Status
Retired / Superseded
Publish Date
Archived / Rescinded Date
Change Notice

<p>Superseded by UFGS 07 05 23 Pressure Testing an Air Barrier System for Air Tightness and UFGS 07 27 10.00 10 Building Air Barrier System</p>

Spec. Division
07 - Thermal and Moisture Protection

History: Below is a listing of the Revisions and Changes made to this UFGS.

KEYPREPARING ACTIVITY (PA)A ArmyN NavyF Air ForceS NASA [ARCHIVED]
ACTIONN NewR RevisionC ChangeD Deletion
Release PA Action Change # Nature of Change or Revision
May-2014 A D Superseded by UFGS 07 05 23 Pressure Testing an Air Barrier System for Air Tightness and UFGS 07 27 10.00 10 Building Air Barrier System. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2013 A N Superseding UFGS 07 27 00.45 10 Building Air Barrier System