Below is a listing of the Revisions and Changes made to UFGS Sections for each release. You can narrow the list by selecting a UFGS Release date from the drop-down and clicking 'Apply'.
KEY | PREPARING ACTIVITY (PA) | A Army | N Navy | F Air Force | S NASA [ARCHIVED] |
---|---|---|---|---|---|
ACTION | N New | R Revision | C Change | D Deletion |
Release | PA | UFGS Section | Date | Action | Change # | Nature of Change or Revision |
---|---|---|---|---|---|---|
Feb-2014 | S | UFGS 22 15 09.00 40 General Service Compressed-Air Systems Cleaning Procedures | Feb-2014 | R | Tri Annual Database Maintenance (TADM) completed | |
Feb-2014 | A | UFGS 23 00 00 Air Supply, Distribution, Ventilation, and Exhaust Systems | Aug-2010 | C | 2 | Minimum frame length when Duct Height Greater than 300 mm (12 inches) revised to 127 mm (5 inches) |
Feb-2014 | S | UFGS 23 05 15 Common Piping for HVAC | Feb-2014 | R | Tri Annual Database Maintenance (TADM) completed | |
Feb-2014 | A | UFGS 23 09 23 LonWorks Direct Digital Control for HVAC and Other Building Control Systems | May-2011 | C | 1 | QC Checklist in APPENDIX A made available in electronic format for use with this section at: http://www.wbdg.org/ccb/NAVGRAPH/graphtoc.pdf |
Feb-2014 | S | UFGS 23 22 13.35 40 Steam Traps | Feb-2014 | R | Tri Annual Database Maintenance (TADM) completed | |
Feb-2014 | S | UFGS 26 05 71.00 40 Low-Voltage Overcurrent Protective Devices | Feb-2014 | R | Tri Annual Database Maintenance (TADM) completed | |
Feb-2014 | N | UFGS 26 20 00 Interior Distribution System | Feb-2014 | R | Major revision | |
Feb-2014 | A | UFGS 26 55 53.00 10 Exterior Lighting Including Security and CCTV Applications | Oct-2007 | D | Superseded by UFGS 26 56 00 through unification Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
Feb-2014 | S | UFGS 28 33 00.00 40 Fuel-Gas Detection and Alarm | Feb-2014 | R | Tri Annual Database Maintenance (TADM) completed | |
Feb-2014 | N | UFGS 33 11 00 Water Utility Distribution Piping | Feb-2011 | C | 3 | Modified subparts 2.2.1.3, 3.1.3.2, 3.2.2, 3.2.3; added 3.2.2.1 and 3.2.2.2 |
Feb-2014 | A | UFGS 33 70 02.00 10 Electrical Distribution System, Underground | Nov-2008 | D | Superseded by UFGS 33 71 02 Underground Electrical Distribution through unification Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
Feb-2014 | N | UFGS 33 71 02 Underground Electrical Distribution | Feb-2014 | N | New; Superseding UFGS 33 71 02.00 20 Underground Electrical Distribution and UFGS 33 70 02.00 10 Electrical Distribution System, Underground | |
Feb-2014 | N | UFGS 33 71 02.00 20 Underground Electrical Distribution | Aug-2008 | D | Superseded by UFGS 33 71 02 Underground Electrical Distribution through unification Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
Nov-2013 | S | UFGS 01 33 00 Submittal Procedures | May-2011 | C | 3 | Section 26 12 19.20 was replaced by 26 12 21 SINGLE-PHASED PAD- MOUNTED TRANSFORMERS at Subpart 1.5.1.2 |
Nov-2013 | S | UFGS 01 78 24.00 20 Facility Data Workbook (FDW) | Aug-2012 | C | 1 | Revised note before part 1. |
Nov-2013 | A | UFGS 02 65 00 Underground Storage Tank Removal | Feb-2010 | C | 1 | Removed references to EM 200-1-3 |
Nov-2013 | A | UFGS 09 06 90 Schedules for Painting and Coating | May-2009 | C | 1 | Reformatting |
Nov-2013 | A | UFGS 09 30 00 Ceramic Tile, Quarry Tile, and Paver Tile | Aug-2010 | D | Superseded by UFGS 09 30 13 Ceramic Tiling. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
Nov-2013 | A | UFGS 09 30 13 Ceramic Tiling | Nov-2013 | N | Superseding UFGS 09 30 00 Ceramic Tile, Quarry Tile, and Paver Tile | |
Nov-2013 | A | UFGS 09 68 00 Carpeting | Nov-2013 | R | Revised section title to comply with MasterFormat. Routine section maintenance. | |
Nov-2013 | S | UFGS 12 32 00 Manufactured Wood Casework | Nov-2013 | R | Tri-Annual Database Maintenance (TADM) completed | |
Nov-2013 | S | UFGS 12 32 00 Manufactured Wood Casework | Nov-2013 | R | Tri-Annual Database Maintenance (TADM) completed | |
Nov-2013 | S | UFGS 21 21 00.00 40 Carbon-Dioxide Fire Extinguishing Systems | Nov-2013 | R | Tri-Annual Database Maintenance (TADM) completed | |
Nov-2013 | S | UFGS 21 21 00.00 40 Carbon-Dioxide Fire Extinguishing Systems | Nov-2013 | R | Tri-Annual Database Maintenance (TADM) completed | |
Nov-2013 | S | UFGS 22 05 83.63 Cured-In-Place Pipe (CIPP) Lining for Plumbing Applications | Nov-2013 | R | Tri-Annual Database Maintenance (TADM) completed | |
Nov-2013 | S | UFGS 22 05 83.63 Cured-In-Place Pipe (CIPP) Lining for Plumbing Applications | Nov-2013 | R | Tri-Annual Database Maintenance (TADM) completed | |
Nov-2013 | N | UFGS 23 64 10 Water Chillers, Vapor Compression Type | Aug-2008 | C | 1 | Added subparts 2.3 and 3.2; revised subparts 2.2.2.2, 2.4.1, 2.7.13. 2.7.16, 2.8.5, 2.17.5.1 and 3.5.2 |
Nov-2013 | N | UFGS 23 64 26 Chilled, Chilled-Hot, and Condenser Water Piping Systems | Aug-2009 | C | 1 | Added subparts 2.3 and 3.2; revised subparts 2.2.2.2, 2.4.1, 2.7.13. 2.7.16, 2.8.5, 2.17.5.1 and 3.5.2 |
Nov-2013 | N | UFGS 23 81 00.00 20 Unitary Air Conditioning Equipment | Nov-2009 | C | 1 | Revised subparts 2.2.1, 2.2.2, 2.3, 2.4, 2.4.1, 2.4.2, 2.5.1, 2.5.3, 2.8 and 3.2.4 |
Nov-2013 | S | UFGS 26 05 13.00 10 Medium-Voltage Cables | Nov-2013 | R | Tri-Annual Database Maintenance (TADM) completed | |
Nov-2013 | S | UFGS 26 05 13.00 10 Medium-Voltage Cables | Nov-2013 | R | Tri-Annual Database Maintenance (TADM) completed | |
Nov-2013 | S | UFGS 26 12 19.00 40 Pad-Mounted, Liquid-Filled Medium-Voltage Transformers | Feb-2011 | C | 1 | Section 26 12 19.20 was replaced by 26 12 21 SINGLE-PHASED PAD- MOUNTED TRANSFORMERS within the General Note |
Nov-2013 | N | UFGS 26 12 19.20 Single-Phase Pad-Mounted Transformers | Apr-2006 | D | Retired; Superseded by UFGS 26 12 21 Single-Phase Pad-Mounted Transformers. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
Nov-2013 | N | UFGS 26 12 21 Single-Phase Pad-Mounted Transformers | Nov-2013 | N | Superseding UFGS 26 12 19.20 SINGLE-PHASE PAD-MOUNTED TRANSFORMERS | |
Nov-2013 | N | UFGS 26 41 00 Lightning Protection System | Nov-2013 | N | Superseding UFGS 26 41 00.00 20 Lightning Protection System and UFGS 26 41 01.00 10 Lightning Protection System | |
Nov-2013 | N | UFGS 26 41 00.00 20 Lightning Protection System | Apr-2006 | D | Superseded by UFGS 26 41 00 Lightning Protection System. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
Nov-2013 | A | UFGS 26 41 01.00 10 Lightning Protection System | Nov-2008 | D | Superseded by UFGS 26 41 00 Lightning Protection System. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
Nov-2013 | A | UFGS 26 41 01.00 10 Lightning Protection System | Nov-2008 | D | Superseded by UFGS 26 41 00 Lightning Protection System. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
Nov-2013 | A | UFGS 26 41 01.00 10 Lightning Protection System | Nov-2008 | D | Superseded by UFGS 26 41 00 Lightning Protection System. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
Nov-2013 | A | UFGS 26 41 01.00 10 Lightning Protection System | Nov-2008 | D | Superseded by UFGS 26 41 00 Lightning Protection System. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
Nov-2013 | A | UFGS 27 15 19.00 10 Wire Line Data Transmission System | Apr-2006 | D | Superseded by UFGS 27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
Nov-2013 | A | UFGS 27 21 10.00 10 Fiber Optic Data Transmission System | Jul-2006 | D | Superseded by UFGS 27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
Nov-2013 | N | UFGS 31 23 00.00 20 Excavation and Fill | Feb-2011 | C | 1 | Revised subpart 1.6 and table in subpart 2.10 |
Nov-2013 | N | UFGS 31 62 19 Timber Piles | Jan-2008 | C | 1 | Revised subpart 2.1.4 |
Nov-2013 | N | UFGS 32 01 19.61 Sealing of Joints in Rigid Pavement | Apr-2006 | C | 1 | Revised notes before Part 1 and subparts 2.1.1 and 3.1.2.1. Deleted subparts 1.6.2.1 Hot-Poured Liquid Sealant and 2.1.1.2 Sealant, Joint, Jet- |
Nov-2013 | N | UFGS 32 10 00 [Pervious] Bituminous Concrete Pavement | Aug-2008 | C | 1 | Revised subparts 2.5 and 3.3.2.1 |
Nov-2013 | N | UFGS 32 12 17 Hot Mix Bituminous Pavement | Apr-2008 | C | 1 | Revised subparts 1.6.1, 2.2, 2.5.1, 2.5.2, 3.3, 3.5.2.2 and 3.5.2.3 |
Nov-2013 | N | UFGS 32 13 13.06 Portland Cement Concrete Pavement for Roads and Site Facilities | Nov-2011 | C | 1 | Added subparts 1.2, 2.1.1.2, 2.1.1.4 and 2.1.2; Revised subparts 1.4, 1.6.2, 2.1.1, 2.1.3, 2.1.3.1, 2.3, 3.3.7, 3.7.5.1, 3.7.5.2 and 3.7.7 |
Nov-2013 | N | UFGS 32 13 43 Pervious Concrete Paving | Nov-2011 | C | 1 | Revised subparts 1.3, 1.5.1 and 3.3.4 |
Nov-2013 | N | UFGS 33 05 23.19 Trenchless Excavation Using Microtunneling | Apr-2006 | C | 1 | Revised subparts 1.2, 1.3.1, 2.4 and 3.1.1 |
Nov-2013 | N | UFGS 33 11 00 Water Utility Distribution Piping | Feb-2011 | C | 2 | Revised subparts 2.1.2.7, 2.2.2.17, 3.1.2.2 and 3.2.2 |
Nov-2013 | N | UFGS 33 32 13.14 Packaged Sewage Lift Stations, Grinder Pump Type | Jan-2008 | C | 1 | Revised subpart 2.5.3 and 2.6.2.2 |
Nov-2013 | N | UFGS 33 52 90.00 20 Welding for POL Service Piping | Feb-2010 | C | 1 | Revised subpart 3.3 |
Nov-2013 | A | UFGS 33 82 33.00 10 Coaxial Cable Data Transmission System | Apr-2006 | D | Superseded by UFGS 27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
Nov-2013 | N | UFGS 46 25 14 Coalescing [or Vertical Tube] Oil-Water Separators | Feb-2011 | C | 1 | Revised subpart 3.2 |
Aug-2013 | A | UFGS 00 31 10 Metric Measurements | Apr-2006 | D | Section removed from UFGS Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
Aug-2013 | N | UFGS 01 14 00 Work Restrictions | Nov-2011 | C | 1 | Tailoring and changes for NAVFAC NW throughout |
Aug-2013 | A | UFGS 01 32 01.00 10 Project Schedule | Aug-2008 | C | 1 | Require use of Primavera P6 |
Aug-2013 | N | UFGS 01 33 29.00 20 Sustainable Requirements | Aug-2013 | N | NEW; Interim change to 01 33 29, LEED DOCUMENTATION, to include the Guiding Principles, for Navy-use only. | |
Aug-2013 | N | UFGS 01 35 26 Governmental Safety Requirements | Feb-2012 | C | 2 | Modified subparts 1.3,1.6.1, 3.1.3, 3.4; Removed "A" for accept from Submittal Items |
Aug-2013 | N | UFGS 01 57 19.00 20 Temporary Environmental Controls | Nov-2011 | C | 1 | Modified throughout. Correctly classified Universal Waste and Asbestos material, removed tailoring from ECATTS paragraph, changed Environmental Management Plan to Environmental Protection Plan throughout and moved to Part 1. |
Aug-2013 | N | UFGS 01 57 19.01 20 Supplemental Temporary Environmental Controls | Feb-2010 | C | 1 | Added requirements for NAVFAC NW, including Definitions and Part 3 paragraphs. |
Aug-2013 | A | UFGS 01 62 35 Recycled / Recovered / Biobased Materials | May-2013 | C | 1 | Additional biobased materials language |
Aug-2013 | N | UFGS 06 13 33 Pier Timberwork | Apr-2006 | C | 1 | Modified subpart 2.1.1.2 |
Aug-2013 | N | UFGS 07 52 00 Modified Bituminous Membrane Roofing | May-2012 | C | 1 | Modified note before Part 1, subparts 1.2, 1.7.1, 1.9.1, 1.12, 2.1 efg |
Aug-2013 | A | UFGS 07 84 00 Firestopping | May-2010 | C | 1 | Industry input |
Aug-2013 | N | UFGS 09 97 13.27 High Performance Coating for Steel Structures | Feb-2010 | C | 1 | Modified notes before Part 1 and in subpart 3.6 |
Aug-2013 | S | UFGS 21 13 00.00 40 Fire-Suppression Sprinkler Systems | Aug-2013 | R | Tri-Annual Database Maintenance (TADM) completed | |
Aug-2013 | A | UFGS 21 30 00 Fire Pumps | Apr-2008 | C | 1 | CCR 1147, fuel piping specified by NFPA 20 |
Aug-2013 | N | UFGS 26 13 01 Pad-Mounted Dead-Front Air Insulated Switchgear | Aug-2013 | N | NEW | |
Aug-2013 | N | UFGS 26 27 29 Marina Electrical Work | Apr-2006 | C | 1 | Modified subparts 2.2.3.2, 2.4.1, 2.14.3 (note) and 2.14.4 (note) |
Aug-2013 | N | UFGS 31 62 13.20 Precast/Prestressed Concrete Piles | Aug-2009 | C | 1 | Modified subparts 1.5 and 3.5 (notes) |
Aug-2013 | N | UFGS 33 24 00.00 20 [Extraction] [Monitoring] Wells | Apr-2006 | C | 1 | Modified subparts 2.1.1, 2.2.2, 2.9 and 3.9 |
Aug-2013 | N | UFGS 46 07 53.13 Packaged Wastewater Treatment Equipment, Aeration | Feb-2011 | C | 2 | Modified note before Part 1, subparts 1.4, 2.16, 2.6.1, 2.7.3.1 (d), 2.8.3.1 (b3), 2.8.3.2 (b3, d1), 2.8.3.3 (b3), 2.13.10, 2.16, 3.3.1.1, 3.3.5.9, 3.5.2, 3.7.2 3.7.2.3 |
Aug-2013 | N | UFGS 46 23 00 Grit Removal and Handling Equipment | Feb-2011 | C | 1 | Modified subparts 2.1.4.3, 2.1.6.2, 2.1.7.4, 2.1.10.1(b), 2.3.5(d), 2.6 |
May-2013 | A | UFGS 01 62 35 Recycled / Recovered / Biobased Materials | May-2013 | R | Revised Section Title from RECYCLED / RECOVERED MATERIALS. Also, added Biopreferred Fed | |
May-2013 | N | UFGS 03 45 00 Precast Architectural Concrete | Nov-2011 | C | 1 | Modified note before Part 1; added SD-07; modifed SD-11; modified subpart 1.4, 1.6, 1.7, 1.8.1, 1.9 (formerly 1.10), 3.9 and 3.16.1; deleted subparts 1.8.1.1, 1.8.1.2 and 1.9 |
May-2013 | N | UFGS 05 21 19 Open Web Steel Joist Framing | Jul-2007 | C | 1 | Modified subpart 2.2.1 |
May-2013 | N | UFGS 05 21 23 Steel Joist Girder Framing | Jul-2007 | C | 1 | modified subpart 2.2.1 |
May-2013 | N | UFGS 07 21 13 Board and Block Insulation | May-2011 | C | 1 | modified subpart 1.3 |
May-2013 | N | UFGS 07 21 16 Mineral Fiber Blanket Insulation | Nov-2011 | C | 1 | Modified subpart 1.3 |
May-2013 | N | UFGS 07 21 23 Loose Fill Thermal Insulation | May-2011 | C | 1 | Modified subpart 1.3 |
May-2013 | N | UFGS 07 22 00 Roof and Deck Insulation | Aug-2011 | C | 1 | Modified subpart 1.4.3 |
May-2013 | N | UFGS 07 42 63 Fabricated Wall Panel Assemblies | May-2011 | C | 1 | modified subpart 1.5.10 |
May-2013 | N | UFGS 07 57 13 Sprayed Polyurethane Foam (SPF) Roofing | May-2011 | C | 1 | modified subpart 1.4.6 |
May-2013 | N | UFGS 08 14 00 Wood Doors | Aug-2011 | C | 1 | Modified subpart1.3 |
May-2013 | N | UFGS 08 36 13 Sectional Overhead Doors | Aug-2011 | C | 1 | Modified subparts 2.2, 2.3, 2.4.1, 2.4.1.1, 2.4.3, 2.5.1, 2.6.4, 2.7 |
May-2013 | N | UFGS 09 23 00 Gypsum Plastering | Aug-2010 | C | 1 | modified subpart 1.3.2 |
May-2013 | N | UFGS 09 26 00 Veneer Plaster | May-2011 | C | 1 | Modified subpart 1.4 |
May-2013 | N | UFGS 09 29 00 Gypsum Board | May-2011 | C | 1 | Modified subpart 1.3 |
May-2013 | N | UFGS 09 64 00 Portable (Demountable) Wood Flooring | Aug-2010 | C | 1 | modified subpart 1.3 |
May-2013 | N | UFGS 09 64 66 Wood Athletic Flooring | Aug-2010 | C | 1 | modified subpart 1.3 |
May-2013 | N | UFGS 09 90 00 Paints and Coatings | May-2011 | C | 1 | modified subpart 1.4.4 |
May-2013 | N | UFGS 10 22 13 Wire Mesh Partitions | Aug-2010 | C | 1 | modified subpart 1.4 |
May-2013 | N | UFGS 10 22 26.13 Accordion Folding Partitions | Aug-2010 | C | 1 | modified subpart 1.3.4 |
May-2013 | N | UFGS 10 22 26.23 Coiling Partitions | Aug-2010 | C | 1 | modified subpart 1.4 |
May-2013 | N | UFGS 12 22 00 Curtains and Drapes | Aug-2010 | C | 1 | modified subpart 1.5 |
May-2013 | A | UFGS 14 21 23 Electric Traction Passenger Elevators | Feb-2009 | C | 1 | Updated references to sections and paragraphs of ASME A17.1/CSA B44 |
May-2013 | N | UFGS 22 00 00 Plumbing, General Purpose | Nov-2011 | C | 1 | modified subpart 2.1 |
May-2013 | A | UFGS 23 00 00 Air Supply, Distribution, Ventilation, and Exhaust Systems | Aug-2010 | C | 1 | Added the option for pneumatic or electric damper operator |