Below is a listing of the Revisions and Changes made to UFGS Sections for each release. You can narrow the list by selecting a UFGS Release date from the drop-down and clicking 'Apply'.
| KEY | PREPARING ACTIVITY (PA) | A Army | N Navy | F Air Force | S NASA [ARCHIVED] |
|---|---|---|---|---|---|
| ACTION | N New | R Revision | C Change | D Deletion |
| Release | PA | UFGS Section | Date | Action | Change # | Nature of Change or Revision |
|---|---|---|---|---|---|---|
| Feb-2010 | A | UFGS 01 33 23.33 Aviation Fuel System Specific Submittal Requirements | Feb-2010 | N | New Section | |
| Feb-2010 | N | UFGS 01 33 29 Sustainability Requirements and Reporting | Feb-2010 | R | Section References (SRF) update and other minor revisions. | |
| Feb-2010 | N | UFGS 01 35 26 Governmental Safety Requirements | Feb-2010 | R | Section References (SRF) update | |
| Feb-2010 | N | UFGS 01 35 40.00 20 Environmental Management | Feb-2010 | R | Section References (SRF) update | |
| Feb-2010 | A | UFGS 01 45 00.00 10 Quality Control | Feb-2010 | N | New section; Supersedes UFGS 01 45 01 USACE Quality Control | |
| Feb-2010 | N | UFGS 01 45 00.00 20 Quality Control | Feb-2010 | N | New section; Supersedes UFGS 01 45 02 NAVFAC Quality Control | |
| Feb-2010 | S | UFGS 01 45 00.00 40 Quality Control | Feb-2010 | N | New section; Supersedes UFGS 01 45 04 NASA Quality Control | |
| Feb-2010 | A | UFGS 01 45 00.10 10 Quality Control System (QCS) | Feb-2010 | N | New section; Supersedes UFGS 01 45 01.10 USACE Quality Control System (QCS) | |
| Feb-2010 | N | UFGS 01 45 00.10 20 Quality Control for Minor Construction | Feb-2010 | N | New section; Supersedes UFGS 01 45 02.10 NAVFAC Quality Control for Minor Construction | |
| Feb-2010 | A | UFGS 01 45 01 USACE Quality Control | Jan-2008 | D | Section renamed; Superseded by UFGS 01 45 00.00 10 Quality Control Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
| Feb-2010 | A | UFGS 01 45 01.10 USACE Quality Control System (QCS) | Jan-2008 | D | Section renamed; Superseded by UFGS 01 45 00.10 10 Quality Control System (QCS) Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
| Feb-2010 | N | UFGS 01 45 02 NAVFAC Quality Control | Nov-2009 | D | Superseded by UFGS 01 45 00.00 20 Quality Control Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
| Feb-2010 | N | UFGS 01 45 02.10 NAVFAC Quality Control for Minor Construction | Nov-2008 | D | Superseded by UFGS 01 45 00.10 20 Quality Control for Minor Construction Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
| Feb-2010 | S | UFGS 01 45 04 NASA Quality Control | Aug-2008 | D | Section renamed; Superseded by UFGS 01 45 00.00 40 Quality Control Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
| Feb-2010 | N | UFGS 01 57 19.00 20 Temporary Environmental Controls | Feb-2010 | R | Section References (SRF) update; fixed General Note; minor revisions | |
| Feb-2010 | N | UFGS 01 57 19.01 20 Supplemental Temporary Environmental Controls | Feb-2010 | R | Section References (SRF) update; fixed General Note; minor revisions | |
| Feb-2010 | A | UFGS 01 78 23.33 Operation and Maintenance Manuals for Aviation Fuel Systems | Feb-2010 | N | New section | |
| Feb-2010 | S | UFGS 01 83 00.07 40 Reliability Centered Acceptance for Facility Shells | Feb-2010 | N | New section | |
| Feb-2010 | S | UFGS 01 83 13.07 40 Reliability Centered Acceptance for Superstructure Performance Requirements | Feb-2010 | N | New section | |
| Feb-2010 | S | UFGS 01 86 12.07 40 Reliability Centered Acceptance for Mechanical Systems | Feb-2010 | N | New section | |
| Feb-2010 | S | UFGS 01 86 26.07 40 Reliability Centered Acceptance for Electrical Systems | Feb-2010 | N | New section | |
| Feb-2010 | A | UFGS 02 53 16 Remediation of Contaminated Soils By Thermal Desorption | Feb-2010 | R | Compliance with CSI SectionFormat | |
| Feb-2010 | A | UFGS 02 54 20 Bioremediation of Soils Using Landfarming Systems | Feb-2010 | R | Compliance with CSI SectionFormat | |
| Feb-2010 | A | UFGS 02 54 21 Bioremediation of Soils Using Windrow Composting | Feb-2010 | R | Compliance with CSI SectionFormat | |
| Feb-2010 | A | UFGS 02 54 23 Soil Washing Through Separation/Solubilization | Feb-2010 | R | Compliance with CSI SectionFormat | |
| Feb-2010 | A | UFGS 02 55 00 Solidification/Stabilization (S/S) of Contaminated Material | Feb-2010 | R | Compliance with CSI SectionFormat | |
| Feb-2010 | A | UFGS 02 56 13 Waste Containment Geomembrane | Feb-2010 | R | Compliance with CSI SectionFormat | |
| Feb-2010 | A | UFGS 02 56 14 Clay Barrier Layer | Feb-2010 | R | Compliance with CSI SectionFormat | |
| Feb-2010 | A | UFGS 02 56 15 Geosynthetic Clay Liner (GCL) | Feb-2010 | R | Compliance with CSI SectionFormat | |
| Feb-2010 | A | UFGS 02 61 13 Excavation and Handling of Contaminated Material | Feb-2010 | R | Compliance with CSI SectionFormat | |
| Feb-2010 | A | UFGS 02 62 16 Commissioning and Demonstration for Soil Vapor Extraction (SVE) Systems | Feb-2010 | R | Compliance with CSI SectionFormat | |
| Feb-2010 | A | UFGS 02 65 00 Underground Storage Tank Removal | Feb-2010 | R | Compliance with CSI SectionFormat | |
| Feb-2010 | A | UFGS 02 66 00 Select Fill and Topsoil for Landfill Cover | Feb-2010 | R | Compliance with CSI SectionFormat | |
| Feb-2010 | A | UFGS 02 66 10 Test Fill | Feb-2010 | R | Compliance with CSI SectionFormat | |
| Feb-2010 | A | UFGS 02 81 00 Transportation and Disposal of Hazardous Materials | Feb-2010 | R | Compliance with CSI SectionFormat | |
| Feb-2010 | A | UFGS 02 82 14.00 10 Asbestos Hazard Control Activities | Feb-2010 | R | Compliance with CSI SectionFormat | |
| Feb-2010 | N | UFGS 02 82 16.00 20 Engineering Control of Asbestos Containing Materials | Feb-2010 | R | Reference Identifier (RID) and Section References (SRF) updates | |
| Feb-2010 | N | UFGS 02 82 33.13 20 Removal/Control and Disposal of Paint with Lead | Feb-2010 | R | Removed SD-08 Manufacturer's Instructions and other minor revisions | |
| Feb-2010 | A | UFGS 02 83 19.00 10 Lead Based Paint Hazard Abatement, Target Housing and Child Occupied Facilities | Feb-2010 | R | Compliance with CSI SectionFormat | |
| Feb-2010 | N | UFGS 03 31 29 Marine Concrete with Service Life Modeling | Feb-2010 | R | Section References (SRF) update; fixed table 2.1.2e | |
| Feb-2010 | N | UFGS 03 53 14.00 20 Light Reflective Nonferrous Metallic Aggregate Floor System | Feb-2010 | R | Section References (SRF) update; removed reference to IESNA LM-44 | |
| Feb-2010 | A | UFGS 03 70 00 Mass Concrete | Feb-2010 | R | Compliance with CSI SectionFormat | |
| Feb-2010 | A | UFGS 05 59 10 Rolling Cover for Aviation Refueling Vaults | Feb-2010 | N | New section | |
| Feb-2010 | S | UFGS 06 73 01 Fiberglass Reinforced Plastic (FRP) Grating | Feb-2010 | N | New section | |
| Feb-2010 | N | UFGS 07 21 13 Board and Block Insulation | Feb-2010 | R | Section References (SRF) update; removed reference to ASTM D828 | |
| Feb-2010 | N | UFGS 07 21 16 Mineral Fiber Blanket Insulation | Feb-2010 | R | Section References (SRF) update; removed reference to ASTM D828 | |
| Feb-2010 | N | UFGS 07 21 23 Loose Fill Thermal Insulation | Feb-2010 | R | Section References (SRF) update; removed reference to ASTM D828 | |
| Feb-2010 | N | UFGS 08 11 13 Steel Doors and Frames | Feb-2010 | R | Section References (SRF) update and minor revisions | |
| Feb-2010 | N | UFGS 08 11 69 Metal Storm Doors | Feb-2010 | R | Section References (SRF) update; removed reference to AAMA 1102.7 | |
| Feb-2010 | N | UFGS 09 22 00 Supports for Plaster and Gypsum Board | Feb-2010 | R | Replaced reference to P-355 with UFC 3-310-04 | |
| Feb-2010 | N | UFGS 09 67 23.15 Fuel Resistive Resinous Flooring, 3-Coat System | Feb-2010 | R | Section References (SRF) update | |
| Feb-2010 | N | UFGS 09 67 23.15 Fuel Resistive Resinous Flooring, 3-Coat System | Feb-2010 | R | Section References (SRF) update | |
| Feb-2010 | N | UFGS 09 67 23.16 Fuel Resistive Resinous Flooring, 5-Coat System | Feb-2010 | R | Section References (SRF) update | |
| Feb-2010 | N | UFGS 09 67 23.16 Fuel Resistive Resinous Flooring, 5-Coat System | Feb-2010 | R | Section References (SRF) update | |
| Feb-2010 | N | UFGS 09 90 00 Paints and Coatings | Feb-2010 | R | Revised note in 1.12 | |
| Feb-2010 | N | UFGS 09 97 13.16 Interior Coating of Welded Steel Water Tanks | Feb-2010 | R | Section References (SRF) update | |
| Feb-2010 | N | UFGS 09 97 13.16 Interior Coating of Welded Steel Water Tanks | Feb-2010 | R | Section References (SRF) update | |
| Feb-2010 | N | UFGS 09 97 13.17 Three Coat Epoxy Interior Coating of Welded Steel Petroleum Fuel Tanks | Feb-2010 | R | Section References (SRF) update | |
| Feb-2010 | N | UFGS 09 97 13.17 Three Coat Epoxy Interior Coating of Welded Steel Petroleum Fuel Tanks | Feb-2010 | R | Section References (SRF) update | |
| Feb-2010 | N | UFGS 09 97 13.25 Maintenance, Repair, and Coating of Tall Antenna Towers | Feb-2010 | R | Section References (SRF) update | |
| Feb-2010 | N | UFGS 09 97 13.25 Maintenance, Repair, and Coating of Tall Antenna Towers | Feb-2010 | R | Section References (SRF) update | |
| Feb-2010 | N | UFGS 09 97 13.27 High Performance Coating for Steel Structures | Feb-2010 | R | Section References (SRF) update | |
| Feb-2010 | N | UFGS 09 97 13.27 High Performance Coating for Steel Structures | Feb-2010 | R | Section References (SRF) update | |
| Feb-2010 | N | UFGS 09 97 13.28 Protection of Buried Steel Piping and Steel Bulkhead Tie Rods | Feb-2010 | R | Section References (SRF) update | |
| Feb-2010 | N | UFGS 09 97 13.28 Protection of Buried Steel Piping and Steel Bulkhead Tie Rods | Feb-2010 | R | Section References (SRF) update | |
| Feb-2010 | A | UFGS 12 24 13 Roller Window Shades | Feb-2010 | R | Complete revision; primarily expanded the paragraph on Light Filtering Shades | |
| Feb-2010 | N | UFGS 22 00 00 Plumbing, General Purpose | Feb-2010 | R | Section References (SRF) update; added brackets to para 2.4.3 ; other minor revisions throughout | |
| Feb-2010 | N | UFGS 22 00 00 Plumbing, General Purpose | Feb-2010 | R | Section References (SRF) update and other minor revisions; added information regarding polypropylene piping | |
| Feb-2010 | N | UFGS 23 09 53.00 20 Space Temperature Control Systems | Feb-2010 | R | Section References (SRF) update | |
| Feb-2010 | N | UFGS 23 22 26.00 20 Steam System and Terminal Units | Feb-2010 | R | Section References (SRF) update | |
| Feb-2010 | S | UFGS 23 34 23 HVAC Power Ventilators | Feb-2010 | R | Minor revisions; Inserted Tailoring Tags for Reliability Centered Building and Equipment Acceptance (RCBEA) | |
| Feb-2010 | N | UFGS 23 35 19.00 20 Industrial Ventilation and Exhaust | Feb-2010 | R | Reference Identifier (RID) and Section References (SRF) updates | |
| Feb-2010 | N | UFGS 23 51 43.00 20 Dust and Gas Collector, Dry Scrubber and Fabric Filter Type | Feb-2010 | R | Section References (SRF) update | |
| Feb-2010 | N | UFGS 23 51 43.03 20 Fabric Filter Dust Collector of Fly Ash Particles in Flue Gas | Feb-2010 | R | Section References (SRF) update | |
| Feb-2010 | N | UFGS 23 81 23.00 20 Computer Room Air Conditioning Units | Feb-2010 | R | Section References (SRF) update | |
| Feb-2010 | N | UFGS 26 11 16 Secondary Unit Substations | Feb-2010 | R | Section References (SRF) update | |
| Feb-2010 | A | UFGS 26 32 14.00 10 Diesel-Generator Set, Stationary 15-300 KW, Standby Applications | Feb-2010 | R | Formatting correction including submittals | |
| Feb-2010 | N | UFGS 28 31 02.00 20 Fire Alarm Reporting Systems - Digital Communicators | Feb-2010 | R | Section References (SRF) update | |
| Feb-2010 | N | UFGS 28 31 73.00 20 Exterior Fire Alarm System, Closed Circuit Telegraphic Type | Feb-2010 | R | Section References (SRF) update | |
| Feb-2010 | N | UFGS 28 31 74.00 20 Interior Fire Detection and Alarm System | Feb-2010 | R | Section References (SRF) update | |
| Feb-2010 | N | UFGS 32 05 33 Landscape Establishment | Feb-2010 | R | Reference Identifier (RID) and Section References (SRF) updates | |
| Feb-2010 | N | UFGS 32 93 00 Exterior Plants | Feb-2010 | R | Reference Identifier (RID) and Section References (SRF) updates | |
| Feb-2010 | N | UFGS 32 96 00 Transplanting Exterior Plants | Feb-2010 | R | Reference Identifier (RID) and Section References (SRF) updates | |
| Feb-2010 | A | UFGS 33 01 50.01 Cleaning Fuel Storage Tanks | Feb-2010 | N | New section | |
| Feb-2010 | S | UFGS 33 05 23.13 Utility Horizontal Directional Drilling | Feb-2010 | N | New section | |
| Feb-2010 | A | UFGS 33 08 53 Aviation Fuel Distribution System Start-Up | Feb-2010 | N | New section | |
| Feb-2010 | A | UFGS 33 09 53 Aviation Fuel Pump Control and Annunciation System (Type III) | Feb-2010 | N | New section | |
| Feb-2010 | A | UFGS 33 09 54 Aviation Fuel Pump Control and Annunciation System (Type [IV][V]) | Feb-2010 | N | New section | |
| Feb-2010 | A | UFGS 33 09 55 Aviation Fuel Pump Control and Annunciation System (Cut-N-Cover Tanks) | Feb-2010 | N | New section | |
| Feb-2010 | A | UFGS 33 40 00 Stormwater Utilities | Feb-2010 | R | In response to CCR 2210, tailoring options for Pipe Materials added. | |
| Feb-2010 | A | UFGS 33 52 43.11 Aviation Fuel Mechanical Equipment | Feb-2010 | N | New section | |
| Feb-2010 | A | UFGS 33 52 43.12 Aviation Fuel Pantographs | Feb-2010 | N | New section | |
| Feb-2010 | A | UFGS 33 52 43.13 Aviation Fuel Piping | Feb-2010 | N | New section | |
| Feb-2010 | A | UFGS 33 52 43.14 Aviation Fuel Control Valves | Feb-2010 | N | New section | |
| Feb-2010 | A | UFGS 33 52 43.23 Aviation Fuel Pumps | Feb-2010 | N | New section | |
| Feb-2010 | A | UFGS 33 52 43.28 Filter Separator, Aviation Fueling System | Feb-2010 | N | New section | |
| Feb-2010 | N | UFGS 33 52 80 Liquid Fuels Pipeline Coating Systems | Feb-2010 | R | Section References (SRF) update | |
| Feb-2010 | N | UFGS 33 52 80 Liquid Fuels Pipeline Coating Systems | Feb-2010 | R | Section References (SRF) update | |
| Feb-2010 | N | UFGS 33 52 90.00 20 Welding for POL Service Piping | Feb-2010 | R | Section References (SRF) update; references to section UFGS 33 52 43.30 (formerly 15899) have been replaced by UFGS 33 08 53 AVIATION FUEL DISTRIBUTION SYSTEM START-UP | |
| Feb-2010 | N | UFGS 33 52 90.00 20 Welding for POL Service Piping | Feb-2010 | R | Section References (SRF) update: references to sections 15899 and 13004 have been replaced with UFGS 33 52 43.30 and UFGS 33 08 55 respectively |