Below is a listing of the Revisions and Changes made to UFGS Sections for each release. You can narrow the list by selecting a UFGS Release date from the drop-down and clicking 'Apply'.
KEY | PREPARING ACTIVITY (PA) | A Army | N Navy | F Air Force | S NASA [ARCHIVED] |
---|---|---|---|---|---|
ACTION | N New | R Revision | C Change | D Deletion |
Release | PA | UFGS Section | Date | Action | Change # | Nature of Change or Revision |
---|---|---|---|---|---|---|
Nov-2014 | S | UFGS 33 71 01.00 40 Overhead Transmission and Distribution | Nov-2014 | R | Tri-Annual Database Maintenance (TADM) completed. | |
Nov-2014 | N | UFGS 33 71 02 Underground Electrical Distribution | Feb-2014 | C | 1 | Changed Section Reference 31 31 16 SOIL TREATMENT FOR SUBTERRANEAN TERMITE CONTROL to Section Reference 31 31 16.13 CHEMICAL TERMITE CONTROL |
Nov-2014 | S | UFGS 33 73 00.00 40 Utility Transformers | Nov-2014 | R | Tri-Annual Database Maintenance (TADM) which consists of updating of Section Format, imperative language and formatting review, and verification of all reports and spelling. | |
Nov-2014 | S | UFGS 33 73 00.00 40 Utility Transformers | Nov-2014 | R | Tri-Annual Database Maintenance (TADM) completed. | |
Nov-2014 | S | UFGS 33 75 00.00 40 Switchgear and Protection Devices | Nov-2014 | R | Tri-Annual Database Maintenance (TADM) completed. | |
Nov-2014 | N | UFGS 33 81 27 Pier Telephone Distribution Systems | Apr-2006 | D | Out of date, rarely used, can't keep up with technology changes. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
Nov-2014 | A | UFGS 34 73 13 Aircraft Tiedowns | Apr-2008 | C | 1 | Revised paragraphs as noted in CCR 1569. |
Nov-2014 | A | UFGS 35 01 41.00 10 Electromechanical Operating Machinery for Locks and Dams | Nov-2014 | R | Revised section to include requirements for locks and dams. | |
Nov-2014 | A | UFGS 35 31 19 Stone, Channel, Shoreline/Coastal Protection for Structures | Jan-2008 | C | 1 | SRF update, changed 00 41 00 BID SCHEDULES to 00 22 13.00 20 SUPPLEMENTARY INSTRUCTIONS TO OFFERORS. |
Nov-2014 | N | UFGS 40 95 33.23 20 Fiber Optic (FO) Outside Plant (OSP) Media | Apr-2006 | D | Previously incorporated into UFGS 33 82 00 Telecommunications Outside Plant (OSP). Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
Nov-2014 | A | UFGS 43 31 14 Trickling Filter | Apr-2006 | C | 1 | Deleted reference and revised par. 2.4.1 and 2.4.2 as noted in CCR 768. |
Aug-2014 | N | UFGS 00 01 15 List of Drawings | Feb-2011 | C | 1 | Added editor's note to import list of drawings as Excel XML spreadsheet. |
Aug-2014 | N | UFGS 00 41 00 Bid Schedules | Jan-2007 | D | Deleted, Superseded by UFGS 00 22 13.00 20 Supplementary Instructions to Offerors through unification. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
Aug-2014 | N | UFGS 01 14 00 Work Restrictions | Nov-2011 | C | 2 | Fixed tailoring and bracket issue throughout. Revised Employment Restrictions for Bremerton, WA |
Aug-2014 | N | UFGS 01 30 00 Administrative Requirements | Nov-2011 | C | 2 | Deleted 35 mm slides as picture media |
Aug-2014 | A | UFGS 01 50 00 Temporary Construction Facilities and Controls | Aug-2009 | C | 1 | Moved execution requirements to Part 3 as noted in CCR 3562 |
Aug-2014 | N | UFGS 01 78 23 Operation and Maintenance Data | Jul-2006 | C | 2 | Added editor's note to coordinate with UFGS 01 78 24.00 20 FACILITY eOMSI for Navy projects. |
Aug-2014 | N | UFGS 01 78 24.00 20 Facility Data Workbook (FDW) | Aug-2014 | R | Added reference note to newly published ECB; changed validation to verification, and deleted manuals from verification process. | |
Aug-2014 | A | UFGS 02 41 00 [Demolition] [and] [Deconstruction] | May-2010 | C | 1 | Added FAA requirements as noted in CCR 857 |
Aug-2014 | A | UFGS 03 15 00.00 10 Concrete Accessories | May-2014 | C | 1 | Made corrections as noted in CCR 3836 |
Aug-2014 | A | UFGS 03 20 00.00 10 Concrete Reinforcing | May-2014 | C | 1 | Corrected spelling as noted in CCR 3841; made corrections as noted in CCR 3842 |
Aug-2014 | N | UFGS 07 52 00 Modified Bituminous Membrane Roofing | May-2012 | C | 2 | Fixed typo under "Substrate Preparation. Changed "Don not" to "Do not" |
Aug-2014 | N | UFGS 09 22 00 Supports for Plaster and Gypsum Board | Feb-2010 | C | 1 | In 2.1 UFC 3-310-04 needed a RID tag; fixed |
Aug-2014 | N | UFGS 13 34 19 Metal Building Systems | Nov-2011 | C | 1 | Fixed spacing in manufacturers data |
Aug-2014 | S | UFGS 22 14 29.00 Sump Pumps | Aug-2014 | R | Tri Annual Database Maintenance (TADM) completed | |
Aug-2014 | A | UFGS 23 00 00 Air Supply, Distribution, Ventilation, and Exhaust Systems | Aug-2010 | C | 3 | Added Energy Star requirements |
Aug-2014 | A | UFGS 23 52 00 Heating Boilers | Apr-2008 | C | 1 | Deleted the mention of Section 00 41 00 BID SCHEDULES, from subpart 1.2.2.1, this section was deleted from the UFGS Database |
Aug-2014 | S | UFGS 23 82 43.00 40 Electric Duct Heaters | Aug-2014 | R | Tri Annual Database Maintenance (TADM) completed | |
Aug-2014 | S | UFGS 23 82 46.00 40 Electric Unit Heaters | Aug-2014 | R | Tri Annual Database Maintenance (TADM) completed | |
Aug-2014 | S | UFGS 26 28 21.00 40 Automatic Transfer Switches | Aug-2014 | R | Tri Annual Database Maintenance (TADM) completed | |
Aug-2014 | S | UFGS 26 52 00.00 40 Emergency Lighting | Aug-2014 | R | Tri Annual Database Maintenance (TADM) completed | |
Aug-2014 | S | UFGS 27 05 28.36 40 Cable Trays for Communications Systems | Aug-2014 | R | Tri Annual Database Maintenance (TADM) completed | |
Aug-2014 | N | UFGS 31 31 16.19 Termite Control Barriers | Aug-2014 | R | Changes to 3.1, 3.1.1, 3.1.2, 3.2.2, and 3.4; Section Title was changed from TERMITE CONTROL BARRIER SYSTEM to MESH TERMITE CONTROL BARRIER SYSTEM | |
Aug-2014 | N | UFGS 31 31 16.20 Basaltic Termite Barrier | Apr-2006 | C | 1 | Added SDs 6,8, and 11 |
Aug-2014 | A | UFGS 31 41 16 Metal Sheet Piling | Aug-2009 | C | 1 | Deleted the mention of Section 00 41 00 BID SCHEDULES, from subpart 1.2.2.1, this section was deleted from the UFGS Database |
Aug-2014 | A | UFGS 32 32 23 Segmental Concrete Block Retaining Wall | Apr-2008 | C | 1 | Deleted paragraph as noted in CCR 3331 |
Aug-2014 | N | UFGS 32 93 00 Exterior Plants | Feb-2010 | C | 1 | CCR 3597: ASTM D1527 has been withdrawn with not replacement and CCR 3602: ASTM D1972 has been withdrawn with no replacement |
Aug-2014 | A | UFGS 33 30 00 Sanitary Sewerage | Apr-2008 | C | 2 | Made corrections as noted in CCR 1672 |
Aug-2014 | A | UFGS 33 40 00 Stormwater Utilities | Feb-2010 | C | 3 | Made change as noted in CCR 3572; added SRPE requirements as noted in CCR 1158; made corrections and changes as noted in CCR 3333 |
Aug-2014 | A | UFGS 35 01 70.13 Wire Rope for Gate Operating Devices | May-2014 | C | 1 | Made minor editorial corrections |
Aug-2014 | A | UFGS 35 31 19 Stone, Channel, Shoreline/Coastal Protection for Structures | Jan-2008 | C | 1 | Deleted the mention of Section 00 41 00 BID SCHEDULES, from subpart 1.4.1.1, and 1.4.2, this section was deleted from the UFGS Database |
Aug-2014 | S | UFGS 42 22 13.00 40 Centrifugal Process Chillers and Coolers | Aug-2014 | R | Tri Annual Database Maintenance (TADM) completed | |
Aug-2014 | S | UFGS 42 22 16.00 40 Reciprocating Process Chillers and Coolers | Aug-2014 | R | Tri Annual Database Maintenance (TADM) completed | |
Aug-2014 | S | UFGS 42 23 13.00 40 Process Condensers | Aug-2014 | R | Tri Annual Database Maintenance (TADM) completed | |
Aug-2014 | S | UFGS 43 41 16.16 40 Vertical Atmospheric Tanks and Vessels | Aug-2014 | R | Tri Annual Database Maintenance (TADM) completed | |
Aug-2014 | A | UFGS 46 53 62 Continuous Loop Reactor (CLR) Wastewater Treatment System | Feb-2011 | C | 1 | Added paint requirements as noted in CCR 2518 |
Aug-2014 | A | UFGS 46 61 00 Filtration Equipment | Feb-2011 | C | 1 | Added paint requirements as noted in CCR 2519 |
Aug-2014 | A | UFGS 46 73 00.35 Sludge-Digester Gas, Heating, and Mixing System | Feb-2011 | C | 1 | Deleted publication as noted in CCR 776 |
Aug-2014 | A | UFGS 46 76 23.16 Recessed Chamber Filter Presses | Feb-2011 | C | 1 | Added paint requirements as noted in CCR 2520 |
May-2014 | N | UFGS 01 57 19.01 20 Supplemental Temporary Environmental Controls | Feb-2010 | C | 3 | Modified subpart 3.1.1.1 |
May-2014 | N | UFGS 01 78 24.00 20 Facility Data Workbook (FDW) | May-2014 | R | Revised "eOMSI documents" to "eOMSI Manual", revised "eOMSI Facility data" to "eOMSI Facility Data Workbook" and revised throughout to coordinate requirements. | |
May-2014 | A | UFGS 03 11 13.00 10 Structural Cast-In-Place Concrete Forming | May-2014 | R | Major revision to comply with ICC IBC 2012 | |
May-2014 | A | UFGS 03 11 19.00 Insulating Concrete Forming | May-2014 | R | Major revision to comply with ICC IBC 2012 | |
May-2014 | A | UFGS 03 15 00.00 10 Concrete Accessories | May-2014 | R | Major revision to comply with ICC IBC 2012 | |
May-2014 | A | UFGS 03 20 00.00 10 Concrete Reinforcing | May-2014 | R | Major revision to comply with ICC IBC 2012 | |
May-2014 | N | UFGS 03 30 00 Cast-In-Place Concrete | May-2014 | R | Major revision to comply with IBC 2012 | |
May-2014 | A | UFGS 03 30 00.00 10 Cast-In-Place Concrete | May-2014 | R | Major revision to comply with ICC IBC 2012 | |
May-2014 | A | UFGS 03 30 53 Miscellaneous Cast-In-Place Concrete | May-2014 | R | Major revision to comply with ICC IBC 2012 | |
May-2014 | A | UFGS 03 31 01.00 10 Cast-In-Place Structural Concrete for Civil Works | May-2014 | R | Major revision to comply with ICC IBC 2012 | |
May-2014 | A | UFGS 03 35 00.00 10 Concrete Finishing | May-2014 | R | Major revision to comply with ICC IBC 2012 | |
May-2014 | A | UFGS 03 39 00.00 10 Concrete Curing | May-2014 | R | Major revision to comply with ICC IBC 2012 | |
May-2014 | S | UFGS 03 41 33 Precast Structural Pretensioned Concrete | Feb-2011 | C | 2 | SRF update, changed 05 05 23 WELDING, STRUCTURAL to 05 05 23.16 STRUCTURAL WELDING |
May-2014 | S | UFGS 03 47 13 Tilt-Up Concrete | Aug-2008 | C | 2 | SRF update, changed 05 05 23 WELDING, STRUCTURAL to STRUCTURAL WELDING |
May-2014 | A | UFGS 05 05 23 Welding, Structural | Nov-2008 | D | Superseded by UFGS 05 05 23.16 Structural Welding for compliance with MasterFormat. Also, major revision to comply with ICC IBC 2012. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
May-2014 | A | UFGS 05 05 23.13 10 Ultrasonic Inspection of Weldments | May-2014 | R | Major revision to comply with ICC IBC 2012 | |
May-2014 | A | UFGS 05 05 23.16 Structural Welding | May-2014 | N | Superseding UFGS 05 05 23 Welding, Structural for compliance with MasterFormat. Section also updated to comply with ICC IBC 2012 | |
May-2014 | N | UFGS 05 12 00 Structural Steel | May-2014 | R | Major revision to comply with IBC 2012 | |
May-2014 | A | UFGS 05 50 14 Structural Metal Fabrications | May-2014 | R | Major revision to comply with ICC IBC 2012 | |
May-2014 | A | UFGS 05 50 15 Civil Works Fabrications | May-2014 | R | Major revision to comply with ICC IBC 2012 | |
May-2014 | S | UFGS 05 51 00 Metal Stairs | Feb-2012 | C | 1 | SRF update, changed 05 05 23 WELDING, STRUCTURAL to 05 05 23.16 STRUCTURAL WELDING. |
May-2014 | S | UFGS 05 52 00 Metal Railings | Feb-2011 | C | 3 | SRF update, changed 05 05 23 WELDING, STRUCTURAL to STRUCTURAL WELDING |
May-2014 | A | UFGS 07 05 23 Pressure Testing an Air Barrier System for Air Tightness | May-2014 | N | Superseding UFGS 07 08 27.00 10 Building Air Barrier System Testing for Commissioning | |
May-2014 | A | UFGS 07 08 27.00 10 Building Air Barrier System Testing for Commissioning | Feb-2013 | D | Superseded by UFGS 07 05 23 Pressure Testing an Air Barrier System for Air Tightness and UFGS 07 27 10.00 10 Building Air Barrier System. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
May-2014 | A | UFGS 07 27 10.00 10 Building Air Barrier System | May-2014 | N | Superseding UFGS 07 08 27.00 10 Building Air Barrier System Testing for Commissioning | |
May-2014 | A | UFGS 07 55 00 Protected Membrane Roofing (PMR) | Aug-2009 | C | 1 | Energy efficiency requirements added |
May-2014 | N | UFGS 08 34 16.20 Vertical Lift Fabric Doors | May-2014 | R | Major revision; state-of-the-art study to improve VLFD reliability, improve performance requirements and increase vendor competitiveness. | |
May-2014 | N | UFGS 08 53 00 Plastic Windows | Aug-2011 | C | 1 | Modified subpart 1.6.3 |
May-2014 | N | UFGS 08 88 58 Air Traffic Control Tower Cab Glass | May-2014 | N | New section | |
May-2014 | A | UFGS 11 44 00 Food Cooking Equipment | Jan-2008 | C | 1 | Energy efficiency requirements added |
May-2014 | S | UFGS 28 05 26.00 40 Grounding and Bonding for Electrical Systems | Aug-2013 | C | 1 | SRF update, changed 05 05 23 WELDING, STRUCTURAL to 05 05 23.16 STRUCTURAL WELDING |
May-2014 | N | UFGS 32 17 23.00 20 Pavement Markings | Apr-2006 | C | 1 | Modified subpart 2.1 (note), 2.1.1 and 2.1.2. |
May-2014 | A | UFGS 33 52 43 Aviation Fuel Distribution (Non-Hydrant) | May-2011 | C | 1 | Clarified washer material requirements as noted in CCR 2605 |
May-2014 | A | UFGS 33 52 43.13 Aviation Fuel Piping | Feb-2010 | C | 1 | Clarified washer material requirements as noted in CCR 2604 |
May-2014 | A | UFGS 35 01 43 Wire Rope for Gate Operating Devices | Apr-2008 | D | In combination with a major revision, section number changed for compliance with MasterFormat. Superseded by UFGS 35 01 70.13 Wire Rope for Gate Operating Devices. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
May-2014 | A | UFGS 35 01 70.13 Wire Rope for Gate Operating Devices | May-2014 | N | Major revision of and superseding UFGS 35 01 43 Wire Rope for Gate Operating Devices | |
May-2014 | A | UFGS 35 05 40.14 10 Hydraulic Power Systems for Civil Works Structures | May-2014 | N | Major revision of and superseding UFGS 41 24 27.00 10 Hydraulic Power Systems for Civil Works Structures | |
May-2014 | A | UFGS 35 05 40.17 Self-Lubricated Materials, Fabrication, Handling, and Assembly | May-2014 | N | New UFGS section | |
May-2014 | S | UFGS 40 17 30.00 40 Welding General Piping | Aug-2010 | C | 2 | SRF update, changed 05 05 23 WELDING, STRUCTURAL to 05 05 23.16 STRUCTURAL WELDING |
May-2014 | A | UFGS 41 24 27.00 10 Hydraulic Power Systems for Civil Works Structures | Jan-2008 | D | In combination with a major revision, section number changed for compliance with MasterFormat. Superseded by UFGS 35 05 40.14 10 Hydraulic Power Systems for Civil Works Structures. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
May-2014 | A | UFGS 48 06 15 Turbine Oil | May-2014 | N | Full review, updates and superseding UFGS 48 13 19.00 10 Turbine Oil | |
May-2014 | A | UFGS 48 13 19.00 10 Turbine Oil | Nov-2008 | D | Superseded by UFGS 48 06 15 Turbine Oil. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
Feb-2014 | N | UFGS 00 22 13 Supplementary Instructions to Bidders | May-2011 | D | Superseded by UFGS 00 22 13.00 20 Supplementary Instructions to Offerors Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
Feb-2014 | N | UFGS 00 73 01 Supplementary Conditions for Guantanamo Bay Projects | Aug-2008 | C | 1 | Deleted subpart 1.3.1.3 "Waiver for Workers' Compensation" |
Feb-2014 | A | UFGS 01 42 15 Metric Measurements | Feb-2014 | N | New; Revision of UFGS 00 31 10 Metric Measurements which was deleted August 2013. Section is being reinstated and has been renumbered. | |
Feb-2014 | N | UFGS 01 57 19.01 20 Supplemental Temporary Environmental Controls | Feb-2010 | C | 2 | Modified note before Part 1, Part 1, subparts 1.3, 1.4.1, 1.4.1.2,1.4.1.2.2, 1.4.1.3, 1.4.1.4, 1.4.1.5, 1.4.1.6.1, 1.4.1.6.6, 1.4.1.7, 1.6.5.2.1 and 1.6.5.2.2 |
Feb-2014 | N | UFGS 07 21 23 Loose Fill Thermal Insulation | May-2011 | C | 2 | Modified subpart 2.1.1 |
Feb-2014 | N | UFGS 08 11 13 Steel Doors and Frames | Feb-2010 | C | 1 | Modified subpart 2.3 |
Feb-2014 | A | UFGS 09 68 00 Carpeting | Nov-2013 | C | 1 | Allowed for use of triexta (PTT) |
Feb-2014 | S | UFGS 12 48 13 Entrance Floor Mats and Frames | Feb-2014 | N | Superseding UFGS 12 48 13.13 Entrance Floor Mats; title and section number changed; updated entire section through unification; Tri Annual Database Maintenance (TADM) completed including incorporating CCRs | |
Feb-2014 | S | UFGS 12 48 13.13 Entrance Floor Mats | Feb-2011 | D | Superseded by UFGS 12 48 13 Entrance Floor Mats and Frames Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |