Below is a listing of the Revisions and Changes made to UFGS Sections for each release. You can narrow the list by selecting a UFGS Release date from the drop-down and clicking 'Apply'.
| KEY | PREPARING ACTIVITY (PA) | A Army | N Navy | F Air Force | S NASA [ARCHIVED] |
|---|---|---|---|---|---|
| ACTION | N New | R Revision | C Change | D Deletion |
| Release | PA | UFGS Section | Date | Action | Change # | Nature of Change or Revision |
|---|---|---|---|---|---|---|
| Jan-2008 | S | UFGS 12 36 00 Countertops | Jan-2008 | N | Superseding UFGS 12 30 00.00 40 Casework, UFGS 12 35 30.00 10 Residential Cabinets and Countertops, and UFGS 12 35 30.00 20 Residential Casework | |
| Jan-2008 | S | UFGS 13 34 00.00 40 Fabricated Engineered Structures | Jul-2007 | D | Superseded by UFGS 13 34 19 Metal Building Systems Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
| Jan-2008 | N | UFGS 13 34 19 Metal Building Systems | Jan-2008 | R | Titled changed from Preengineered Metal Buildings; Added USACE and NASA requirements. Superseding UFGS 13 34 00.00 40 Fabricated Engineered Structures, and UFGS 13 34 20 Metal Building Systems (Minor Requirements) | |
| Jan-2008 | A | UFGS 13 34 20 Metal Building Systems (Minor Requirements) | Oct-2007 | D | Superseded by UFGS 13 34 19 Metal Building Systems Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
| Jan-2008 | S | UFGS 13 50 00.00 40 Special Instrumentation | Apr-2007 | D | Retired; Section is redundant Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
| Jan-2008 | A | UFGS 21 30 00 Fire Pumps | Jan-2008 | R | revised reference: NEMA MG1 Motor | |
| Jan-2008 | A | UFGS 22 04 00.00 10 Plumbing, Hospital | Jan-2008 | R | Revised Table III | |
| Jan-2008 | S | UFGS 22 15 09 General Service Compressed-Air Systems Cleaning Procedures | Jan-2008 | R | Switched Section Number and Title with Section 22 15 14.00 40 | |
| Jan-2008 | S | UFGS 22 15 14.00 40 General Service Compressed-Air Systems, Low Pressure | Jan-2008 | R | Switched Section Number and Title with Section 22 15 09 | |
| Jan-2008 | A | UFGS 22 33 30.00 10 Solar Water Heating Equipment | Jan-2008 | R | Incorporated EPAct05 requirements | |
| Jan-2008 | A | UFGS 23 00 00 Air Supply, Distribution, Ventilation, and Exhaust Systems | Jan-2008 | R | Incorporated EPAct05 requirements | |
| Jan-2008 | A | UFGS 23 07 00 Thermal Insulation for Mechanical Systems | Jan-2008 | R | Incorporated EPAct05 requirements | |
| Jan-2008 | A | UFGS 23 08 00.00 10 Commissioning of HVAC Systems | Jan-2008 | R | Incorporated EPAct05 requirements | |
| Jan-2008 | A | UFGS 23 10 00 Fuel Storage Systems | Oct-2007 | D | Superseded by UFGS 33 56 10 Factory-Fabricated Fuel Storage Tanks Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
| Jan-2008 | A | UFGS 23 52 00.00 10 Water and Steam Heating; Oil, Gas or Both; Up to 20 MBTUH | Jan-2008 | R | In response to CCR 1579 | |
| Jan-2008 | A | UFGS 23 52 43.00 10 Heat Recovery Boilers | Jan-2008 | R | Incorporated EPAct05 requirements | |
| Jan-2008 | A | UFGS 23 54 16.00 10 Heating System; Gas-Fired Heaters | Jan-2008 | R | Incorporated EPAct05 requirements | |
| Jan-2008 | A | UFGS 23 57 10.00 10 Forced Hot Water Heating Systems Using Water and Steam Heat Exchangers | Jan-2008 | R | Incorporated EPAct05 requirements | |
| Jan-2008 | A | UFGS 23 64 00.00 10 Liquid Chillers | Jan-2008 | R | Incorporated EPAct05 requirements | |
| Jan-2008 | A | UFGS 23 65 00.00 10 Cooling Tower | Jan-2008 | R | Incorporated EPAct05 requirements | |
| Jan-2008 | A | UFGS 23 70 01.00 10 Central Steam-Generating System, Coal-Fired | Jan-2008 | R | Incorporated EPAct05 requirements | |
| Jan-2008 | A | UFGS 23 70 02.00 10 Central Steam Generating System - Combination Gas and Oil Fired | Jan-2008 | R | Incorporated EPAct05 requirements | |
| Jan-2008 | A | UFGS 23 70 03.00 10 Heating and Utilities Systems, Central Steam | Jan-2008 | R | Incorporated EPAct05 requirements | |
| Jan-2008 | A | UFGS 23 71 19 Thermal Energy Storage System: Ice-On-Coil | Jan-2008 | R | Incorporated EPAct05 requirements | |
| Jan-2008 | A | UFGS 23 72 00 Energy Recovery Systems | Jan-2008 | R | Incorporated EPAct05 requirements [23 72 00.00 10] | |
| Jan-2008 | A | UFGS 23 72 26.00 10 Desiccant Cooling Systems | Jan-2008 | R | Incorporated EPAct05 requirements | |
| Jan-2008 | A | UFGS 23 76 00.00 10 Evaporative Cooling Systems | Jan-2008 | R | Incorporated EPAct05 requirements | |
| Jan-2008 | A | UFGS 23 82 01.00 10 Warm Air Heating Systems | Jan-2008 | R | Incorporated EPAct05 requirements | |
| Jan-2008 | A | UFGS 23 82 02.00 10 Unitary Heating and Cooling Equipment | Jan-2008 | R | Incorporated EPAct05 requirements | |
| Jan-2008 | S | UFGS 26 05 73.00 40 Overcurrent Protective Devices | Jan-2008 | R | Updated Criteria | |
| Jan-2008 | N | UFGS 26 33 53.00 20 Uninterruptible Power Supply (UPS) | Jan-2008 | R | Revised paragraphs 3.1 and 3.3.1 | |
| Jan-2008 | N | UFGS 26 42 22.00 20 Cathodic Protection System for Steel Water Tanks | Jan-2008 | R | Titled changed from Cathodic Protection System (Steel Water Tanks); Extensive revisions; First step in unification of agency sections. | |
| Jan-2008 | N | UFGS 27 10 00 Building Telecommunications Cabling System | Jan-2008 | R | Added hyperlink to Army ECB 2007-22 in notes. | |
| Jan-2008 | S | UFGS 28 05 26 Grounding and Bonding for Electronic Safety and Security | Jan-2008 | N | Superseding UFGS 28 05 26.00 40 with no title change | |
| Jan-2008 | S | UFGS 28 05 26.00 40 Grounding and Bonding For Electronic Safety and Security | Jul-2007 | D | Renumbered; Superseded by UFGS 28 05 26 with same title Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
| Jan-2008 | A | UFGS 31 62 16.00 10 Steel H-Piles | Oct-2007 | D | Superseded by UFGS 31 62 16.16 Steel H-Piles Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
| Jan-2008 | N | UFGS 31 62 16.16 Steel H-Piles | Jan-2008 | R | Added USACE requirements | |
| Jan-2008 | N | UFGS 31 62 19 Timber Piles | Jan-2008 | N | Superseding UFGS 31 62 19.00 20 Timber Piles; Added USACE requirements | |
| Jan-2008 | N | UFGS 31 62 19.00 20 Timber Piles | Apr-2006 | D | Superseded by UFGS 31 62 19 Timber Piles Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
| Jan-2008 | A | UFGS 31 62 20.00 10 Round Timber Piles | Oct-2007 | D | Superseded by UFGS 31 62 19 Timber Piles Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
| Jan-2008 | A | UFGS 32 01 28 Partial-Depth Patching of Rigid Pavements | Jan-2008 | R | Includes Epoxy-Resin Requirements; Old Section Title: Patching of Rigid Pavements | |
| Jan-2008 | A | UFGS 32 31 00.00 10 Fencing | Apr-2006 | D | Superseded by UFGS 32 31 13 Chain Link Fences and Gates, UFGS 32 31 13.53 High-Security Chain Link Fences and Gates, and UFGS 32 31 26 Wire Fences and Gates Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
| Jan-2008 | S | UFGS 32 31 13 Chain Link Fences and Gates | Jan-2008 | N | Superseding UFGS 32 31 00.00 10 Fencing, UFGS 32 31 13.00 20 Chain Link Fences and Gates, and UFGS 32 31 13.00 40 Chain Link Fences and Gates | |
| Jan-2008 | N | UFGS 32 31 13.00 20 Chain Link Fences and Gates | Jul-2006 | D | Superseded by UFGS 32 31 13 Chain Link Fences and Gates and UFGS 32 31 13.53 High-Security Chain Link Fences and Gates Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
| Jan-2008 | S | UFGS 32 31 13.00 40 Chain Link Fences and Gates | Jul-2007 | D | Superseded by UFGS 32 31 13 Chain Link Fences and Gates and UFGS 32 31 13.53 High-Security Chain Link Fences and Gates Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
| Jan-2008 | A | UFGS 32 31 13.53 High-Security Fences (Chain Link and Ornamental) and Gates | Jan-2008 | N | Superseding UFGS 32 31 00.00 10 Fencing, UFGS 32 31 13.00 20 Chain Link Fences and Gates, and UFGS 32 31 13.00 40 Chain Link Fences and Gates | |
| Jan-2008 | A | UFGS 32 31 26 Wire Fences and Gates | Jan-2008 | N | Superseding UFGS 32 3100.00 10 Fencing | |
| Jan-2008 | S | UFGS 33 32 13.13 40 Packaged Sewage Lift Stations, Wet Well Type | Jul-2007 | D | Section renumbered to 33 32 13.13 with no title change Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
| Jan-2008 | S | UFGS 33 32 13.13 Packaged Sewage Lift Stations, Wet Well Type | Jan-2008 | N | Section renumbered/superseding UFGS 33 32 13.13 40 with no title change | |
| Jan-2008 | N | UFGS 33 32 13.14 Packaged Sewage Lift Stations, Grinder Pump Type | Jan-2008 | N | New section superseding, in part, UFGS 33 32 16.13 Package [Grinder Pump] [Lift] Station | |
| Jan-2008 | N | UFGS 33 32 16.13 Package [Grinder Pump] [Lift] Station | Apr-2006 | D | Superseded by UFGS 33 32 13.13 Packaged Sewage Lift Stations, Grinder Pump Type Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
| Jan-2008 | A | UFGS 33 40 00 Stormwater Utilities | Jan-2008 | N | Superseding UFGS 33 40 01 Storm Drainage and UFGS 33 40 00.00 40 Storm Drainage Utilities | |
| Jan-2008 | S | UFGS 33 40 00.00 40 Storm Drainage Utilities | Apr-2007 | D | Renumbered/Superseded by UFGS 33 40 00 Storm Drainage Utilities Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
| Jan-2008 | A | UFGS 33 40 01 Storm Drainage | Jul-2006 | D | Renamed UFGS 33 40 00 Storm Drainage Utilities Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
| Jan-2008 | A | UFGS 33 56 10 Factory-Fabricated Fuel Storage Tanks | Jan-2008 | N | Superseding UFGS 23 10 00 Fuel Storage Systems and UFGS 33 56 13 Aboveground Fuel Oil Storage Tanks, and UFGS 33 56 16 Underground Petroleum Tanks | |
| Jan-2008 | N | UFGS 33 56 13 Aboveground Fuel Oil Storage Tanks | Apr-2006 | D | Superseded by UFGS 33 56 10 Factory-Fabricated Fuel Storage Tanks Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
| Jan-2008 | N | UFGS 33 56 16 Underground Petroleum Tanks | Apr-2006 | D | Superseded by UFGS 33 56 10 Factory-Fabricated Fuel Storage Tanks Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
| Jan-2008 | A | UFGS 33 60 00.00 10 Central High Temperature Water (HTW) Generating Plant and Auxiliaries | Jan-2008 | R | Incorporated EPAct05 requirements | |
| Jan-2008 | A | UFGS 35 20 16.33 Hydraulic Miter Gates | Jan-2008 | R | Compliance with CSI SectionFormat | |
| Jan-2008 | A | UFGS 35 20 16.39 Hydraulic Sector Gates | Jan-2008 | R | Compliance with CSI SectionFormat | |
| Jan-2008 | A | UFGS 35 20 16.46 Hydraulic Tainter Gates and Anchorages | Jan-2008 | R | Compliance with CSI SectionFormat | |
| Jan-2008 | A | UFGS 35 20 16.53 Hydraulic Vertical Lift Gates | Jan-2008 | R | Compliance with CSI SectionFormat | |
| Jan-2008 | A | UFGS 35 20 16.59 Closure Gates | Jan-2008 | R | Compliance with CSI SectionFormat | |
| Jan-2008 | A | UFGS 35 20 20 Electrical Equipment for Gate Hoist | Jan-2008 | R | Compliance with CSI SectionFormat | |
| Jan-2008 | A | UFGS 35 31 19 Stone, Channel, Shoreline/Coastal Protection for Structures | Jan-2008 | R | Compliance with CSI SectionFormat | |
| Jan-2008 | A | UFGS 35 31 19.20 Articulating Concrete Block Revetments | Jan-2008 | R | Compliance with CSI SectionFormat | |
| Jan-2008 | A | UFGS 35 41 00 Levee Construction | Jan-2008 | R | Compliance with CSI SectionFormat | |
| Jan-2008 | A | UFGS 35 42 34 Reinforced Soil Slope | Jan-2008 | R | Compliance with CSI SectionFormat | |
| Jan-2008 | N | UFGS 35 59 13.16 Extruded and Molded Marine Fenders | Jan-2008 | R | Changes made to paras 1.3, 1.4.2g, 2.2.7, 2.3.1, 2.3.4.1, 2.3.4.2, 2.3.6 | |
| Jan-2008 | A | UFGS 35 73 13 Embankment for Earth and Rockfill Dams | Jan-2008 | R | Compliance with CSI SectionFormat | |
| Jan-2008 | A | UFGS 41 22 15.00 10 Overhead Electric Cranes | Jan-2008 | R | Compliance with CSI SectionFormat | |
| Jan-2008 | A | UFGS 41 22 23.19 10 Monorails with Electric, Air, or Manual Powered Hoist | Jan-2008 | R | Compliance with CSI SectionFormat | |
| Jan-2008 | A | UFGS 41 24 26 Hydraulic Power Systems | Jan-2008 | R | Compliance with CSI SectionFormat | |
| Jan-2008 | A | UFGS 41 24 27.00 10 Hydraulic Power Systems for Civil Works Structures | Jan-2008 | R | Compliance with CSI SectionFormat | |
| Jan-2008 | A | UFGS 41 36 30.00 10 Ultrasonic Inspection of Plates | Jan-2008 | R | Compliance with CSI SectionFormat | |
| Jan-2008 | A | UFGS 41 65 10.00 10 [Diesel] [Natural Gas] Fueled Engine Pump Drives | Jan-2008 | R | Compliance with CSI SectionFormat | |
| Jan-2008 | A | UFGS 43 11 00 Fans/Blowers/Pumps; Off-Gas | Jan-2008 | R | Incorporated EPAct05 requirements | |
| Jan-2008 | A | UFGS 43 21 13 Pumps: Water, Centrifugal | Jan-2008 | R | Incorporated EPAct05 requirements | |
| Jan-2008 | A | UFGS 43 21 39 Pumps: Water, Vertical Turbine | Jan-2008 | R | Incorporated EPAct05 requirements | |
| Jan-2008 | A | UFGS 43 32 76 Chlorine-Feeding Machines (Automatic, Semiautomatic and Manual) | Jan-2008 | R | Compliance with CSI SectionFormat | |
| Oct-2007 | N | UFGS 00 73 03 Supplementary Conditions for Azores Projects | Oct-2007 | R | Renumbered paragraphs | |
| Oct-2007 | S | UFGS 01 31 19.00 40 | Apr-2006 | D | Redundant, section deleted. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
| Oct-2007 | N | UFGS 01 35 29 Safety and Occupational Health Requirements | Oct-2007 | R | Corrected organization in reference article | |
| Oct-2007 | A | UFGS 01 45 35 Special Inspections | Oct-2007 | R | Updated seismic criteria | |
| Oct-2007 | A | UFGS 01 50 00 Temporary Construction Facilities and Controls | Oct-2007 | N | Superseding UFGS 01 50 00.00 20 Temporary Facilities and Controls, UFGS 01 50 00.00 40 Temporary Facilities and Controls, and UFGS 01 50 02.00 10 Temporary Construction Facilities | |
| Oct-2007 | N | UFGS 01 50 00.00 20 Temporary Facilities and Controls | Apr-2006 | D | Superseded by UFGS 01 50 00 Temporary Construction Facilities and Controls. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
| Oct-2007 | S | UFGS 01 50 00.00 40 Temporary Facilities and Controls | Apr-2006 | D | Superseded by UFGS 01 50 00 Temporary Construction Facilities and Controls. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
| Oct-2007 | A | UFGS 01 50 02.00 10 Temporary Construction Facilities | Apr-2006 | D | Superseded by UFGS 01 50 00 Temporary Construction Facilities and Controls. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
| Oct-2007 | A | UFGS 02 51 13 Precipitation/Coagulation/Flocculation Water Treatment | Oct-2007 | R | Updated seismic criteria | |
| Oct-2007 | A | UFGS 02 53 16 Remediation of Contaminated Soils By Thermal Desorption | Oct-2007 | R | Updated seismic criteria | |
| Oct-2007 | A | UFGS 02 54 20 Bioremediation of Soils Using Landfarming Systems | Oct-2007 | R | Updated seismic criteria | |
| Oct-2007 | A | UFGS 02 54 21 Bioremediation of Soils Using Windrow Composting | Oct-2007 | R | Updated seismic criteria | |
| Oct-2007 | A | UFGS 02 56 13 Waste Containment Geomembrane | Oct-2007 | R | Updated seismic criteria | |
| Oct-2007 | A | UFGS 02 62 16 Commissioning and Demonstration for Soil Vapor Extraction (SVE) Systems | Oct-2007 | R | Updated seismic criteria | |
| Oct-2007 | A | UFGS 03 20 01.00 10 Concrete Reinforcement | Oct-2007 | R | Updated seismic criteria | |
| Oct-2007 | A | UFGS 03 41 33.00 10 Precast/Prestressed Concrete Floor and Roof Units | Oct-2007 | R | Updated seismic criteria | |
| Oct-2007 | A | UFGS 03 41 36.00 10 Precast Roof Decking | Oct-2007 | R | Updated seismic criteria | |
| Oct-2007 | A | UFGS 03 51 00 Roof Decking, Cast-in-Place Low Density Concrete | Oct-2007 | R | Updated seismic criteria | |
| Oct-2007 | A | UFGS 04 01 20 Rehabilitation of Reinforced and Unreinforced Masonry Walls Using FRP Composite Structural Repointing | Oct-2007 | R | Updated seismic criteria | |
| Oct-2007 | A | UFGS 04 01 21 Rehabilitation of Reinforced and Unreinforced Masonry Walls Using Surface Applied FRP Composites | Oct-2007 | R | Updated seismic criteria |