Status
Retired / Superseded
Publish Date
Archived / Rescinded Date
Change Notice
Section archived; Superseded by UFGS 01 32 17.00 20 Cost-Loaded Network Analysis Schedules (NAS) for NAVFAC Design-Build projects.
Spec. Division
01 - General Requirements

History: Below is a listing of the Revisions and Changes made to this UFGS.

KEYPREPARING ACTIVITY (PA)A ArmyN NavyF Air ForceS NASA [ARCHIVED]
ACTIONN NewR RevisionC ChangeD Deletion
Release PA Action Change # Nature of Change or Revision
Aug-2025 N D

Section archived; Superseded by UFGS 01 32 17.00 20 Cost-Loaded Network Analysis Schedules (NAS) for NAVFAC Design-Build projects.

Aug-2020 N C 1 In response to the following CCRs: CCR 8738, clarified adverse weather requirements and schedule modifications required due to non-work days in paragraph "Anticipated Weather Lost Work Days" (1.3.1.2); CCRs 8822 and 9013, changes to submittal requirements for NAVFAC PAC to mitigate schedule impacts: added Note under Submittal Article SD-01 and updated paragraph "PRE-CONSTRUCTION SCHEDULE REQUIREMENT" (1.2).
Aug-2018 N R Updated Scheduling software settings and requirements and tailoring.  Added Design-Build Requirements.
Nov-2015 N C 2 Revised the Time Impact Analysis (TIA) action for Concurrent Delays.
May-2015 N C 1 Administrative changes to use of "must." Modified Monthly Network Analysis and Contract Administration paragraphs.
Feb-2015 N R Title changed from CONSTRUCTION PROGRESS DOCUMENTATION; thoroughly revised Schedule Format, Schedule Monthly Updates, and Contract Modification.
Nov-2009 N R Major revision