 N R Section References (SRF) update and minor revisions
Aug-2008 N R Added ATFP requirements for Door Glazing
Jul-2006 N R Added NASA requirements