Aug-2008 |
S
|
UFGS 26 05 73.00 40 Overcurrent Protective Devices |
Aug-2008 |
R
|
|
Section References (SRF) update |
Aug-2008 |
N
|
UFGS 26 08 00 Apparatus Inspection and Testing |
Aug-2008 |
R
|
|
Deleted reference to L-16303, changed Transmission Distribution to Electrical Distribution |
Aug-2008 |
S
|
UFGS 26 18 23.00 40 Medium-Voltage Surge Arresters |
Aug-2008 |
R
|
|
Minor Edits |
Aug-2008 |
N
|
UFGS 26 20 00 Interior Distribution System |
Aug-2008 |
R
|
|
Deleted reference to L-16303 and note, changed Transmission Distribution to Electrical Distribution |
Aug-2008 |
S
|
UFGS 26 26 00.00 40 Power Distribution Units |
Aug-2008 |
R
|
|
Section References (SRF) update |
Aug-2008 |
S
|
UFGS 26 26 00.00 40 Power Distribution Units |
Aug-2008 |
R
|
|
Section References (SRF) update |
Aug-2008 |
S
|
UFGS 26 27 26.00 40 Wiring Devices |
Jul-2007 |
D
|
|
Redundant to UFGS 26 05 00 Common Work Results for Electrical |
Aug-2008 |
S
|
UFGS 26 28 16.00 40 Enclosed Switches and Circuit Breakers |
Jul-2007 |
D
|
|
Superseded by UFGS 26 28 21.00 40 Automatic Transfer Switches |
Aug-2008 |
S
|
UFGS 26 28 21.00 40 Automatic Transfer Switches |
Aug-2008 |
N
|
|
Superseding UFGS 26 28 16.00 40 Enclosed Switches and Circuit Breakers; Minor Edits |
Aug-2008 |
S
|
UFGS 26 35 33 Power Factor Correction Equipment |
Apr-2008 |
D
|
|
Renumbered/ Superseded by UFGS 26 35 33.00 40 with same title |
Aug-2008 |
S
|
UFGS 26 35 33.00 40 Power Factor Correction Equipment |
Aug-2008 |
N
|
|
Renumbered; Superseding UFGS 26 35 33 with same title |
Aug-2008 |
S
|
UFGS 26 51 13.09 40 Fluorescent Luminaries |
Apr-2007 |
D
|
|
Superseded by UFGS 26 51 00 Interior Lighting (Preparing Activity NAVFAC) |
Aug-2008 |
S
|
UFGS 26 53 00 Exit Signs |
Aug-2008 |
N
|
|
Renumbered; Superseding UFGS 26 53 00.00 40 with same title |
Aug-2008 |
S
|
UFGS 26 53 00.00 40 Exit Signs |
Jan-2007 |
D
|
|
Renumbered/ Superseded by UFGS 26 53 00 with same title |
Aug-2008 |
S
|
UFGS 26 54 00.00 40 Classified, Special Purpose, Exterior Lighting |
Jul-2007 |
D
|
|
Section no longer required; Information is covered in other UFGS sections |
Aug-2008 |
S
|
UFGS 26 60 13 Low-Voltage Motors |
Jul-2007 |
D
|
|
NASA reclassified this as fifth level; Renumbered/ Superseded by UFGS 26 60 13.00 40 with no title change |
Aug-2008 |
S
|
UFGS 26 60 13.00 40 Low-Voltage Motors |
Aug-2008 |
N
|
|
Renumbered; Superseding UFGS 26 60 13 with same title |
Aug-2008 |
S
|
UFGS 27 05 28.36 40 Cable Trays for Communications Systems |
Jul-2007 |
D
|
|
Renumbered/ Superseded by UFGS 27 05 28.36 with same title |
Aug-2008 |
S
|
UFGS 27 05 28.36 Cable Trays for Communications Systems |
Aug-2008 |
N
|
|
Renumbered; Superseding UFGS 27 05 28.36 40 with same title; Minor Edits |
Aug-2008 |
N
|
UFGS 27 31 00.00 20 Administrative Telephone Equipment, Inside Plant |
Apr-2006 |
D
|
|
Deleted with no superseding section |
Aug-2008 |
S
|
UFGS 28 05 26 Grounding and Bonding for Electronic Safety and Security |
Jan-2008 |
D
|
|
Superseded by reinstated NASA section UFGS 28 05 26.00 40 with same title |
Aug-2008 |
S
|
UFGS 28 05 26.00 40 Grounding and Bonding for Electrical Systems |
Aug-2008 |
N
|
|
Reinstated NASA section; Renumbered/ Superseding UFGS 28 05 26 with same title; Section References (SRF) update |
Aug-2008 |
S
|
UFGS 28 33 00.00 40 Fuel-Gas Detection and Alarm |
Aug-2008 |
R
|
|
Minor Edits |
Aug-2008 |
A
|
UFGS 31 00 00 Earthwork |
Aug-2008 |
R
|
|
Compliance with CSI SectionFormat |
Aug-2008 |
A
|
UFGS 31 05 19 Geotextile |
Aug-2008 |
R
|
|
Compliance with CSI SectionFormat |
Aug-2008 |
A
|
UFGS 31 05 20 Geosynthetic Drainage Layer |
Aug-2008 |
R
|
|
Compliance with CSI SectionFormat |
Aug-2008 |
A
|
UFGS 31 05 21 Geogrid Soil Reinforcement |
Aug-2008 |
R
|
|
Compliance with CSI SectionFormat |
Aug-2008 |
A
|
UFGS 31 05 22 Geotextiles Used as Filters |
Aug-2008 |
R
|
|
Compliance with CSI SectionFormat |
Aug-2008 |
A
|
UFGS 31 10 00 Site Clearing |
Aug-2008 |
R
|
|
Compliance with CSI SectionFormat |
Aug-2008 |
A
|
UFGS 31 11 00 Clearing and Grubbing |
Aug-2008 |
R
|
|
Compliance with CSI SectionFormat |
Aug-2008 |
A
|
UFGS 31 21 00 Off-Gassing Mitigation |
Aug-2008 |
R
|
|
Compliance with CSI SectionFormat |
Aug-2008 |
A
|
UFGS 31 31 16 Soil Treatment for Subterranean Termite Control |
Aug-2008 |
R
|
|
Compliance with CSI SectionFormat |
Aug-2008 |
A
|
UFGS 31 31 16.21 Mesh Termite Barrier |
Aug-2008 |
R
|
|
Compliance with CSI SectionFormat |
Aug-2008 |
A
|
UFGS 31 32 11 Soil Surface Erosion Control |
Aug-2008 |
R
|
|
Compliance with CSI SectionFormat |
Aug-2008 |
A
|
UFGS 31 32 23 Foundation Drilling and Grouting |
Aug-2008 |
R
|
|
Compliance with CSI SectionFormat |
Aug-2008 |
A
|
UFGS 31 32 39 Bioengineering Practices for Stream Bank and Shoreline Stabilization |
Aug-2008 |
R
|
|
Compliance with CSI SectionFormat |
Aug-2008 |
A
|
UFGS 31 36 00 Gabions |
Aug-2008 |
R
|
|
Compliance with CSI SectionFormat |
Aug-2008 |
A
|
UFGS 31 63 26 Drilled Caissons |
Aug-2008 |
N
|
|
Superseding UFGS 31 63 26.00 10 Drilled Foundation Caissons (Piers) and UFGS 31 63 26.16 20 Drilled Foundation Caissons |
Aug-2008 |
A
|
UFGS 31 63 26.00 10 Drilled Foundation Caissons (Piers) |
Oct-2007 |
D
|
|
Superseded by UFGS 31 63 26 Drilled Caissons |
Aug-2008 |
N
|
UFGS 31 63 26.16 20 Drilled Foundation Caissons |
Apr-2006 |
D
|
|
Superseded by UFGS 31 63 26 Drilled Caissons |
Aug-2008 |
A
|
UFGS 32 01 11.52 Runway Rubber Removal |
Aug-2008 |
R
|
|
Compliance with CSI SectionFormat |
Aug-2008 |
A
|
UFGS 32 01 13 Bituminous Seal and Fog Coats |
Aug-2008 |
R
|
|
Compliance with CSI SectionFormat |
Aug-2008 |
A
|
UFGS 32 01 16.17 Cold Milling of Bituminous Pavements |
Aug-2008 |
R
|
|
Compliance with CSI SectionFormat |
Aug-2008 |
A
|
UFGS 32 01 17 Cold-Mix Recycling |
Aug-2008 |
R
|
|
Compliance with CSI SectionFormat |
Aug-2008 |
A
|
UFGS 32 01 17.16 Sealing of Cracks in Bituminous Pavements |
Aug-2008 |
R
|
|
Compliance with CSI SectionFormat |
Aug-2008 |
A
|
UFGS 32 01 19 Field Molded Sealants for Sealing Joints in Rigid Pavements |
Aug-2008 |
R
|
|
Compliance with CSI SectionFormat |
Aug-2008 |
A
|
UFGS 32 01 22 Bituminous Rejuvenation |
Aug-2008 |
R
|
|
Compliance with CSI SectionFormat |
Aug-2008 |
A
|
UFGS 32 01 24 Hot In-Place Recycling of Bituminous Pavements |
Aug-2008 |
R
|
|
Compliance with CSI SectionFormat |
Aug-2008 |
A
|
UFGS 32 01 25 Heater Scarifying of Bituminous Pavements |
Aug-2008 |
R
|
|
Compliance with CSI SectionFormat |
Aug-2008 |
A
|
UFGS 32 01 26.71 Grooving for Airfield Pavements |
Aug-2008 |
R
|
|
Compliance with CSI SectionFormat |
Aug-2008 |
A
|
UFGS 32 01 29.62 Concrete Pavement Raising |
Aug-2008 |
R
|
|
Compliance with CSI SectionFormat |
Aug-2008 |
N
|
UFGS 32 10 00 [Pervious] Bituminous Concrete Pavement |
Aug-2008 |
R
|
|
Section References (SRF) update |
Aug-2008 |
A
|
UFGS 32 11 10 Drainage Layer |
Aug-2008 |
R
|
|
Compliance with CSI SectionFormat |
Aug-2008 |
A
|
UFGS 32 11 16 [Base Course for Rigid] [ and ] [Subbases for Flexible] Paving |
Aug-2008 |
R
|
|
Compliance with CSI SectionFormat |
Aug-2008 |
A
|
UFGS 32 11 23 [Aggregate Base Course] [and][or] [Graded Crushed Aggregate Base Course] for Flexible Paving |
Aug-2008 |
R
|
|
Compliance with CSI SectionFormat |
Aug-2008 |
N
|
UFGS 32 11 24 Graded Crushed Aggregate Base Course for [Pervious] [Flexible] Pavement |
Aug-2008 |
R
|
|
Section References (SRF) update |
Aug-2008 |
A
|
UFGS 32 11 26 Hot-Mix Bituminous Base Course for Roads and Streets |
Aug-2008 |
R
|
|
Compliance with CSI SectionFormat |
Aug-2008 |
A
|
UFGS 32 11 27 Bituminous-Stabilized Base Course, Subbase, or Subgrade |
Aug-2008 |
R
|
|
Compliance with CSI SectionFormat |
Aug-2008 |
A
|
UFGS 32 11 29 Lime-[Stabilized] [Modified] Subgrade |
Aug-2008 |
R
|
|
Compliance with CSI SectionFormat |
Aug-2008 |
N
|
UFGS 32 11 30 Lime Treated Subgrade [Lime Modified Soils] |
Aug-2008 |
R
|
|
Minor revisions throughout |
Aug-2008 |
N
|
UFGS 32 11 33 Cement Stabilized [Base] [Subbase] Course at Airfields and Roads |
Aug-2008 |
R
|
|
Minor revisions throughout |
Aug-2008 |
A
|
UFGS 32 11 34 Portland Cement-Stabilized Base or Subbase Course |
Aug-2008 |
R
|
|
Compliance with CSI SectionFormat |
Aug-2008 |
A
|
UFGS 32 12 10 Bituminous Tack and Prime Coats |
Aug-2008 |
R
|
|
Compliance with CSI SectionFormat |
Aug-2008 |
A
|
UFGS 32 12 11 Bituminous Surface Treatment |
Aug-2008 |
R
|
|
Compliance with CSI SectionFormat |
Aug-2008 |
A
|
UFGS 32 12 16 Hot-Mix Asphalt (HMA) for Roads |
Aug-2008 |
R
|
|
Compliance with CSI SectionFormat |
Aug-2008 |
A
|
UFGS 32 12 18 Resin Modified Pavement Surfacing Material |
Aug-2008 |
R
|
|
Compliance with CSI SectionFormat |
Aug-2008 |
A
|
UFGS 32 12 19 Bituminous Binder and Wearing Courses (Central-Plant Cold-Mix) |
Aug-2008 |
R
|
|
Compliance with CSI SectionFormat |
Aug-2008 |
A
|
UFGS 32 12 20 Porous Friction Course for Airfields and Roads |
Apr-2006 |
D
|
|
Superseded by UFGS 32 12 43.16 with no title change |
Aug-2008 |
A
|
UFGS 32 12 21 Bituminous Road-Mix Surface Course |
Aug-2008 |
R
|
|
Compliance with CSI SectionFormat |
Aug-2008 |
A
|
UFGS 32 12 22.00 10 Polymer Concrete-Micro-Overlay (PCMO) For Fuel and Abrasion Resistant Wearing Surfaces |
Aug-2008 |
R
|
|
Compliance with CSI SectionFormat |
Aug-2008 |
A
|
UFGS 32 12 37 Fuel-Resistant (Coal Tar) Sealer |
Aug-2008 |
R
|
|
Compliance with CSI SectionFormat |
Aug-2008 |
A
|
UFGS 32 12 43.16 Porous Friction Course for Airfields and Roads |
Aug-2008 |
N
|
|
Superseding UFGS 32 12 20 with same title. |
Aug-2008 |
N
|
UFGS 32 13 13.06 Portland Cement Concrete Pavement for Roads and Site Facilities |
Aug-2008 |
R
|
|
Minor revisions throughout |
Aug-2008 |
A
|
UFGS 32 13 17 Stone Matrix Asphalt (SMA) for Airfield Pavements |
Aug-2008 |
R
|
|
Compliance with CSI SectionFormat |
Aug-2008 |
N
|
UFGS 33 05 16 Concrete Poles |
Aug-2008 |
R
|
|
Section References (SRF) update |
Aug-2008 |
N
|
UFGS 33 11 23 Natural Gas and Liquid Petroleum Piping |
Aug-2008 |
N
|
|
Renumbered; Superseding UFGS 33 11 23.00 20 with same title |
Aug-2008 |
N
|
UFGS 33 11 23.00 20 Natural Gas and Liquid Petroleum Piping |
Apr-2006 |
D
|
|
Superseded; Renumbered as UFGS 33 11 23 with no title change |
Aug-2008 |
F
|
UFGS 33 12 33.00 30 Water Meters |
Aug-2008 |
N
|
|
New Section |
Aug-2008 |
A
|
UFGS 33 24 13 Groundwater Monitoring Wells |
Aug-2008 |
R
|
|
Revisions throughout during unification/disassembly of UFGS for MF04 compliance; Title changed from Ground-Water Monitoring Wells |
Aug-2008 |
N
|
UFGS 33 52 90.00 20 Welding for POL Service Piping |
Aug-2008 |
R
|
|
Deleted Table I; Mandatory Minimum Nondestructive Examinations (subpara. i) and tags; Deleted last sentence (subpara j); Deleted Note in 3.2 and Table in 3.2 i |
Aug-2008 |
N
|
UFGS 33 71 02.00 20 Underground Electrical Distribution |
Aug-2008 |
R
|
|
Changed Transmission and Distribution to Electrical Distribution and corrected URL for graphics |
Aug-2008 |
S
|
UFGS 33 71 39.13 40 Overhead High-Voltage Wiring |
Jan-2007 |
D
|
|
Redundant to UFGS 33 71 01 Overhead Transmission and Distribution (Preparing Activity NAVFAC) |
Aug-2008 |
S
|
UFGS 33 73 00.00 40 Utility Transformers |
Aug-2008 |
R
|
|
Minor Edits |
Aug-2008 |
S
|
UFGS 33 75 00.00 40 Switchgear and Protection Devices |
Aug-2008 |
R
|
|
Minor Edits; Title changed from High-Voltage Switchgear and Protection Devices |
Aug-2008 |
S
|
UFGS 33 77 19.00 40 Medium-Voltage Switch |
Aug-2008 |
R
|
|
Minor Edits; Title changed from Gas Medium-Voltage Circuit Breaker |
Aug-2008 |
S
|
UFGS 33 77 36 Medium-Voltage Utility Fuses |
Apr-2008 |
D
|
|
Renumbered/ Superseded by UFGS 33 77 36.00 40 with same title |
Aug-2008 |
S
|
UFGS 33 77 36.00 40 Medium-Voltage Utility Fuses |
Aug-2008 |
N
|
|
Section reinstated and renumbered; Superseding UFGS 33 77 36 with same title |
Aug-2008 |
N
|
UFGS 34 43 00.00 20 Airfield Lighting |
Aug-2008 |
R
|
|
Deleted reference to L-16303 and Note; changed Transmission Distribution to Electrical Distribution; added Part 3.12 |
Aug-2008 |
N
|
UFGS 35 59 13.14 20 Polymeric Piles |
Aug-2008 |
R
|
|
Added option for warranty length |
Aug-2008 |
N
|
UFGS 35 59 13.14 20 Polymeric Piles |
Aug-2008 |
R
|
|
Added option for warranty length, paragraph 2.10 |
Aug-2008 |
N
|
UFGS 35 59 13.16 Extruded and Molded Marine Fenders |
Aug-2008 |
R
|
|
Corrected Submittal (SUB) tags |
Aug-2008 |
S
|
UFGS 40 41 13.13 40 Process Piping Electrical Resistance Heat Tracing |
Jan-2007 |
D
|
|
Superseded by UFGS 23 82 46 Electric Unit Heaters |
Aug-2008 |
N
|
UFGS 41 22 03.13 20 Monorails with Manual Hoists |
Apr-2006 |
D
|
|
Superseded by UFGS 41 22 23.19 Monorail Hoists and UFGS 41 22 13.14 Bridge Cranes, Overhead Electric, Top Running |
Aug-2008 |
N
|
UFGS 41 22 03.16 20 Monorails with Air Motor Powered Hoists |
Apr-2006 |
D
|
|
Superseded by UFGS 41 22 23.19 Monorail Hoists |
Aug-2008 |
S
|
UFGS 42 22 00.00 40 Process Chillers and Coolers |
Aug-2008 |
R
|
|
Section References (SRF) update |
Aug-2008 |
S
|
UFGS 42 22 00.00 40 Process Chillers and Coolers |
Aug-2008 |
R
|
|
Section References (SRF) update |
Aug-2008 |
S
|
UFGS 42 22 13 Centrifugal Process Chillers and Coolers |
Aug-2008 |
N
|
|
Renumbered/ Superseding UFGS 42 22 13.00 40 with same title |
Aug-2008 |
S
|
UFGS 42 22 13.00 40 Centrifugal Process Chillers and Coolers |
Apr-2008 |
D
|
|
Renumbered/ Superseded by UFGS 42 22 13 with no title change |
Aug-2008 |
S
|
UFGS 42 22 16 Reciprocating Process Chillers and Coolers |
Aug-2008 |
N
|
|
Renumbered/ Superseding UFGS 42 22 16.00 40 with same title |
Aug-2008 |
S
|
UFGS 42 22 16.00 40 Reciprocating Process Chillers and Coolers |
Apr-2008 |
D
|
|
Renumbered/ Superseded by UFGS 42 22 16 with no title change |