Below is a listing of the Revisions and Changes made to UFGS Sections for each release. You can narrow the list by selecting a UFGS Release date from the drop-down and clicking 'Apply'.
KEY | PREPARING ACTIVITY (PA) | A Army | N Navy | F Air Force | S NASA [ARCHIVED] |
---|---|---|---|---|---|
ACTION | N New | R Revision | C Change | D Deletion |
Release | PA | UFGS Section | Date | Action | Change # | Nature of Change or Revision |
---|---|---|---|---|---|---|
Apr-2007 | N | UFGS 23 09 23.13 20 BACnet Direct Digital Control Systems for HVAC | Apr-2007 | R | Revised definitions, added guidance for BACnet Testing Labs (BTL) certification | |
Apr-2007 | F | UFGS 23 14 00 Commissioning of Fuel Facility Systems | Apr-2007 | N | New section | |
Apr-2007 | S | UFGS 23 23 16.00 40 Refrigerant Piping Specialties | Apr-2007 | R | Reference Update | |
Apr-2007 | S | UFGS 23 52 00.00 40 Heating Boilers | Apr-2007 | R | Reference Update | |
Apr-2007 | S | UFGS 23 74 33.00 40 Small HVAC Units, Cooling-Only, Recirculating, Split and Unitary for Window and Floor Mounting | Apr-2007 | R | Reference Update | |
Apr-2007 | S | UFGS 23 81 43.00 40 Air-Source Unitary Heat Pumps | Apr-2007 | R | Reference Update | |
Apr-2007 | N | UFGS 26 11 13 Secondary Unit Substations | Apr-2006 | D | Superseded by UFGS 26 11 16 Secondary Unit Substations Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
Apr-2007 | N | UFGS 26 11 13.00 20 Primary Unit Substation | Apr-2007 | N | Superseding UFGS 26 11 16.00 20 Primary Unit Substations | |
Apr-2007 | N | UFGS 26 11 16 Secondary Unit Substations | Apr-2007 | N | Superseding UFGS 26 11 13 Secondary Unit Substations | |
Apr-2007 | N | UFGS 26 11 16.00 20 Primary Unit Substations | Apr-2006 | D | Superseded by UFGS 26 11 13.00 20 Primary Unit Substations Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
Apr-2007 | N | UFGS 26 32 13.00 20 Single Operation Generator Sets | Apr-2007 | R | Section note revised to add Capital Improvements requirements | |
Apr-2007 | S | UFGS 26 51 13.09 40 Fluorescent Luminaries | Apr-2007 | R | Reference Update | |
Apr-2007 | S | UFGS 26 56 19.00 40 Roadway Lighting | Apr-2007 | R | Reference Update | |
Apr-2007 | S | UFGS 28 05 26.00 40 Grounding and Bonding for Electrical Systems | Apr-2007 | R | Reference Update | |
Apr-2007 | S | UFGS 28 33 00.00 40 Fuel-Gas Detection and Alarm | Apr-2007 | R | Reference Update | |
Apr-2007 | A | UFGS 32 12 15 Hot-Mix Asphalt (HMA) for Airfields | Apr-2007 | R | VMA and joints | |
Apr-2007 | S | UFGS 33 40 00.00 40 Storm Drainage Utilities | Apr-2007 | R | Reference Update | |
Apr-2007 | N | UFGS 33 52 90.00 20 Welding for POL Service Piping | Apr-2007 | N | New section; NOTE this will be superseded by USACE-prepared unified section when published. | |
Apr-2007 | A | UFGS 33 56 17 Tightness Testing of Existing Underground Fuel Systems | Apr-2006 | D | Superseded by UFGS 33 59 00 Tightness Testing of Existing Underground Fuel Systems Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
Apr-2007 | A | UFGS 33 58 00 Leak Detection for Fueling Systems | Apr-2007 | N | New section | |
Apr-2007 | A | UFGS 33 59 00 Tightness Testing of Existing Underground Fuel Systems | Apr-2007 | N | Technical Update, Superseding UFGS 33 56 17 Tightness Testing of Existing Underground Fuel Systems | |
Apr-2007 | S | UFGS 33 71 49 23.40 Underground Medium Voltage Wiring | Jan-2007 | D | Superseded by UFGS 33 71 02.00 20 Underground Electrical Distribution Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
Apr-2007 | S | UFGS 42 22 00.00 40 Process Chillers and Coolers | Apr-2007 | R | Reference Update | |
Feb-2007 | A | UFGS 21 30 00 Fire Pumps | Feb-2007 | R | INTERIM RELEASE: Corrected metric conversion | |
Feb-2007 | A | UFGS 23 07 00 Thermal Insulation for Mechanical Systems | Feb-2007 | R | INTERIM RELEASE: Corrected permeability | |
Feb-2007 | N | UFGS 33 71 02.00 20 Underground Electrical Distribution | Feb-2007 | R | INTERIM RELEASE: Added requirement for immersible piping | |
Jan-2007 | N | UFGS 00 01 15 List of Drawings | Jan-2007 | R | No Nature of Change statement provided. | |
Jan-2007 | N | UFGS 00 22 13 Supplementary Instructions to Bidders | Jan-2007 | R | No Nature of Change statement provided. | |
Jan-2007 | N | UFGS 00 41 00 Bid Schedules | Jan-2007 | R | No Nature of Change statement provided. | |
Jan-2007 | A | UFGS 01 32 01.00 10 Project Schedule | Jan-2007 | R | Added Design-Build tailoring option | |
Jan-2007 | N | UFGS 01 32 17.00 20 Cost-Loaded Network Analysis Schedules (NAS) | Jan-2007 | R | Deleted [DESIGN BUILD] from the title and Design-Build requirements from the section. | |
Jan-2007 | N | UFGS 01 32 17.00 20 Cost-Loaded Network Analysis Schedules (NAS) | Jan-2007 | R | Deleted [DESIGN BUILD] from the title and Design-Build requirements from the section. | |
Jan-2007 | N | UFGS 01 45 00.00 20 Quality Control | Jan-2007 | R | Removed reference to UFGS 01 99 00 in paragraph Commissioning (1.4.1) | |
Jan-2007 | N | UFGS 01 58 00 Project Identification | Jan-2007 | R | Revised link to NAVFAC logo | |
Jan-2007 | A | UFGS 01 74 19 Construction Waste Management and Disposal | Jan-2007 | R | Added sustainable design language | |
Jan-2007 | S | UFGS 02 41 00.00 40 Demolition | Jun-2006 | D | Superseded by UFGS 02 41 00 [Demolition][ and ][Deconstruction] (Preparing Activity: Army) Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
Jan-2007 | S | UFGS 03 30 00.00 40 Cast-in-Place Concrete | Jan-2007 | R | Section References (SRF) update | |
Jan-2007 | S | UFGS 03 41 33.00 40 Precast Structural Pretensioned Concrete | Jan-2007 | R | Section References (SRF) update | |
Jan-2007 | S | UFGS 05 21 00.00 40 Steel Joist Framing | Oct-2006 | D | Information already provided in UFGS 05 21 00.00 20 Steel Joists[ and Joist Girders] and UFGS 05 21 02.00 10 Steel Joists Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
Jan-2007 | N | UFGS 07 16 19 Metallic Oxide Waterproofing | Jan-2007 | R | No Nature of Change statement provided. | |
Jan-2007 | N | UFGS 07 22 00 Roof and Deck Insulation | Jan-2007 | R | Incorporated NASA requirements | |
Jan-2007 | N | UFGS 07 51 13 Built-Up Asphalt Roofing | Jan-2007 | R | Title changed from Asphalt Built-Up Roofing; Incorporated NASA requirements; Superseding 07 51 13.13 40 Cold Applied Built-Up Asphalt Roofing | |
Jan-2007 | S | UFGS 07 51 13.13 40 Cold Applied Built-Up Asphalt Roofing | Oct-2006 | D | Superseded by 07 51 13 Built-Up Asphalt Roofing (Preparing Activity: Navy) Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
Jan-2007 | N | UFGS 07 52 00 Modified Bituminous Membrane Roofing | Jan-2007 | R | Incorporated NASA requirements | |
Jan-2007 | S | UFGS 07 52 00.00 40 Modified Bituminous Membrane Protection | Oct-2006 | D | Superseded by UFGS 07 52 00 Modified Bituminous Membrane Roofing (Preparing Activity: Navy) Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
Jan-2007 | S | UFGS 07 53 00.00 40 Elastomeric Membrane Roofing | Oct-2006 | D | Superseded by UFGS 07 53 23 Ethylene-Propylene-Diene Monomer Roofing (Preparing Activity: Navy) Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
Jan-2007 | N | UFGS 07 53 23 Ethylene-Propylene-Diene-Monomer Roofing | Jan-2007 | N | New section; Incorporated NASA requirements | |
Jan-2007 | N | UFGS 07 55 23 Ethylene Propylene Diene Monomer (EPDM) Roofing Membrane | Jul-2006 | D | Superseded by UFGS 07 53 23 Ethylene-Propylene-Diene Monomer Roofing Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
Jan-2007 | N | UFGS 07 60 00 Flashing and Sheet Metal | Jan-2007 | R | Incorporated NASA Requirements | |
Jan-2007 | S | UFGS 07 60 00.00 40 Flashing and Sheet Metal | Oct-2006 | D | Superseded by UFGS 07 60 00 Flashing and Sheet Metal (Preparing Activity: Navy) Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
Jan-2007 | N | UFGS 07 92 00 Joint Sealants | Jan-2007 | R | Incorporated NASA requirements | |
Jan-2007 | N | UFGS 08 11 73 Sliding Fire Doors | Jan-2007 | R | No Nature of Change statement provided. | |
Jan-2007 | S | UFGS 08 13 73.00 40 Sliding Metal Doors | Jan-2007 | R | Section References (SRF) update | |
Jan-2007 | A | UFGS 09 30 00 Ceramic Tile, Quarry Tile, and Paver Tile | Jan-2007 | R | Added sustainable design language | |
Jan-2007 | A | UFGS 09 65 00 Resilient Flooring | Jan-2007 | R | Added sustainable design language | |
Jan-2007 | A | UFGS 09 68 00 Carpeting | Jan-2007 | R | Added sustainable design language | |
Jan-2007 | N | UFGS 09 97 13.16 Interior Coating of Welded Steel Water Tanks | Jan-2007 | R | Extensive rewrite. | |
Jan-2007 | N | UFGS 09 97 13.17 Three Coat Epoxy Interior Coating of Welded Steel Petroleum Fuel Tanks | Jan-2007 | R | Extensive rewrite | |
Jan-2007 | N | UFGS 09 97 13.27 High Performance Coating for Steel Structures | Jan-2007 | R | Extensive rewrite | |
Jan-2007 | A | UFGS 10 21 13 Toilet Compartments | Jan-2007 | R | Added sustainable design language | |
Jan-2007 | S | UFGS 10 22 00.00 40 Partitions | Jun-2006 | D | Information already provided in UFGS 10 22 13 Wire Mesh Partitions, UFGS 10 22 19 Demountable and Movable Partitions, UFGS 10 22 26 Operable Partitions, and UFGS 10 22 26.13 Accordion Folding Partitions Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
Jan-2007 | S | UFGS 10 22 13.00 40 Wire Mesh Partitions | Apr-2006 | D | Information already provided in UFGS 10 22 13 Wire Mesh Partitions Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
Jan-2007 | S | UFGS 10 22 19.53 40 Demountable Gypsum Partitions | Jun-2006 | D | Information already provided in UFGS 10 22 19 Demountable Movable Partitions Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
Jan-2007 | S | UFGS 10 22 26.13 40 Accordion-Folding Partitions | Oct-2006 | D | Information already provided in UFGS 10 22 26 Operable Partitions and UFGS 10 22 26.13 Accordion Folding Partitions Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
Jan-2007 | S | UFGS 11 13 19.13 40 Loading Dock Levelers | Jun-2006 | D | Superseded by UFGS 11 13 10 Dock Levelers Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
Jan-2007 | A | UFGS 12 50 00 Furniture Systems | Jan-2007 | R | Added sustainable design language | |
Jan-2007 | S | UFGS 13 50 00.00 40 Special Instrumentation | Jan-2007 | R | Section References (SRF) update | |
Jan-2007 | S | UFGS 14 21 00.00 40 Electric Traction Elevators | Oct-2006 | D | Information already provided in UFGS 14 20 00 Elevators, Electric and UFGS 14 21 00.00 20 Electric Traction Elevators Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
Jan-2007 | N | UFGS 22 00 00 Plumbing, General Purpose | Jan-2007 | R | Revised non-water use urinals | |
Jan-2007 | S | UFGS 22 00 00.00 40 Plumbing | Jun-2006 | D | Superseded by UFGS 22 00 00 Plumbing, General Purpose Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
Jan-2007 | A | UFGS 22 04 00.00 10 Plumbing, Hospital | Jan-2007 | R | Added non-water using urinal | |
Jan-2007 | S | UFGS 22 41 00.00 40 Residential Plumbing Fixtures | Oct-2006 | D | Superseded by UFGS 22 42 00.00 40 Commercial Plumbing Fixtures Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
Jan-2007 | S | UFGS 22 42 00.00 40 Commercial Plumbing Fixtures | Jan-2007 | N | Superseding UFGS 22 41 00.00 40 Residential Plumbing Fixtures | |
Jan-2007 | N | UFGS 23 03 00.00 20 Basic Mechanical Materials and Methods | Jan-2007 | R | No Nature of Change statement provided. | |
Jan-2007 | A | UFGS 23 07 00 Thermal Insulation for Mechanical Systems | Jan-2007 | R | Added jacketing system | |
Jan-2007 | N | UFGS 23 09 23.13 20 BACnet Direct Digital Control Systems for HVAC | Jan-2007 | N | Superseding UFGS 23 09 54.00 20 Direct Digital Control Systems | |
Jan-2007 | N | UFGS 23 09 54.00 20 Direct Digital Control Systems | Apr-2006 | D | Superseded by UFGS 23 09 23.13 20 BACnet Direct Digital Control Systems for HVAC Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
Jan-2007 | S | UFGS 23 55 13.00 40 Fuel-Fired Duct Heaters | Jan-2007 | R | Section References (SRF) update | |
Jan-2007 | S | UFGS 23 61 00.00 40 Refrigerant Compressors | Jun-2006 | D | Information already provided in the following sections: UFGS 23 63 00.00 10 Cold Storage Refrigeration Systems, 23 66 00.00 20 Central Refrigeration Equipment For Air Conditioning, 23 69 00.00 20 Refrigeration Equipment For Cold Storage, and 23 82 02.00 10 Unitary Heating Cooling Equipment Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
Jan-2007 | N | UFGS 23 64 26 Chilled, Chilled-Hot, and Condenser Water Piping Systems | Jan-2007 | R | Added note "Not for use in Navy projects" to paragraphs 'Piping for Steam and Condensate' (2.3) and 'Piping for High-Pressure Compressed-Air Systems' (2.4) | |
Jan-2007 | S | UFGS 23 73 00.00 40 Indoor Central-Station Air-Handling Units | Jun-2006 | D | Information already provided in UFGS 23 34 16.00 20 Air Handling Units Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
Jan-2007 | S | UFGS 23 73 33.00 40 Indoor Indirect Fuel-Fired Heating and Ventilating Units | Jun-2006 | D | Information already provided in UFGS 23 82 01.00 10 Warm Air Heating Systems Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
Jan-2007 | S | UFGS 23 81 23.00 40 Computer-Room Air-Conditioners | Jun-2006 | D | Information already provided in UFGS 23 81 23.00 20 Computer Room Air Conditioning Units Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
Jan-2007 | N | UFGS 23 81 46.00 20 Water Source Heat Pump Systems | Jul-2006 | D | Superseded by UFGS 23 81 47 Water-Loop and Ground-Loop Heat Pump Systems Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
Jan-2007 | N | UFGS 23 81 47 Water-Loop and Ground-Loop Heat Pump Systems | Jan-2007 | R | Title changed from Vertical Ground-Coupled Heat Exchange Systems; Superseding UFGS 23 81 46.00 20 Water Source Heat Pump Systems (requirements incorporated) | |
Jan-2007 | S | UFGS 26 00 00.00 40 Electrical | Oct-2006 | D | Information already provided in UFGS 26 05 00.00 40 Common Work Results for Electrical and UFGS 26 00 00.00 20 Basic Electrical Materials and Methods Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
Jan-2007 | S | UFGS 26 05 13.00 10 Medium-Voltage Cables | Jan-2007 | R | Section References (SRF) update | |
Jan-2007 | N | UFGS 26 05 33 Dockside Power Connection Stations | Jan-2007 | R | Title changed from 480 V Pier Power Outlet Assemblies; No Nature of Change statement provided. | |
Jan-2007 | S | UFGS 26 09 23.00 40 Lighting Control Devices | Jan-2007 | R | Section References (SRF) update | |
Jan-2007 | S | UFGS 26 11 13.00 40 Primary Unit Substations | Jun-2006 | D | Information already provided in UFGS 26 11 16.00 20 Primary Unit Substations Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
Jan-2007 | S | UFGS 26 11 16.00 40 Secondary Unit Substations | Jun-2006 | D | Information already provided in UFGS 26 11 13 Secondary Unit Substations Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
Jan-2007 | S | UFGS 26 12 00.00 40 Medium-Voltage Transformers | Jan-2007 | R | Section References (SRF) update | |
Jan-2007 | S | UFGS 26 18 23.00 40 Medium-Voltage Surge Arresters | Jan-2007 | R | Section References (SRF) update | |
Jan-2007 | S | UFGS 26 18 39.00 40 Medium-Voltage Controllers | Jan-2007 | R | Section References (SRF) update | |
Jan-2007 | S | UFGS 26 24 16.00 40 Panelboards | Jan-2007 | R | Section References (SRF) update | |
Jan-2007 | S | UFGS 26 24 16.00 40 Panelboards | Jan-2007 | R | Section References (SRF) updated | |
Jan-2007 | S | UFGS 26 24 19.00 40 Motor-Control Centers | Jan-2007 | R | Section References (SRF) update | |
Jan-2007 | S | UFGS 26 27 26.00 40 Wiring Devices | Jan-2007 | R | Section References (SRF) update | |
Jan-2007 | S | UFGS 26 27 26.00 40 Wiring Devices | Jan-2007 | R | Section References (SRF) update | |
Jan-2007 | S | UFGS 26 28 16.00 40 Enclosed Switches and Circuit Breakers | Jan-2007 | R | Section References (SRF) update |