Status
Active
View/Download
Publish Date
Pages
31
Spec. Division
08 - Openings
CCR

History: Below is a listing of the Revisions and Changes made to this UFGS.

KEYPREPARING ACTIVITY (PA)A ArmyN NavyF Air ForceS NASA [ARCHIVED]
ACTIONN NewR RevisionC ChangeD Deletion
Release PA Action Change # Nature of Change or Revision
Feb-2022 N C 4 In response to the following: CCR 9281, the Hardware Schedule Table (1.5) has been replaced with a hardware item list and a hardware schedule list; CCR 10303, deleted Texture paragraph (2.3.12.3) as it does not apply.
Aug-2020 N C 3 In response to CCR 4895, the Specifier Note in "Locks and Latches" (2.3.5) has been revised to reflect the latest door locking system specified in the Unaccompanied Housing FC.
Nov-2018 N C 2 Added requirements for hinges, locks and locksets, exit devices, closers, and finishes in humid and ESC C3-C5 locations.
Nov-2017 N C 1 In response to CCR 5837 , removed paragraph pertaining to Navy Training Center , Orlando , Florida .
Feb-2016 N R Complete revision; revised throughout to incorporate CCRs 4818, 1613, 3999, 2450, 2451, 2762, 1612, 3384, and 3386; update format and editorial changes
Aug-2008 N R Added requirement for Keying Meeting and added para 2.3.1.1
Oct-2007 N R Corrected paragraph entitled "Texture."
Jul-2006 N R Added NASA requirements