Export to CSV

Below is a listing of the Revisions and Changes made to UFGS Sections for each release. You can narrow the list by selecting a UFGS Release date from the drop-down and clicking 'Apply'.

KEYPREPARING ACTIVITY (PA)A ArmyN NavyF Air ForceS NASA [ARCHIVED]
ACTIONN NewR RevisionC ChangeD Deletion
Release PA UFGS Section Action Change # Nature of Change or Revision
May-2014 N UFGS 01 57 19.01 20 Supplemental Temporary Environmental Controls C 3 Modified subpart 3.1.1.1
May-2014 N UFGS 01 78 24.00 20 Facility Data Workbook (FDW) R Revised "eOMSI documents" to "eOMSI Manual", revised "eOMSI Facility data" to "eOMSI Facility Data Workbook" and revised throughout to coordinate requirements.
May-2014 A UFGS 03 11 13.00 10 Structural Cast-In-Place Concrete Forming R Major revision to comply with ICC IBC 2012
May-2014 A UFGS 03 11 19.00 Insulating Concrete Forming R Major revision to comply with ICC IBC 2012
May-2014 A UFGS 03 15 00.00 10 Concrete Accessories R Major revision to comply with ICC IBC 2012
May-2014 A UFGS 03 20 00.00 10 Concrete Reinforcing R Major revision to comply with ICC IBC 2012
May-2014 N UFGS 03 30 00 Cast-In-Place Concrete R Major revision to comply with IBC 2012
May-2014 A UFGS 03 30 00.00 10 Cast-In-Place Concrete R Major revision to comply with ICC IBC 2012
May-2014 A UFGS 03 30 53 Miscellaneous Cast-In-Place Concrete R Major revision to comply with ICC IBC 2012
May-2014 A UFGS 03 31 01.00 10 Cast-In-Place Structural Concrete for Civil Works R Major revision to comply with ICC IBC 2012
May-2014 A UFGS 03 35 00.00 10 Concrete Finishing R Major revision to comply with ICC IBC 2012
May-2014 A UFGS 03 39 00.00 10 Concrete Curing R Major revision to comply with ICC IBC 2012
May-2014 S UFGS 03 41 33 Precast Structural Pretensioned Concrete C 2 SRF update, changed 05 05 23 WELDING, STRUCTURAL to 05 05 23.16 STRUCTURAL WELDING
May-2014 S UFGS 03 47 13 Tilt-Up Concrete C 2 SRF update, changed 05 05 23 WELDING, STRUCTURAL to STRUCTURAL WELDING
May-2014 A UFGS 05 05 23 Welding, Structural D Superseded by UFGS 05 05 23.16 Structural Welding for compliance with MasterFormat. Also, major revision to comply with ICC IBC 2012.
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2014 A UFGS 05 05 23.13 10 Ultrasonic Inspection of Weldments R Major revision to comply with ICC IBC 2012
May-2014 A UFGS 05 05 23.16 Structural Welding N Superseding UFGS 05 05 23 Welding, Structural for compliance with MasterFormat. Section also updated to comply with ICC IBC 2012
May-2014 N UFGS 05 12 00 Structural Steel R Major revision to comply with IBC 2012
May-2014 A UFGS 05 50 14 Structural Metal Fabrications R Major revision to comply with ICC IBC 2012
May-2014 A UFGS 05 50 15 Civil Works Fabrications R Major revision to comply with ICC IBC 2012
May-2014 S UFGS 05 51 00 Metal Stairs C 1 SRF update, changed 05 05 23 WELDING, STRUCTURAL to 05 05 23.16 STRUCTURAL WELDING.
May-2014 S UFGS 05 52 00 Metal Railings C 3 SRF update, changed 05 05 23 WELDING, STRUCTURAL to STRUCTURAL WELDING
May-2014 A UFGS 07 05 23 Pressure Testing an Air Barrier System for Air Tightness N Superseding UFGS 07 08 27.00 10 Building Air Barrier System Testing for Commissioning
May-2014 A UFGS 07 08 27.00 10 Building Air Barrier System Testing for Commissioning D Superseded by UFGS 07 05 23 Pressure Testing an Air Barrier System for Air Tightness and UFGS 07 27 10.00 10 Building Air Barrier System.
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2014 A UFGS 07 27 10.00 10 Building Air Barrier System N Superseding UFGS 07 08 27.00 10 Building Air Barrier System Testing for Commissioning
May-2014 A UFGS 07 55 00 Protected Membrane Roofing (PMR) C 1 Energy efficiency requirements added
May-2014 N UFGS 08 34 16.20 Vertical Lift Fabric Doors R Major revision; state-of-the-art study to improve VLFD reliability, improve performance requirements and increase vendor competitiveness.
May-2014 N UFGS 08 53 00 Plastic Windows C 1 Modified subpart 1.6.3
May-2014 N UFGS 08 88 58 Air Traffic Control Tower Cab Glass N New section
May-2014 A UFGS 11 44 00 Food Cooking Equipment C 1 Energy efficiency requirements added
May-2014 S UFGS 28 05 26.00 40 Grounding and Bonding For Electronic Safety and Security C 1 SRF update, changed 05 05 23 WELDING, STRUCTURAL to 05 05 23.16 STRUCTURAL WELDING
May-2014 N UFGS 32 17 23.00 20 Pavement Markings C 1 Modified subpart 2.1 (note), 2.1.1 and 2.1.2.
May-2014 A UFGS 33 52 43 Aviation Fuel Distribution (Non-Hydrant) C 1 Clarified washer material requirements as noted in CCR 2605
May-2014 A UFGS 33 52 43.13 Aviation Fuel Piping C 1 Clarified washer material requirements as noted in CCR 2604
May-2014 A UFGS 35 01 43 Wire Rope for Gate Operating Devices D In combination with a major revision, section number changed for compliance with MasterFormat. Superseded by UFGS 35 01 70.13 Wire Rope for Gate Operating Devices.
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2014 A UFGS 35 01 70.13 Wire Rope for Gate Operating Devices N Major revision of and superseding UFGS 35 01 43 Wire Rope for Gate Operating Devices
May-2014 A UFGS 35 05 40.14 10 Hydraulic Power Systems for Civil Works Structures N Major revision of and superseding UFGS 41 24 27.00 10 Hydraulic Power Systems for Civil Works Structures
May-2014 A UFGS 35 05 40.17 Self-Lubricated Materials, Fabrication, Handling, and Assembly N New UFGS section
May-2014 S UFGS 40 17 30.00 40 Welding General Piping C 2 SRF update, changed 05 05 23 WELDING, STRUCTURAL to 05 05 23.16 STRUCTURAL WELDING
May-2014 A UFGS 41 24 27.00 10 Hydraulic Power Systems for Civil Works Structures D In combination with a major revision, section number changed for compliance with MasterFormat. Superseded by UFGS 35 05 40.14 10 Hydraulic Power Systems for Civil Works Structures.
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2014 A UFGS 48 06 15 Turbine Oil N Full review, updates and superseding UFGS 48 13 19.00 10 Turbine Oil
May-2014 A UFGS 48 13 19.00 10 Turbine Oil D Superseded by UFGS 48 06 15 Turbine Oil.
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2014 N UFGS 00 22 13 Supplementary Instructions to Bidders D Superseded by UFGS 00 22 13.00 20 Supplementary Instructions to Offerors
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2014 N UFGS 00 73 01 Supplementary Conditions for Guantanamo Bay Projects C 1 Deleted subpart 1.3.1.3 "Waiver for Workers' Compensation"
Feb-2014 A UFGS 01 42 15 Metric Measurements N New; Revision of UFGS 00 31 10 Metric Measurements which was deleted August 2013. Section is being reinstated and has been renumbered.
Feb-2014 N UFGS 01 57 19.01 20 Supplemental Temporary Environmental Controls C 2 Modified note before Part 1, Part 1, subparts 1.3, 1.4.1, 1.4.1.2,1.4.1.2.2, 1.4.1.3, 1.4.1.4, 1.4.1.5, 1.4.1.6.1, 1.4.1.6.6, 1.4.1.7, 1.6.5.2.1 and 1.6.5.2.2
Feb-2014 N UFGS 07 21 23 Loose Fill Thermal Insulation C 2 Modified subpart 2.1.1
Feb-2014 N UFGS 08 11 13 Steel Doors and Frames C 1 Modified subpart 2.3
Feb-2014 A UFGS 09 68 00 Carpeting C 1 Allowed for use of triexta (PTT)
Feb-2014 S UFGS 12 48 13 Entrance Floor Mats and Frames N Superseding UFGS 12 48 13.13 Entrance Floor Mats; title and section number changed; updated entire section through unification; Tri Annual Database Maintenance (TADM) completed including incorporating CCRs
Feb-2014 S UFGS 12 48 13.13 Entrance Floor Mats D Superseded by UFGS 12 48 13 Entrance Floor Mats and Frames
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2014 S UFGS 22 15 09.00 40 General Service Compressed-Air Systems Cleaning Procedures R Tri Annual Database Maintenance (TADM) completed
Feb-2014 A UFGS 23 00 00 Air Supply, Distribution, Ventilation, and Exhaust Systems C 2 Minimum frame length when Duct Height Greater than 300 mm (12 inches) revised to 127 mm (5 inches)
Feb-2014 S UFGS 23 05 15 Common Piping for HVAC R Tri Annual Database Maintenance (TADM) completed
Feb-2014 A UFGS 23 09 23 LonWorks Direct Digital Control for HVAC and Other Building Control Systems C 1 QC Checklist in APPENDIX A made available in electronic format for use with this section at: http://www.wbdg.org/ccb/NAVGRAPH/graphtoc.pdf
Feb-2014 S UFGS 23 22 13.35 40 Steam Traps R Tri Annual Database Maintenance (TADM) completed
Feb-2014 S UFGS 26 05 71.00 40 Low-Voltage Overcurrent Protective Devices R Tri Annual Database Maintenance (TADM) completed
Feb-2014 N UFGS 26 20 00 Interior Distribution System R Major revision
Feb-2014 A UFGS 26 55 53.00 10 Exterior Lighting Including Security and CCTV Applications D Superseded by UFGS 26 56 00 through unification
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2014 S UFGS 28 33 00.00 40 Fuel-Gas Detection and Alarm R Tri Annual Database Maintenance (TADM) completed
Feb-2014 N UFGS 33 11 00 Water Utility Distribution Piping C 3 Modified subparts 2.2.1.3, 3.1.3.2, 3.2.2, 3.2.3; added 3.2.2.1 and 3.2.2.2
Feb-2014 A UFGS 33 70 02.00 10 Electrical Distribution System, Underground D Superseded by UFGS 33 71 02 Underground Electrical Distribution through unification
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2014 N UFGS 33 71 02 Underground Electrical Distribution N New; Superseding UFGS 33 71 02.00 20 Underground Electrical Distribution and UFGS 33 70 02.00 10 Electrical Distribution System, Underground
Feb-2014 N UFGS 33 71 02.00 20 Underground Electrical Distribution D Superseded by UFGS 33 71 02 Underground Electrical Distribution through unification
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2013 S UFGS 01 33 00 Submittal Procedures C 3 Section 26 12 19.20 was replaced by 26 12 21 SINGLE-PHASED PAD- MOUNTED TRANSFORMERS at Subpart 1.5.1.2
Nov-2013 S UFGS 01 78 24.00 20 Facility Data Workbook (FDW) C 1 Revised note before part 1.
Nov-2013 A UFGS 02 65 00 Underground Storage Tank Removal C 1 Removed references to EM 200-1-3
Nov-2013 A UFGS 09 06 90 Schedules for Painting and Coating C 1 Reformatting
Nov-2013 A UFGS 09 30 00 Ceramic Tile, Quarry Tile, and Paver Tile D Superseded by UFGS 09 30 13 Ceramic Tiling.
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2013 A UFGS 09 30 13 Ceramic Tiling N Superseding UFGS 09 30 00 Ceramic Tile, Quarry Tile, and Paver Tile
Nov-2013 A UFGS 09 68 00 Carpeting R Revised section title to comply with MasterFormat. Routine section maintenance.
Nov-2013 S UFGS 12 32 00 Manufactured Wood Casework R Tri-Annual Database Maintenance (TADM) completed
Nov-2013 S UFGS 12 32 00 Manufactured Wood Casework R Tri-Annual Database Maintenance (TADM) completed
Nov-2013 S UFGS 21 21 00.00 40 Carbon-Dioxide Fire Extinguishing Systems R Tri-Annual Database Maintenance (TADM) completed
Nov-2013 S UFGS 21 21 00.00 40 Carbon-Dioxide Fire Extinguishing Systems R Tri-Annual Database Maintenance (TADM) completed
Nov-2013 S UFGS 22 05 83.63 Cured-In-Place Pipe (CIPP) Lining for Plumbing Applications R Tri-Annual Database Maintenance (TADM) completed
Nov-2013 S UFGS 22 05 83.63 Cured-In-Place Pipe (CIPP) Lining for Plumbing Applications R Tri-Annual Database Maintenance (TADM) completed
Nov-2013 N UFGS 23 64 10 Water Chillers, Vapor Compression Type C 1 Added subparts 2.3 and 3.2; revised subparts 2.2.2.2, 2.4.1, 2.7.13. 2.7.16, 2.8.5, 2.17.5.1 and 3.5.2
Nov-2013 N UFGS 23 64 26 Chilled, Chilled-Hot, and Condenser Water Piping Systems C 1 Added subparts 2.3 and 3.2; revised subparts 2.2.2.2, 2.4.1, 2.7.13. 2.7.16, 2.8.5, 2.17.5.1 and 3.5.2
Nov-2013 N UFGS 23 81 00.00 20 Unitary Air Conditioning Equipment C 1 Revised subparts 2.2.1, 2.2.2, 2.3, 2.4, 2.4.1, 2.4.2, 2.5.1, 2.5.3, 2.8 and 3.2.4
Nov-2013 S UFGS 26 05 13.00 10 Medium-Voltage Cables R Tri-Annual Database Maintenance (TADM) completed
Nov-2013 S UFGS 26 05 13.00 10 Medium-Voltage Cables R Tri-Annual Database Maintenance (TADM) completed
Nov-2013 S UFGS 26 12 19.00 40 Pad-Mounted, Liquid-Filled Medium-Voltage Transformers C 1 Section 26 12 19.20 was replaced by 26 12 21 SINGLE-PHASED PAD- MOUNTED TRANSFORMERS within the General Note
Nov-2013 N UFGS 26 12 19.20 Single-Phase Pad-Mounted Transformers D Retired; Superseded by UFGS 26 12 21 Single-Phase Pad-Mounted Transformers.
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2013 N UFGS 26 12 21 Single-Phase Pad-Mounted Transformers N Superseding UFGS 26 12 19.20 SINGLE-PHASE PAD-MOUNTED TRANSFORMERS
Nov-2013 N UFGS 26 41 00 Lightning Protection System N Superseding UFGS 26 41 00.00 20 Lightning Protection System and UFGS 26 41 01.00 10 Lightning Protection System
Nov-2013 N UFGS 26 41 00.00 20 Lightning Protection System D Superseded by UFGS 26 41 00 Lightning Protection System.
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2013 A UFGS 26 41 01.00 10 Lightning Protection System D Superseded by UFGS 26 41 00 Lightning Protection System.
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2013 A UFGS 26 41 01.00 10 Lightning Protection System D Superseded by UFGS 26 41 00 Lightning Protection System.
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2013 A UFGS 26 41 01.00 10 Lightning Protection System D Superseded by UFGS 26 41 00 Lightning Protection System.
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2013 A UFGS 26 41 01.00 10 Lightning Protection System D Superseded by UFGS 26 41 00 Lightning Protection System.
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2013 A UFGS 27 15 19.00 10 Wire Line Data Transmission System D Superseded by UFGS 27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM.
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2013 A UFGS 27 21 10.00 10 Fiber Optic Data Transmission System D Superseded by UFGS 27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM.
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2013 N UFGS 31 23 00.00 20 Excavation and Fill C 1 Revised subpart 1.6 and table in subpart 2.10
Nov-2013 N UFGS 31 62 19 Timber Piles C 1 Revised subpart 2.1.4
Nov-2013 N UFGS 32 01 19.61 Sealing of Joints in Rigid Pavement C 1 Revised notes before Part 1 and subparts 2.1.1 and 3.1.2.1. Deleted subparts 1.6.2.1 Hot-Poured Liquid Sealant and 2.1.1.2 Sealant, Joint, Jet-
Nov-2013 N UFGS 32 10 00 [Pervious] Bituminous Concrete Pavement C 1 Revised subparts 2.5 and 3.3.2.1
Nov-2013 N UFGS 32 12 17 Hot Mix Bituminous Pavement C 1 Revised subparts 1.6.1, 2.2, 2.5.1, 2.5.2, 3.3, 3.5.2.2 and 3.5.2.3
Nov-2013 N UFGS 32 13 13.06 Portland Cement Concrete Pavement for Roads and Site Facilities C 1 Added subparts 1.2, 2.1.1.2, 2.1.1.4 and 2.1.2; Revised subparts 1.4, 1.6.2, 2.1.1, 2.1.3, 2.1.3.1, 2.3, 3.3.7, 3.7.5.1, 3.7.5.2 and 3.7.7
Nov-2013 N UFGS 32 13 43 Pervious Concrete Paving C 1 Revised subparts 1.3, 1.5.1 and 3.3.4