History: Below is a listing of the Revisions and Changes made to this UFGS.

KEYPREPARING ACTIVITY (PA)A ArmyN NavyF Air ForceS NASA [ARCHIVED]
ACTIONN NewR RevisionC ChangeD Deletion
Release PA Action Change # Nature of Change or Revision
Aug-2023 N R Complete review and update including the incorporation of CCRs.
Nov-2018 N C 3 Added notes to consider use of polystyrene as a roof insulation in humid or ESC C3-C5 locations and not to use wood fiberboard in humid or ESC C4-C5 locations.
Aug-2018 N C 2 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Feb-2017 N C 1 CCR 5475: Changed terminology within this section from “Protection Board” to “Cover Board”.
Feb-2016 N R Complete revision; revised throughout to incorporate CCRs 4254, 2807; update format and editorial changes.
May-2013 N C 1 Modified subpart 1.4.3
Aug-2011 N R Modified subparts 1.2, 2.1.1, 2.1.3, 3.1.1; Added subparts 1.4.4 , 1.4.5 and 2.2.2
May-2011 N R Reference updates: Modified General Note, subparts 1.2 (note) and 2.1.1
Aug-2010 N R Added GEI or SCS certification
Nov-2008 N R Reference changed from FM AS 4470 to FM 4470
Jan-2007 N R Incorporated NASA requirements