Export to CSV

Below is a listing of the Revisions and Changes made to UFGS Sections for each release. You can narrow the list by selecting a UFGS Release date from the drop-down and clicking 'Apply'.

KEYPREPARING ACTIVITY (PA)A ArmyN NavyF Air ForceS NASA [ARCHIVED]
ACTIONN NewR RevisionC ChangeD Deletion
Release PA UFGS Section Action Change # Nature of Change or Revision
May-2017 A UFGS 32 12 13 Bituminous Tack[ and][ Prime] Coats N Superseding UFGS 32 12 10; Total review and update with no title change.
May-2017 A UFGS 32 12 36.13 Bituminous Fog Seal N Superseding UFGS 32 01 13 Bituminous Seal and Fog Coats; Total review and update.
May-2017 A UFGS 32 15 00 Aggregate Surfacing R Total review and update; Section title changed from Aggregate Surface Course.
May-2017 A UFGS 32 17 23 Pavement Markings C 2 In response to CCR 5549, removed "Gradation A" from Type III beads.
May-2017 S UFGS 32 31 13 Chain Link Fences and Gates C 1 Incorporated CCR 4487, revised paragraphs 2.2.15, and 2.2.17
May-2017 N UFGS 32 84 24 Irrigation Sprinkler Systems C 1 Changes made to address CCRs 5293, 5294, 5305, 5306, and 5307
May-2017 A UFGS 33 40 00 Stormwater Utilities C 5 Added requirements for field quality control.
May-2017 S UFGS 33 77 36.00 40 Medium-Voltage Utility Fuses R Tri-Annual Database Maintenance (TADM) completed
May-2017 S UFGS 33 77 36.00 40 Medium-Voltage Utility Fuses R Tri-Annual Database Maintenance (TADM) completed
May-2017 A UFGS 34 71 13.16 Vehicle Crash Barriers C 1 In response to CCR 4568, updated references and incorporated minor changes.
May-2017 S UFGS 40 18 00.00 40 Vacuum Systems Process Piping R Tri-Annual Database Maintenance (TADM) completed
May-2017 S UFGS 40 18 00.00 40 Vacuum Systems Process Piping R Tri-Annual Database Maintenance (TADM) completed
May-2017 S UFGS 42 22 00.00 40 Process Chillers and Coolers R Tri-Annual Database Maintenance (TADM) completed
May-2017 S UFGS 42 22 00.00 40 Process Chillers and Coolers R Tri-Annual Database Maintenance (TADM) completed
May-2017 F UFGS 48 14 00 Solar Photovoltaic Systems N New Section.
May-2017 N UFGS 48 15 00 Wind Generator System N New Section.
May-2017 A UFGS 48 16 00 Landfill Gas Systems N New Section.
Feb-2017 N UFGS 01 33 29 Sustainability Requirements and Reporting R Required revisions in order to align with numerous changes in Federal requirements and DOD policy.
Feb-2017 N UFGS 01 35 26 Governmental Safety Requirements C 4 Added crane requirements for Critical Lift Plan, Barge Mounted, and Base Mounted Drum Hoists from NAVFAC P-307 that were not in EM 385-1-1. For Navy, added requirement of accident investigation reporting within 5 days of mishaps and 10 days of accidents.
Feb-2017 S UFGS 01 75 00.00 40 Starting and Adjusting D This Section has been retired / Action Item from the Fall 2016 Specification DWG Meeting.
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2017 A UFGS 01 91 00.15 Building Commissioning C 1 In response to CCR 5173, added two "S" submittals in SD-11.
Feb-2017 A UFGS 02 53 13 Remediation of Contaminated Soils and Sludges by Incineration D UFGS archived. Outdated specification and no longer use incineration for contaminated soils.
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2017 N UFGS 02 83 13.00 20 Lead in Construction C 1 CCR 5279: updated paragraph 1.5.2.2 Lead Compliance Plan.
Feb-2017 S UFGS 05 51 00 Metal Stairs R Tri-Annual Database Maintenance (TADM) completed
Feb-2017 S UFGS 05 51 00 Metal Stairs R Tri-Annual Database Maintenance - Subpart 1.2 Submittal Article Compliance
Feb-2017 N UFGS 07 22 00 Roof and Deck Insulation C 1 CCR 5475: Changed terminology within this section from “Protection Board” to “Cover Board”.
Feb-2017 S UFGS 23 09 13.34 40 Control Valves, Self-Contained R Tri-Annual Database Maintenance (TADM) completed
Feb-2017 N UFGS 23 09 23.13 20 BACnet Direct Digital Control Systems for HVAC C 1 BACnet Operator Workstation (B-OWS) updated to BACnet Advanced Operator Workstation (B-AWS) in 2.1.6.2-[BACnet Operator Workstation][and][Notebook Computer] DDC Software.
Feb-2017 S UFGS 23 22 13.35 40 Steam Traps R Tri-Annual Database Maintenance (TADM) completed
Feb-2017 S UFGS 23 34 23.00 40 HVAC Power Ventilators R Tri-Annual Database Maintenance (TADM) completed
Feb-2017 S UFGS 23 34 23.00 40 HVAC Power Ventilators R Tri-Annual Database Maintenance (TADM) completed
Feb-2017 N UFGS 23 64 26 Chilled, Chilled-Hot, and Condenser Water Piping Systems C 4 Updated Technical Note in 2.2.2-Fittings and End Connections (Joints)
Feb-2017 N UFGS 25 50 00.00 20 Cybersecurity of Facility-Related Control Systems N New Navy-only Section identifying the requirements for a NAVFAC Cybersecurity Hygiene Checklist.
Feb-2017 S UFGS 26 05 71.00 40 Low-Voltage Overcurrent Protective Devices R Tri-Annual Database Maintenance (TADM) completed
Feb-2017 S UFGS 28 31 13.00 40 Fire Detection and Alarm Control, GUI and Logic Systems R Tri-Annual Database Maintenance (TADM) completed
Feb-2017 S UFGS 28 31 13.00 40 Fire Detection and Alarm Control, GUI and Logic Systems R Tri-Annual Database Maintenance (TADM) completed
Feb-2017 S UFGS 28 33 00.00 40 Fuel-Gas Detection and Alarm R Tri-Annual Database Maintenance (TADM) completed
Feb-2017 A UFGS 32 01 13.64 Rejuvenation of Asphalt Pavement Surfaces N Superseding UFGS 32 01 22 Bituminous Rejuvenation; Total review and update.
Feb-2017 A UFGS 32 01 16.17 Cold Milling of Bituminous Pavements D Superseded by UFGS 32 01 16.71 Cold Milling Asphalt Paving.
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2017 A UFGS 32 01 16.71 Cold Milling Asphalt Paving N Superseding UFGS 32 01 16.17 Cold Milling of Bituminous Pavements; Total review and update.
Feb-2017 A UFGS 32 01 16.75 Heater Scarifying of Asphalt Paving N Superseding UFGS 32 01 25 Heater Scarifying of Bituminous Pavements; Total review and update.
Feb-2017 A UFGS 32 01 22 Bituminous Rejuvenation D Superseded by UFGS 32 01 13.64 Bituminous Pavement Liquid Rejuvenating
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2017 A UFGS 32 01 25 Heater Scarifying of Bituminous Pavements D Superseded by UFGS 32 01 16.75 Heater Scarifying of Asphalt Paving
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2017 A UFGS 32 17 23 Pavement Markings C 1 In response to CCR 5270, changed "Waterborne Paint" to "Reflective Media for Airfields" in SD-07.
Feb-2017 N UFGS 32 93 00 Exterior Plants C 2 CCR 4981: References to ASTM D5203 and ASTM D5852 have been removed from this Section.
Feb-2017 A UFGS 33 46 16 Subdrainage Piping R Total review and update including title change from
SUBDRAINAGE SYSTEM
Feb-2017 S UFGS 33 71 01.00 40 Overhead Transmission and Distribution C 1 Changed 3 tailoring tags; corrected minor discrepancies
Nov-2016 S UFGS 01 33 00 Submittal Procedures C 9 Replaced 01 45 00.10 10 QUALITY CONTROL SYSTEM (QCS) with 01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM) in Subpart 1.9 SUBMITTAL REGISTER AND DATABASE.
Nov-2016 N UFGS 01 35 26 Governmental Safety Requirements C 3 In paragraph "Fall Protection for Roofing Work", item b. Steep-Sloped Roofs, changed slope from "4:1" to "4:12".
Nov-2016 A UFGS 01 45 00.00 10 Quality Control R Total review and update.
Nov-2016 A UFGS 01 45 00.10 10 Quality Control System (QCS) D Superseded by UFGS 01 45 00.15 10 Resident Management System Contractor Mode (RMS CM).
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2016 A UFGS 01 45 00.15 10 Resident Management System Contractor Mode (RMS CM) N Superseding UFGS 01 45 00.10 10 Quality Control System (QCS); Total review and update.
Nov-2016 A UFGS 02 83 19.00 10 Lead Based Paint Hazard Abatement, Target Housing and Child Occupied Facilities D Superseded by UFGS 02 83 19.13 10 Lead-Based Paint Abatement; Nontechnical number and title change.
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2016 A UFGS 02 83 19.13 10 Lead-Based Paint Abatement R Superseding UFGS 02 83 19.00 10 Lead Based Pain Hazard Abatement, Target Housing and Child Occupied Facilities; Nontechnical Number and Title Revision; Did not change Section date.
Nov-2016 N UFGS 06 13 33 Pier Timberwork R Revised to address changes in preservative treatments for Pier Timberwork.
Nov-2016 A UFGS 06 17 19 Cross-Laminated Timber N New Section
Nov-2016 N UFGS 07 31 13 Asphalt Shingles C 1 In response to CCR #5002, added reference to ASTM D7158/D7158M for Class H roof in paragraph 2.2.1 "Shingles."
Nov-2016 A UFGS 09 06 00 Schedules for Finishes R Superseding UFGS 09 06 90 Schedules for Painting and Coating; Nontechnical Number and Title Revision; Did not change Section date.
Nov-2016 A UFGS 09 06 90 Schedules for Painting and Coating D Superseded by UFGS 09 06 00 Schedules for Finishes; Nontechnical number and title change.
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2016 A UFGS 09 65 00 Resilient Flooring C 2 In response to CCR 4916, Luxury Vinyl Tile added.
Nov-2016 N UFGS 09 97 23.17 Corrosion Inhibitor Coating of Concrete Structures C 1 Paragraphs "Penetrating Vapor Phase Corrosion Inhibitor" and "Surface Sealant' were revised to correct the product technical descriptions.
Nov-2016 S UFGS 12 31 00 Manufactured Metal Casework C 2 Replaced 09 06 90 SCHEDULES FOR PAINTING AND COATING with 09 06 00 SCHEDULES FOR FINISHES in Subpart 2.8 COLOR, TEXTURE, AND PATTERN.
Nov-2016 S UFGS 12 34 00 Manufactured Plastic Casework C 2 Replaced 09 06 90 SCHEDULES FOR PAINTING AND COATING with 09 06 00 SCHEDULES FOR FINISHES in Subpart 2.3.2 Color, Texture, and Pattern.
Nov-2016 S UFGS 12 36 00 Countertops C 1 Replaced 09 06 90 SCHEDULES FOR PAINTING AND COATING with 09 06 00 SCHEDULES FOR FINISHES in Subpart 2.3.2 Color, Texture, and Pattern.
Nov-2016 S UFGS 12 48 13 Entrance Floor Mats and Frames C 3 Replaced 09 06 90 SCHEDULES FOR PAINTING AND COATING with 09 06 00 SCHEDULES FOR FINISHES in Subpart 2.4 COLOR AND SIZE.
Nov-2016 S UFGS 22 15 09.00 40 General Service Compressed-Air Systems Cleaning Procedures R Tri-Annual Database Maintenance (TADM) completed
Nov-2016 N UFGS 23 64 00 Packaged Water Chillers, Absorption Type R Complete revision.
Nov-2016 N UFGS 23 64 10 Water Chillers, Vapor Compression Type R Complete revision.
Nov-2016 N UFGS 23 65 00 Cooling Towers and Remote Evaporatively-Cooled Condensers R Title changed from Cooling Towers; Complete review and update concerning cooling towers and remote evaporatively cooled condensers.
Nov-2016 N UFGS 26 51 00 Interior Lighting C 1 Changed LED light fixtures, light sources and drivers to a 5 year warranty to meet current industry standards.
Nov-2016 A UFGS 31 11 00 Clearing and Grubbing C 1 Added herbicide requirements.
Nov-2016 N UFGS 31 62 19.13 Timber Marine Piles R Title changed from Wood Marine Piles; Revised to address changes in preservative treatments and basis of bids for Timber Marine Piles.
Nov-2016 A UFGS 32 01 11.51 Rubber and Paint Removal From Airfield Pavements C 1 Clarified sandblasting requirements.
Nov-2016 S UFGS 32 31 13 Chain Link Fences and Gates R Tri-Annual Database Maintenance (TADM) completed
Oct-2016 N UFGS 09 97 13.27 High Performance Coating for Steel Structures R INTERIM RELEASE: It was recently brought to our attention that the February 2016 revision of this section contained performance requirements that have been met by only one supplier for the entire paint system.
This revision restores the February 2010, Change 1 version that provides for a competitive product.
Aug-2016 N UFGS 01 35 26 Governmental Safety Requirements C 2 Changed requirements for portable ionizing radiation equipment.
Aug-2016 A UFGS 01 45 00.10 10 Quality Control System (QCS) C 1 Update minimum QCS System Requirements, compliance with plain language requirements.
Aug-2016 N UFGS 01 57 19 Temporary Environmental Controls C 1 Fixed bracketed items and tailoring.
Aug-2016 N UFGS 01 57 19.01 20 Supplemental Temporary Environmental Controls C 1 Changed NAVFAC NW Installation's notes, and related information, for Hazardous Waste Management.
Aug-2016 S UFGS 01 91 00.00 40 Commissioning D Replaced by UFGS Section 01 91 00.15 Total Building Commissioning (Preparing Activity: USACE).
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2016 S UFGS 03 47 13 Tilt-Up Concrete R Tri-Annual Database Maintenance process, which includes updating for Imperative Language, CSI-UFC Section Format, and cleaning up the Submittal Article; no technical content changes have been made
Aug-2016 S UFGS 03 47 13 Tilt-Up Concrete R Tri-Annual Database Maintenance (TADM) completed
Aug-2016 N UFGS 06 10 00 Rough Carpentry R Alignment with Federal and DoD sustainability requirements for tracking and reporting
Aug-2016 S UFGS 06 18 00 Glued-Laminated Construction R Tri-Annual Database Maintenance (TADM) completed
Aug-2016 S UFGS 06 18 00 Glued-Laminated Construction R Tri-Annual Database Maintenance (TADM) completed
Aug-2016 N UFGS 06 20 00 Finish Carpentry R Alignment with Federal and DoD sustainability requirements for tracking and reporting
Aug-2016 N UFGS 07 31 13 Asphalt Shingles R Alignment with Federal and DoD sustainability requirements for tracking and reporting
Aug-2016 N UFGS 07 61 14.00 20 Steel Standing Seam Roofing R Alignment with Federal and DoD sustainability requirements for tracking and reporting
Aug-2016 N UFGS 07 61 15.00 20 Aluminum Standing Seam Roofing R Alignment with Federal and DoD sustainability requirements for tracking and reporting
Aug-2016 N UFGS 07 92 00 Joint Sealants R Alignment with Federal and DoD sustainability requirements for tracking and reporting
Aug-2016 N UFGS 08 14 00 Wood Doors R Alignment with Federal and DoD sustainability requirements for tracking and reporting
Aug-2016 N UFGS 09 23 00 Gypsum Plastering R Alignment with Federal and DoD sustainability requirements for tracking and reporting
Aug-2016 N UFGS 09 26 00 Veneer Plaster R Alignment with Federal and DoD sustainability requirements for tracking and reporting
Aug-2016 N UFGS 09 29 00 Gypsum Board R Alignment with Federal and DoD sustainability requirements for tracking and reporting
Aug-2016 A UFGS 09 35 16 Chemical-Resistant Quarry Tiling R Alignment with Federal and DoD sustainability requirements for tracking and reporting
Aug-2016 N UFGS 09 64 00 Portable (Demountable) Wood Flooring R Alignment with Federal and DoD sustainability requirements for tracking and reporting
Aug-2016 A UFGS 09 64 23 Wood Parquet Flooring R Alignment with Federal and DoD sustainability requirements for tracking and reporting
Aug-2016 A UFGS 09 64 29 Wood Strip and Plank Flooring R Alignment with Federal and DoD sustainability requirements for tracking and reporting
Aug-2016 N UFGS 09 64 66 Wood Athletic Flooring R Alignment with Federal and DoD sustainability requirements for tracking and reporting
Aug-2016 A UFGS 09 65 66 Resilient Athletic Flooring R Alignment with Federal and DoD sustainability requirements for tracking and reporting