Aug-2025 |
N
|
UFGS 01 32 16.00 20 Small Project Construction Progress Schedules |
Aug-2018 |
D
|
|
Section archived; Superseded by UFGS 01 32 17.00 20 Cost-Loaded Network Analysis Schedules (NAS) for NAVFAC Design-Build projects. |
Aug-2025 |
N
|
UFGS 01 33 29 Sustainability Requirements and Reporting |
Feb-2021 |
C
|
1 |
Section changes to align with UFC 1-200-02 High Performance and Sustainable Building Requirements, Change 3 (July 08, 2025) |
Aug-2025 |
N
|
UFGS 01 35 13 Special Project Procedures |
Nov-2020 |
C
|
2 |
In response to CCR 16609, Annual Pearl Harbor "Hydrofest" is no longer a standard for NAVFAC HI Projects and has been deleted (3.2.5). |
Aug-2025 |
N
|
UFGS 01 45 00 Quality Control |
Aug-2023 |
C
|
3 |
In response to CCR 16473, "quality control" has been added to list item d. in paragraph Quality Control (QC) Meetings (1.5.1.3). |
Aug-2025 |
N
|
UFGS 01 57 19 Temporary Environmental Controls |
Aug-2022 |
C
|
2 |
In response to CCR 16848, updated Recyclables paragraph (1.2.20.6). |
Aug-2025 |
A
|
UFGS 02 81 00 Transportation and Disposal of Hazardous Materials |
Aug-2025 |
R
|
|
Complete review and update. |
Aug-2025 |
N
|
UFGS 02 82 00 Asbestos Remediation |
Aug-2025 |
R
|
|
Complete review and update. |
Aug-2025 |
N
|
UFGS 02 83 00 Lead Remediation |
Aug-2025 |
R
|
|
Complete review and update. |
Aug-2025 |
N
|
UFGS 02 85 00 Mold Remediation |
Aug-2025 |
R
|
|
Complete review and update. |
Aug-2025 |
N
|
UFGS 03 30 00 Cast-In-Place Concrete |
Feb-2019 |
C
|
10 |
In response to the following CCRs: 13637 - added ASTM references, updated paragraphs "Admixtures" (2.3.4 e), "Properties and Requirements" (2.5.1 f and g), "Strength ofConcrete Required for Removal of Formwork" (3.3.10), "Mixing" (3.6.2 b), "Concrete Sampling" (3.14.2), "Slump Tests" (3.14.3.1), "Compressive Strength Tests" (3.14.3.4), and "Air Content" (3.14.3.5). Added new paragraph "Slump Flow and Visual Stability Index Tests" (3.14.3.2); CCRs 13637, 15345, and 16154 - updated Submittal Article SD-03 and SD-06; CCR 15427 - replaced reference "ACI 308.1" with “ACI SPEC 308.1"; CCR 15860 - updated paragraph "Normal-Weight Aggregate" (2.3.3.1 a) to include reference to ACI 302.1R, Table 8.5.1; CCR 16032 - added Note and updated "Welding" paragraph (2.6.8 a). |
Aug-2025 |
N
|
UFGS 03 45 00 Precast Architectural Concrete |
May-2016 |
C
|
3 |
In response to CCR 15942, updated Fabricator Quality Certifications paragraph (1.8.1), with current PCI Certification Types. |
Aug-2025 |
A
|
UFGS 04 03 00 Conservation Treatment for Period Masonry |
Aug-2025 |
R
|
|
Complete review and update. |
Aug-2025 |
A
|
UFGS 04 23 00 Glass Unit Masonry |
Aug-2025 |
R
|
|
Complete review and update. |
Aug-2025 |
N
|
UFGS 05 50 13 Miscellaneous Metal Fabrications |
Aug-2024 |
C
|
1 |
Updated paragraphs CORNER GUARDS (2.4) and MISCELLANEOUS PLATES AND SHAPES (2.9) to require "hot dip galvanized". |
Aug-2025 |
A
|
UFGS 06 41 16.00 10 Plastic-Laminate-Clad Architectural Cabinets |
Aug-2025 |
R
|
|
Complete review and update. |
Aug-2025 |
N
|
UFGS 07 12 00 Built-Up Bituminous Waterproofing |
Aug-2025 |
R
|
|
Complete review and update. |
Aug-2025 |
N
|
UFGS 07 13 53 Elastomeric Sheet Waterproofing |
Aug-2025 |
R
|
|
Complete review and update. |
Aug-2025 |
N
|
UFGS 07 17 00 Bentonite Waterproofing |
Aug-2025 |
R
|
|
Complete review and update. |
Aug-2025 |
N
|
UFGS 07 21 13 Board and Block Insulation |
Aug-2023 |
C
|
1 |
In response to CCR 15491, updated list items in Vapor Retarder under Floor Slab paragraph (2.2.3).. |
Aug-2025 |
N
|
UFGS 07 21 16 Mineral Fiber Blanket Insulation |
Aug-2023 |
C
|
1 |
In response to CCRs 14183 and 14753 updated requirement for list item b. Mineral Wool in Recycled Materials paragraph (2.1.1). |
Aug-2025 |
N
|
UFGS 07 31 13 Asphalt Shingles |
Aug-2025 |
R
|
|
Complete review and update. |
Aug-2025 |
A
|
UFGS 07 31 26 Slate Shingles |
Aug-2025 |
R
|
|
Complete review and update. |
Aug-2025 |
A
|
UFGS 07 31 26 Slate Shingles |
Aug-2025 |
R
|
|
Complete review and update. |
Aug-2025 |
N
|
UFGS 07 32 13 Roof Tiles |
Aug-2025 |
R
|
|
Complete review and update including title change; from "ROOF TILES" to "CONCRETE TILE ROOFING REPLACEMENT OR REPAIR". |
Aug-2025 |
N
|
UFGS 07 32 14 Clay Tile Roofing Replacement or Repair |
Aug-2025 |
R
|
|
Complete review and update. |
Aug-2025 |
N
|
UFGS 07 41 13 Metal Roof Panels |
Aug-2025 |
R
|
|
Complete review and update. |
Aug-2025 |
A
|
UFGS 07 41 13.16 Copper Roof Panels |
Aug-2025 |
R
|
|
Complete review and update. |
Aug-2025 |
A
|
UFGS 07 41 63 Fabricated Roof Panel Assemblies |
Aug-2025 |
R
|
|
Complete review and update. |
Aug-2025 |
N
|
UFGS 07 42 13 Metal Wall Panels |
Aug-2025 |
R
|
|
Complete review and update. |
Aug-2025 |
N
|
UFGS 07 42 63 Fabricated Wall Panel Assemblies |
Aug-2025 |
R
|
|
Complete review and update. |
Aug-2025 |
N
|
UFGS 07 51 13 Built-Up Asphalt Roofing |
Aug-2025 |
R
|
|
Complete review and update. |
Aug-2025 |
N
|
UFGS 07 52 00 Modified Bituminous Membrane Roofing |
Aug-2025 |
R
|
|
Complete review and update. |
Aug-2025 |
N
|
UFGS 07 53 23 Ethylene-Propylene-Diene-Monomer Roofing |
Aug-2025 |
R
|
|
Complete review and update. |
Aug-2025 |
A
|
UFGS 07 55 00 Protected Membrane Roofing (PMR) |
Aug-2025 |
R
|
|
Complete review and update. |
Aug-2025 |
N
|
UFGS 07 57 13 Sprayed Polyurethane Foam (SPF) Roofing |
Aug-2025 |
R
|
|
Complete review and update. |
Aug-2025 |
N
|
UFGS 07 61 14.00 20 Steel Standing Seam Roofing |
Aug-2016 |
D
|
|
Superseded by unified Section UFGS-07 61 14 STEEL STANDING SEAM ROOFING.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
Aug-2025 |
A
|
UFGS 07 62 13 Copper Sheet Metal Flashing and Trim |
Aug-2025 |
R
|
|
Complete review and update. |
Aug-2025 |
N
|
UFGS 08 11 13 Steel Doors and Frames |
Aug-2020 |
C
|
1 |
In response to the following CCRs: 15239 - updated U-Factor values in paragraph Insulation Cores; 16041 updated paragraphs Standard Steel Doors (2.1) and Standard Steel Frames (2.6). |
Aug-2025 |
A
|
UFGS 08 13 73 Sliding Metal Doors |
Aug-2025 |
R
|
|
Complete review and update. |
Aug-2025 |
A
|
UFGS 08 33 13 Coiling Counter Doors |
Aug-2025 |
R
|
|
Complete review and update. |
Aug-2025 |
A
|
UFGS 08 34 58 File Room Doors and Frames |
Aug-2025 |
R
|
|
Complete review and update. |
Aug-2025 |
A
|
UFGS 08 34 59 Vault Doors and Day Gates |
Aug-2025 |
R
|
|
Complete review and update. |
Aug-2025 |
A
|
UFGS 08 87 23.13 Safety Films |
Aug-2009 |
D
|
|
Archived with no replacement.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
Aug-2025 |
A
|
UFGS 09 64 23 Wood Parquet Flooring |
Aug-2016 |
D
|
|
Archived with no replacement.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
Aug-2025 |
N
|
UFGS 09 97 23.16 Linseed Oil Protection of Concrete Surfaces |
Aug-2024 |
D
|
|
Archived with no replacement; Section uses old technology, any relevant information is covered in other UFGS sections.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
Aug-2025 |
A
|
UFGS 11 46 00 Food Dispensing Equipment |
Aug-2025 |
R
|
|
Complete review and update. |
Aug-2025 |
N
|
UFGS 12 35 30.23 20 Bathroom Casework |
Aug-2011 |
D
|
|
Archived with no replacement.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
Aug-2025 |
A
|
UFGS 12 35 39 Commercial Kitchen Casework |
Aug-2017 |
D
|
|
Archived with no replacement.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
Aug-2025 |
N
|
UFGS 14 21 13 Electric Traction Freight Elevators |
Aug-2025 |
R
|
|
Complete review and update. |
Aug-2025 |
N
|
UFGS 14 21 23 Electric Traction Passenger Elevators |
Aug-2025 |
R
|
|
Complete review and update. |
Aug-2025 |
N
|
UFGS 14 24 13 Hydraulic Freight Elevators |
Aug-2025 |
R
|
|
Complete review and update. |
Aug-2025 |
N
|
UFGS 14 24 23 Hydraulic Passenger Elevators |
Aug-2025 |
R
|
|
Complete review and update. |
Aug-2025 |
A
|
UFGS 22 33 30.00 10 Solar Water Heating Equipment |
Aug-2020 |
D
|
|
Superseded by UFGS 22 33 30 SOLAR WATER HEATING EQUIPMENT.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
Aug-2025 |
A
|
UFGS 23 09 00 Instrumentation and Control for HVAC |
Aug-2024 |
C
|
1 |
Incorporated various CCRs.. |
Aug-2025 |
A
|
UFGS 23 50 52.00 10 Central High Temperature Water (HTW) Generating Plant and Auxiliaries |
Feb-2016 |
D
|
|
Archived with no replacement.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
Aug-2025 |
A
|
UFGS 23 58 00.00 10 Central Steam Heating and Utilities Systems |
May-2020 |
D
|
|
Archived with no replacement.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
Aug-2025 |
A
|
UFGS 25 10 10 Utility Monitoring and Control System (UMCS) Front End and Integration |
Feb-2019 |
C
|
2 |
Incorporated various CCRs. |
Aug-2025 |
A
|
UFGS 25 10 10 Utility Monitoring and Control System (UMCS) Front End and Integration |
Feb-2019 |
C
|
2 |
Incorporated various CCRs. |
Aug-2025 |
A
|
UFGS 26 05 13.00 10 Medium-Voltage Cables |
Nov-2023 |
D
|
|
Superseded by UFGS 26 05 13 MEDIUM-VOLTAGE CABLES.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
Aug-2025 |
N
|
UFGS 26 20 00 Interior Distribution System |
May-2025 |
C
|
1 |
Telecommunications systems information removed and relocated to UFGS-27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM. |
Aug-2025 |
A
|
UFGS 33 46 13 Foundation Drainage |
May-2020 |
D
|
|
Archived with no replacement.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
Aug-2025 |
A
|
UFGS 33 56 53 Compressed Gases Storage Tanks |
May-2020 |
D
|
|
Archived with no replacement.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
Aug-2025 |
N
|
UFGS 33 57 55 Fuel Systems Components (Non-Hydrant) |
Aug-2025 |
R
|
|
Complete review and update. |
Aug-2025 |
A
|
UFGS 43 11 00.10 Off-Gas Fans, Blowers and Pumps |
May-2020 |
D
|
|
Archived with no replacement.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
Aug-2025 |
A
|
UFGS 44 13 10.13 Vapor Phase Activated Carbon Adsorption Units |
May-2020 |
D
|
|
Archived with no replacement.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
Aug-2025 |
A
|
UFGS 44 13 51 Thermal Oxidation Equipment |
May-2020 |
D
|
|
Archived with no replacement.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
Aug-2025 |
A
|
UFGS 46 30 13 Advanced Oxidation Processes (AOP) |
Aug-2025 |
R
|
|
Complete review and update. |
Aug-2025 |
A
|
UFGS 46 71 16 Gravity Belt Thickeners |
Aug-2025 |
R
|
|
Complete review and update. |
Aug-2025 |
N
|
UFGS 48 14 13.00 20 Solar Liquid Flat Plate and Evacuated Tube Collectors |
May-2015 |
D
|
|
Section archived; Superseded by unified section UFGS 22 33 30 SOLAR WATER HEATING EQUIPMENT.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
May-2025 |
N
|
UFGS 01 11 00 Summary of Work |
Feb-2024 |
C
|
1 |
In response to the following: CCR 14812, added "dual frequency" to GPR in paragraph LOCATION OF UNDERGROUND UTILITIES (1.5); CCR 15262, changed to initial capital "Contract" in four locations; and CCR 16075, added new bracketed paragraph Utility Locations (1.5.2) to address requirements for locating underground utilities. |
May-2025 |
N
|
UFGS 01 14 00 Work Restrictions |
Nov-2022 |
C
|
5 |
In response to the following: CCR 15090, updated paragraph Extraordinary Security Requirements (1.14.1.1) and CCR 16084, removed duplicate paragraph Personnel List under Employment Restrictions For NAVFAC SW (1.6.18). |
May-2025 |
N
|
UFGS 01 32 17.00 20 Cost-Loaded Network Analysis Schedules (NAS) |
May-2025 |
R
|
|
Complete review and update. |
May-2025 |
A
|
UFGS 01 32 33.00 10 Photographic Documentation |
May-2025 |
N
|
|
New UFGS Section to address requirements for Photographic Documentation on all contract delivery types. |
May-2025 |
A
|
UFGS 01 35 13.43 10 Special Project Procedures for Contaminated Sites |
Aug-2015 |
D
|
|
Section is archived with no replacement.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
May-2025 |
N
|
UFGS 01 35 26 Governmental Safety Requirements |
May-2024 |
C
|
1 |
In response to the following: CCR 15361, promoted 'USE OF EXPLOSIVES' from a subparagraph to a main paragraph/article (3.7); CCR 15362, updated Monthly Exposure Report paragraph (1.5); CCR 15523, added Accident Prevention Plan (APP) Design and Accident Prevention Plan (APP) Construction to Submittals and text; CCR 15536, added Critical Lift Plan to Submittals and text; and CCR 16414, updated paragraph Unforeseen Hazardous Material (3.1.4) |
May-2025 |
N
|
UFGS 01 45 00 Quality Control |
Aug-2023 |
C
|
2 |
In response to the following: CCR 15269 added "FC 1-300-09N" to the References Article; CCR 15448, updated Construction Quality Management Training paragraph (1.6.2.3); CCR 15700 updated bracketed option in paragraph Coordination and Mutual Understanding Meeting (1.5.1.2) and updated paragraph Acceptance of the Quality Control (QC) and Design Quality Control (DQC) Plan (1.5.3). Non-Technical CCRs 15466, 15469, 16004, 16145,, and 16432 also addressed. |
May-2025 |
N
|
UFGS 01 57 19 Temporary Environmental Controls |
Aug-2022 |
C
|
1 |
In response to the following: CCR 14366, replaced "Safety Plan" with "Accident Prevention Plan (APP)" in HAZARDOUS MATERIAL MANAGEMENT paragraph (1.3.8); CCR 14378, updated Protection of the Environment from Waste Derived from Contractor Operations paragraph (1.7.6); CCR 14380, added additional environmental requirements for NW region to align with new environmental regulations; CCRs 14410, 14411, and 14412, updated Cuba's requirement in Parts 2 and 3; CCR 14528, added new WASHINGTON tailoring for Location Specific Universal Waste paragraph (1.2.26); CCR 14539, added 40 CFR 372 to REFERENCES; CCR 14658 updated Submittal Article; CCR 15470, added brackets and Note to Documentation paragraph (1.7.2.3); and CCRs 15851 & 16065, added 'Critical Root Zone' definition. |
May-2025 |
N
|
UFGS 01 78 23 Operation and Maintenance Data |
May-2023 |
C
|
1 |
In response to the following: CCRs 12782 and 14164, added new list item "Risk Category V" under paragraph O&M MANUAL CONTENT (1.6); CCR 15035, updated language in paragraph Operation and Maintenance Manual, Prefinal Submittal (3.2.2) |
May-2025 |
A
|
UFGS 04 01 20.73 Masonry Strengthening Using FRP Bars |
May-2025 |
R
|
|
Complete review and update. |
May-2025 |
A
|
UFGS 04 01 20.75 Masonry Strengthening Using Surface Applied FRP Composites |
May-2025 |
R
|
|
Complete review and update. |
May-2025 |
A
|
UFGS 04 20 00 Unit Masonry |
May-2025 |
R
|
|
Complete review and update. |
May-2025 |
N
|
UFGS 06 10 00 Rough Carpentry |
Aug-2016 |
C
|
3 |
In response to CCR 13960, updated Submittals Article (1.2) removing/relocating non-submittal items. |
May-2025 |
N
|
UFGS 07 60 00 Flashing and Sheet Metal |
Aug-2023 |
C
|
1 |
In response to CCR 14505, corrected metric measurement in Table I. |
May-2025 |
N
|
UFGS 09 29 00 Gypsum Board |
Aug-2024 |
C
|
1 |
In response to the following: CCR 10091, added bracketed text to Finishing of Gypsum Board (3.4); CCR 10609, updated 'Abuse Resistant Gypsum Board' and 'Hard Body Impact Test' paragraphs to Level 1 performance; and CCR 14909, deleted "tapered edge" from Joint Tape paragraph (2.1.9.5) |
May-2025 |
A
|
UFGS 13 48 73 Seismic Control For Nonstructural Components |
May-2025 |
R
|
|
Complete review and update including section title change from SEISMIC CONTROL FOR MISCELLANEOUS EQUIPMENT to SEISMIC CONTROL FOR NONSTRUCTURAL COMPONENTS. |
May-2025 |
N
|
UFGS 21 12 00 Standpipe Systems |
May-2011 |
N
|
|
Reinstated May 2011 version of Section without any revisions; Section was previously archived February 2024 due to limited use. |
May-2025 |
A
|
UFGS 22 31 00 Water Softeners, Cation-Exchange (Sodium Cycle) |
Feb-2009 |
D
|
|
Superseded by UFGS 22 31 03 DOMESTIC WATER SOFTENERS AND WATER CONDITIONERSNote: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
May-2025 |
A
|
UFGS 22 31 03 Domestic Water Softeners and Water Conditioners |
May-2025 |
N
|
|
New Section superseding UFGS 22 31 00 WATER SOFTENERS, CATION EXCHANGE (SODIUM CYCLCE). |
May-2025 |
N
|
UFGS 23 05 93 Testing, Adjusting, and Balancing for HVAC |
May-2025 |
R
|
|
Complete review and update. |
May-2025 |
A
|
UFGS 23 21 23 Hydronic Pumps |
May-2025 |
R
|
|
Complete review and update. |
May-2025 |
N
|
UFGS 23 64 10 Water Chillers, Vapor Compression Type |
May-2025 |
R
|
|
Complete review and update. |
May-2025 |
N
|
UFGS 23 65 00 Cooling Towers and Remote Evaporatively-Cooled Condensers |
May-2025 |
R
|
|
Complete review and update. |
May-2025 |
N
|
UFGS 26 20 00 Interior Distribution System |
May-2025 |
R
|
|
Complete review and update. |
May-2025 |
N
|
UFGS 27 10 00 Building Telecommunications Cabling System |
May-2025 |
R
|
|
Complete review and update. |
May-2025 |
A
|
UFGS 31 33 10 Foundation Drilling and Grouting in Rock |
May-2025 |
N
|
|
New UFGS Section to address rock grouting scenarios where grouting occurs directly on the bedrock surface, through soil, or through limited concrete. |
May-2025 |
A
|
UFGS 31 73 19 Tunnel and Shaft Grouting |
May-2025 |
R
|
|
Complete review and update. |
May-2025 |
A
|
UFGS 32 01 29.62 Concrete Pavement Raising |
May-2025 |
R
|
|
Complete review and update. |
May-2025 |
A
|
UFGS 32 12 19.16 Resin-Modified Asphalt Paving Wearing Courses |
May-2025 |
R
|
|
Complete review and update. |
May-2025 |
N
|
UFGS 33 01 50.75 Repair of Field Fabricated Fuel Storage Tanks |
May-2025 |
N
|
|
New Section to address the repair of a field fabricated fuel storage tank. |
May-2025 |
N
|
UFGS 33 08 55 Fuel Distribution System Start-Up (Non-Hydrant) |
May-2025 |
R
|
|
Complete review and update. |