Below is a listing of the Revisions and Changes made to UFGS Sections for each release. You can narrow the list by selecting a UFGS Release date from the drop-down and clicking 'Apply'.
KEY | PREPARING ACTIVITY (PA) | A Army | N Navy | F Air Force | S NASA [ARCHIVED] |
---|---|---|---|---|---|
ACTION | N New | R Revision | C Change | D Deletion |
Release | PA | UFGS Section | Date | Action | Change # | Nature of Change or Revision |
---|---|---|---|---|---|---|
Nov-2016 | A | UFGS 01 45 00.15 10 Resident Management System Contractor Mode (RMS CM) | Nov-2016 | N | Superseding UFGS 01 45 00.10 10 Quality Control System (QCS); Total review and update. | |
Nov-2016 | A | UFGS 02 83 19.00 10 Lead Based Paint Hazard Abatement, Target Housing and Child Occupied Facilities | Feb-2010 | D | Superseded by UFGS 02 83 19.13 10 Lead-Based Paint Abatement; Nontechnical number and title change. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
Nov-2016 | A | UFGS 02 83 19.13 10 Lead-Based Paint Abatement | Feb-2010 | R | Superseding UFGS 02 83 19.00 10 Lead Based Pain Hazard Abatement, Target Housing and Child Occupied Facilities; Nontechnical Number and Title Revision; Did not change Section date. | |
Nov-2016 | N | UFGS 06 13 33 Pier Timberwork | Nov-2016 | R | Revised to address changes in preservative treatments for Pier Timberwork. | |
Nov-2016 | A | UFGS 06 17 19 Cross-Laminated Timber | Nov-2016 | N | New Section | |
Nov-2016 | N | UFGS 07 31 13 Asphalt Shingles | Aug-2016 | C | 1 | In response to CCR #5002, added reference to ASTM D7158/D7158M for Class H roof in paragraph 2.2.1 "Shingles." |
Nov-2016 | A | UFGS 09 06 00 Schedules for Finishes | May-2009 | R | Superseding UFGS 09 06 90 Schedules for Painting and Coating; Nontechnical Number and Title Revision; Did not change Section date. | |
Nov-2016 | A | UFGS 09 06 90 Schedules for Painting and Coating | May-2009 | D | Superseded by UFGS 09 06 00 Schedules for Finishes; Nontechnical number and title change. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
Nov-2016 | A | UFGS 09 65 00 Resilient Flooring | Aug-2010 | C | 2 | In response to CCR 4916, Luxury Vinyl Tile added. |
Nov-2016 | N | UFGS 09 97 23.17 Corrosion Inhibitor Coating of Concrete Structures | Aug-2016 | C | 1 | Paragraphs "Penetrating Vapor Phase Corrosion Inhibitor" and "Surface Sealant' were revised to correct the product technical descriptions. |
Nov-2016 | S | UFGS 12 31 00 Manufactured Metal Casework | Nov-2014 | C | 2 | Replaced 09 06 90 SCHEDULES FOR PAINTING AND COATING with 09 06 00 SCHEDULES FOR FINISHES in Subpart 2.8 COLOR, TEXTURE, AND PATTERN. |
Nov-2016 | S | UFGS 12 34 00 Manufactured Plastic Casework | Nov-2014 | C | 2 | Replaced 09 06 90 SCHEDULES FOR PAINTING AND COATING with 09 06 00 SCHEDULES FOR FINISHES in Subpart 2.3.2 Color, Texture, and Pattern. |
Nov-2016 | S | UFGS 12 36 00 Countertops | Aug-2016 | C | 1 | Replaced 09 06 90 SCHEDULES FOR PAINTING AND COATING with 09 06 00 SCHEDULES FOR FINISHES in Subpart 2.3.2 Color, Texture, and Pattern. |
Nov-2016 | S | UFGS 12 48 13 Entrance Floor Mats and Frames | Feb-2014 | C | 3 | Replaced 09 06 90 SCHEDULES FOR PAINTING AND COATING with 09 06 00 SCHEDULES FOR FINISHES in Subpart 2.4 COLOR AND SIZE. |
Nov-2016 | S | UFGS 22 15 09.00 40 General Service Compressed-Air Systems Cleaning Procedures | Nov-2016 | R | Tri-Annual Database Maintenance (TADM) completed | |
Nov-2016 | N | UFGS 23 64 00 Packaged Water Chillers, Absorption Type | Nov-2016 | R | Complete revision. | |
Nov-2016 | N | UFGS 23 64 10 Water Chillers, Vapor Compression Type | Nov-2016 | R | Complete revision. | |
Nov-2016 | N | UFGS 23 65 00 Cooling Towers and Remote Evaporatively-Cooled Condensers | Nov-2016 | R | Title changed from Cooling Towers; Complete review and update concerning cooling towers and remote evaporatively cooled condensers. | |
Nov-2016 | N | UFGS 26 51 00 Interior Lighting | May-2016 | C | 1 | Changed LED light fixtures, light sources and drivers to a 5 year warranty to meet current industry standards. |
Nov-2016 | A | UFGS 31 11 00 Clearing and Grubbing | Aug-2008 | C | 1 | Added herbicide requirements. |
Nov-2016 | N | UFGS 31 62 19.13 Timber Marine Piles | Nov-2016 | R | Title changed from Wood Marine Piles; Revised to address changes in preservative treatments and basis of bids for Timber Marine Piles. | |
Nov-2016 | A | UFGS 32 01 11.51 Rubber and Paint Removal From Airfield Pavements | May-2016 | C | 1 | Clarified sandblasting requirements. |
Nov-2016 | S | UFGS 32 31 13 Chain Link Fences and Gates | Nov-2016 | R | Tri-Annual Database Maintenance (TADM) completed | |
Oct-2016 | N | UFGS 09 97 13.27 High Performance Coating for Steel Structures | Oct-2016 | R | INTERIM RELEASE: It was recently brought to our attention that the February 2016 revision of this section contained performance requirements that have been met by only one supplier for the entire paint system. This revision restores the February 2010, Change 1 version that provides for a competitive product. |
|
Aug-2016 | N | UFGS 01 35 26 Governmental Safety Requirements | Nov-2015 | C | 2 | Changed requirements for portable ionizing radiation equipment. |
Aug-2016 | A | UFGS 01 45 00.10 10 Quality Control System (QCS) | Feb-2010 | C | 1 | Update minimum QCS System Requirements, compliance with plain language requirements. |
Aug-2016 | N | UFGS 01 57 19 Temporary Environmental Controls | Nov-2015 | C | 1 | Fixed bracketed items and tailoring. |
Aug-2016 | N | UFGS 01 57 19.01 20 Supplemental Temporary Environmental Controls | Nov-2015 | C | 1 | Changed NAVFAC NW Installation's notes, and related information, for Hazardous Waste Management. |
Aug-2016 | S | UFGS 01 91 00.00 40 Commissioning | Nov-2012 | D | Replaced by UFGS Section 01 91 00.15 Total Building Commissioning (Preparing Activity: USACE). Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
Aug-2016 | S | UFGS 03 47 13 Tilt-Up Concrete | Aug-2016 | R | Tri-Annual Database Maintenance (TADM) completed | |
Aug-2016 | S | UFGS 03 47 13 Tilt-Up Concrete | Aug-2016 | R | Tri-Annual Database Maintenance process, which includes updating for Imperative Language, CSI-UFC Section Format, and cleaning up the Submittal Article; no technical content changes have been made | |
Aug-2016 | N | UFGS 06 10 00 Rough Carpentry | Aug-2016 | R | Alignment with Federal and DoD sustainability requirements for tracking and reporting | |
Aug-2016 | S | UFGS 06 18 00 Glued-Laminated Construction | Aug-2016 | R | Tri-Annual Database Maintenance (TADM) completed | |
Aug-2016 | S | UFGS 06 18 00 Glued-Laminated Construction | Aug-2016 | R | Tri-Annual Database Maintenance (TADM) completed | |
Aug-2016 | N | UFGS 06 20 00 Finish Carpentry | Aug-2016 | R | Alignment with Federal and DoD sustainability requirements for tracking and reporting | |
Aug-2016 | N | UFGS 07 31 13 Asphalt Shingles | Aug-2016 | R | Alignment with Federal and DoD sustainability requirements for tracking and reporting | |
Aug-2016 | N | UFGS 07 61 14.00 20 Steel Standing Seam Roofing | Aug-2016 | R | Alignment with Federal and DoD sustainability requirements for tracking and reporting | |
Aug-2016 | N | UFGS 07 61 15.00 20 Aluminum Standing Seam Roofing | Aug-2016 | R | Alignment with Federal and DoD sustainability requirements for tracking and reporting | |
Aug-2016 | N | UFGS 07 92 00 Joint Sealants | Aug-2016 | R | Alignment with Federal and DoD sustainability requirements for tracking and reporting | |
Aug-2016 | N | UFGS 08 14 00 Wood Doors | Aug-2016 | R | Alignment with Federal and DoD sustainability requirements for tracking and reporting | |
Aug-2016 | N | UFGS 09 23 00 Gypsum Plastering | Aug-2016 | R | Alignment with Federal and DoD sustainability requirements for tracking and reporting | |
Aug-2016 | N | UFGS 09 26 00 Veneer Plaster | Aug-2016 | R | Alignment with Federal and DoD sustainability requirements for tracking and reporting | |
Aug-2016 | N | UFGS 09 29 00 Gypsum Board | Aug-2016 | R | Alignment with Federal and DoD sustainability requirements for tracking and reporting | |
Aug-2016 | A | UFGS 09 35 16 Chemical-Resistant Quarry Tiling | Aug-2016 | R | Alignment with Federal and DoD sustainability requirements for tracking and reporting | |
Aug-2016 | N | UFGS 09 64 00 Portable (Demountable) Wood Flooring | Aug-2016 | R | Alignment with Federal and DoD sustainability requirements for tracking and reporting | |
Aug-2016 | A | UFGS 09 64 23 Wood Parquet Flooring | Aug-2016 | R | Alignment with Federal and DoD sustainability requirements for tracking and reporting | |
Aug-2016 | A | UFGS 09 64 29 Wood Strip and Plank Flooring | Aug-2016 | R | Alignment with Federal and DoD sustainability requirements for tracking and reporting | |
Aug-2016 | N | UFGS 09 64 66 Wood Athletic Flooring | Aug-2016 | R | Alignment with Federal and DoD sustainability requirements for tracking and reporting | |
Aug-2016 | A | UFGS 09 65 66 Resilient Athletic Flooring | Aug-2016 | R | Alignment with Federal and DoD sustainability requirements for tracking and reporting | |
Aug-2016 | A | UFGS 09 66 13 Portland Cement Terrazzo Flooring | Aug-2016 | R | Alignment with Federal and DoD sustainability requirements for tracking and reporting | |
Aug-2016 | A | UFGS 09 66 16 Terrazzo Floor Tile | Aug-2016 | R | Alignment with Federal and DoD sustainability requirements for tracking and reporting | |
Aug-2016 | A | UFGS 09 66 23 Resinous Matrix Terrazzo Flooring | Aug-2016 | R | Alignment with Federal and DoD sustainability requirements for tracking and reporting | |
Aug-2016 | A | UFGS 09 67 23.14 Chemical Resistant Resinous Flooring | Aug-2016 | R | Section title changed from CHEMICAL RESISTIVE RESINOUS FLOORING. Alignment with Federal and DoD sustainability requirements for tracking and reporting | |
Aug-2016 | A | UFGS 09 68 00 Carpeting | Aug-2016 | R | Alignment with Federal and DoD sustainability requirements for tracking and reporting | |
Aug-2016 | A | UFGS 09 83 13 Acoustical Wall Coating | Aug-2010 | D | Superseded by UFGS 09 84 20 Acoustical Wall Panels. Section number and title revision. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
Aug-2016 | A | UFGS 09 84 20 Acoustical Wall Panels | Aug-2016 | N | Superseding UFGS 09 83 13 Acoustical Wall Coating with Section Number and Title revision; Alignment with Federal and DoD sustainability requirements for tracking and reporting. | |
Aug-2016 | N | UFGS 09 97 23.17 Corrosion Inhibitor Coating of Concrete Structures | Aug-2016 | N | New section | |
Aug-2016 | N | UFGS 10 22 13 Wire Mesh Partitions | Aug-2016 | R | Alignment with Federal and DoD sustainability requirements for tracking and reporting | |
Aug-2016 | N | UFGS 10 22 26.13 Accordion Folding Partitions | Aug-2016 | R | Alignment with Federal and DoD sustainability requirements for tracking and reporting | |
Aug-2016 | N | UFGS 10 22 26.23 Coiling Partitions | Aug-2016 | R | Alignment with Federal and DoD sustainability requirements for tracking and reporting | |
Aug-2016 | A | UFGS 10 22 43 Sliding Partitions | Aug-2016 | R | Alignment with Federal and DoD sustainability requirements for tracking and reporting | |
Aug-2016 | N | UFGS 12 22 00 Curtains and Drapes | Aug-2016 | R | Alignment with Federal and DoD sustainability requirements for tracking and reporting | |
Aug-2016 | A | UFGS 12 35 70 Healthcare Casework | Aug-2016 | R | Alignment with Federal and DoD sustainability requirements for tracking and reporting | |
Aug-2016 | S | UFGS 12 36 00 Countertops | Aug-2016 | R | Tri-Annual Database Maintenance (TADM) completed | |
Aug-2016 | S | UFGS 12 36 00 Countertops | Aug-2016 | R | Tri-Annual Database Maintenance (TADM) completed | |
Aug-2016 | S | UFGS 21 13 26.00 40 Deluge Fire-Suppression Sprinkler Systems | Aug-2016 | R | Tri-Annual Database Maintenance (TADM) completed | |
Aug-2016 | S | UFGS 21 13 26.00 40 Deluge Fire-Suppression Sprinkler Systems | Aug-2016 | R | Tri-Annual Database Maintenance (TADM) completed | |
Aug-2016 | S | UFGS 22 07 19.00 40 Plumbing Piping Insulation | Aug-2016 | R | Tri-Annual Database Maintenance (TADM) completed | |
Aug-2016 | S | UFGS 22 07 19.00 40 Plumbing Piping Insulation | Aug-2016 | R | Tri-Annual Database Maintenance (TADM) completed | |
Aug-2016 | S | UFGS 26 05 00.00 40 Common Work Results for Electrical | Aug-2016 | R | Tri-Annual Database Maintenance (TADM) completed | |
Aug-2016 | S | UFGS 26 05 00.00 40 Common Work Results for Electrical | Aug-2016 | R | Tri-Annual Database Maintenance (TADM) which consists of updating of Section Format, imperative language and formatting review, and verification of all reports and spelling. | |
Aug-2016 | S | UFGS 26 05 00.00 40 Common Work Results for Electrical | Aug-2016 | R | Tri-Annual Database Maintenance (TADM) completed | |
Aug-2016 | S | UFGS 26 05 00.00 40 Common Work Results for Electrical | Aug-2016 | R | Tri-Annual Database Maintenance (TADM) completed | |
Aug-2016 | S | UFGS 26 09 23.00 40 Lighting Control Devices | Aug-2016 | R | Tri-Annual Database Maintenance (TADM) which consists of updating of Section Format, imperative language and formatting review, and verification of all reports and spelling. | |
Aug-2016 | S | UFGS 26 09 23.00 40 Lighting Control Devices | Aug-2016 | R | Tri-Annual Database Maintenance (TADM) completed | |
Aug-2016 | S | UFGS 26 09 23.00 40 Lighting Control Devices | Aug-2016 | R | Tri-Annual Database Maintenance (TADM) completed | |
Aug-2016 | S | UFGS 26 18 23.00 40 Medium-Voltage Surge Arresters | Aug-2016 | R | Tri-Annual Database Maintenance (TADM) which consists of updating of Section Format, imperative language and formatting review, and verification of all reports and spelling. | |
Aug-2016 | S | UFGS 26 18 23.00 40 Medium-Voltage Surge Arresters | Aug-2016 | R | Tri-Annual Database Maintenance (TADM) completed | |
Aug-2016 | S | UFGS 26 18 23.00 40 Medium-Voltage Surge Arresters | Aug-2016 | R | Tri-Annual Database Maintenance (TADM) completed | |
Aug-2016 | S | UFGS 26 24 16.00 40 Panelboards | Aug-2016 | R | Tri-Annual Database Maintenance (TADM) which consists of updating of Section Format, imperative language and formatting review, and verification of all reports and spelling. | |
Aug-2016 | S | UFGS 26 24 16.00 40 Panelboards | Aug-2016 | R | Tri-Annual Database Maintenance (TADM) completed | |
Aug-2016 | S | UFGS 26 24 16.00 40 Panelboards | Aug-2016 | R | Tri-Annual Database Maintenance (TADM) completed | |
Aug-2016 | S | UFGS 26 35 33.00 40 Power Factor Correction Equipment | Aug-2016 | R | Tri-Annual Database Maintenance (TADM) completed | |
Aug-2016 | S | UFGS 26 35 33.00 40 Power Factor Correction Equipment | Aug-2016 | R | Tri-Annual Database Maintenance (TADM) completed | |
Aug-2016 | S | UFGS 26 35 33.00 40 Power Factor Correction Equipment | Aug-2016 | R | Tri-Annual Database Maintenance (TADM) which consists of updating of Section Format, imperative language and formatting review, and verification of all reports and spelling. | |
Aug-2016 | S | UFGS 28 05 26.00 40 Grounding and Bonding for Electrical Systems | Aug-2016 | R | Tri-Annual Database Maintenance (TADM) completed | |
Aug-2016 | S | UFGS 28 05 26.00 40 Grounding and Bonding for Electrical Systems | Aug-2016 | R | Tri-Annual Database Maintenance (TADM) completed | |
Aug-2016 | S | UFGS 28 05 26.00 40 Grounding and Bonding for Electrical Systems | Aug-2016 | R | Tri-Annual Database Maintenance (TADM) which consists of updating of Section Format, imperative language and formatting review, and verification of all reports and spelling. Title changed from Grounding and Bonding for Electronic Safety and Security to Grounding and Bonding for Electrical Systems. | |
Aug-2016 | N | UFGS 31 31 16.13 Chemical Termite Control | Aug-2016 | R | Revised submittals, updated format and addressed the 26 comments in CCR #4559. Preparing Activity changed from USACE to NAVFAC | |
Aug-2016 | A | UFGS 32 01 11.52 Runway Rubber Removal | Aug-2008 | D | Superseded by UFGS 32 01 11.51 Rubber and Paint Removal from Airfield Pavements. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
Aug-2016 | N | UFGS 32 01 13.00 20 Emulsified Asphalt Seal Coats [with] [without] Aggregate | Feb-2012 | D | UFGS 32 01 13.63 Gilsonite Modified Asphalt Emulsion Seal Coats supersedes portions of this UFGS section. The remainder of content within this UFGS section also exists in UFGS 32 01 13 Bituminous Seal and Fog Coats; therefore it is not necessary to maintain this UFGS section any longer. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
Aug-2016 | N | UFGS 32 01 13.63 Gilsonite Modified Asphalt Emulsion Seal Coats | Feb-2016 | C | 1 | Proprietary language has been removed from this specification. |
Aug-2016 | A | UFGS 32 17 23 Pavement Markings | Aug-2016 | N | Superseding agency specific UFGS 32 17 23.00 20 Pavement Markings and UFGS 32-17 24.00 10 Pavement Markings | |
Aug-2016 | A | UFGS 32 17 23.00 20 Pavement Markings | Apr-2006 | D | Unified with UFGS 32 17 24.00 10 and Superseded by new UFGS 32 17 23 Pavement Markings (Preparing Activity USACE) Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
Aug-2016 | A | UFGS 32 17 24.00 10 Pavement Markings | Apr-2008 | D | Unified with UFGS 32 17 23.00 20 and Superseded by new UFGS 32 17 23 Pavement Markings Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
Aug-2016 | N | UFGS 33 01 30.16 TV Inspection of Sewer Lines | Aug-2016 | N | New section | |
Aug-2016 | N | UFGS 33 01 30.72 Relining Sewers | May-2016 | C | 1 | Added section references referring to UFGS Section 33 01 30.16 TV Inspection of Sewer Pipelines |
Aug-2016 | N | UFGS 33 05 23 Trenchless Utility Installation | Aug-2015 | C | 2 | Added section references referring to UFGS Section 33 01 30.16 TV Inspection of Sewer Pipelines |
Aug-2016 | A | UFGS 33 20 00 Water Wells | Apr-2008 | C | 1 | Compliance with plain language requirements. |
Aug-2016 | N | UFGS 33 32 13.14 Packaged Sewage Lift Stations, Grinder Pump Type | Jan-2008 | D | Superseded by UFGS 33 32 16 Packaged Utility Wastewater Pumping Stations Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |