Below is a listing of the Revisions and Changes made to UFGS Sections for each release. You can narrow the list by selecting a UFGS Release date from the drop-down and clicking 'Apply'.
| KEY | PREPARING ACTIVITY (PA) | A Army | N Navy | F Air Force | S NASA [ARCHIVED] |
|---|---|---|---|---|---|
| ACTION | N New | R Revision | C Change | D Deletion |
| Release | PA | UFGS Section | Date | Action | Change # | Nature of Change or Revision |
|---|---|---|---|---|---|---|
| Aug-2010 | A | UFGS 03 15 00.00 10 Concrete Accessories | Aug-2010 | N | Unified UFGS Sections 03 15 13.00 10 Expansion Joints, Contraction Joints, and Waterstops and 03 15 14.00 10 Expansion, Contraction and Construction Joints in Concrete for Civil Works | |
| Aug-2010 | A | UFGS 03 15 13.00 10 Expansion Joints, Contraction Joints, and Waterstops | Nov-2009 | D | Consolidated with 03 15 14.00 10 Expansion, Contraction and Construction Joints in Concrete for Civil Works; Superseded by UFGS 03 15 00.00 10 Concrete Accessories Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
| Aug-2010 | A | UFGS 03 15 14.00 10 Expansion Contraction and Construction Joints in Concrete for Civil Works | Nov-2009 | D | Consolidated with section 03 15 13.00 10 Expansion Joints, Contraction Joints, and Waterstops; Superseded by UFGS 03 15 00.00 10 Concrete Accessories Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
| Aug-2010 | A | UFGS 03 20 00.00 10 Concrete Reinforcing | Aug-2010 | N | Unified UFGS Sections 03 20 01.00 10 Concrete Reinforcing and 03 20 02 Steel Bars and Welded Wire Fabric for Concrete Reinforcement for Civil Works; named to conform with CSI MF04 | |
| Aug-2010 | A | UFGS 03 20 01.00 10 Concrete Reinforcement | Oct-2007 | D | Consolidated with UFGS Section 03 20 02 Steel Bars and Welded Wire Fabric for Concrete Reinforcement for Civil Works; Superseded by UFGS 03 20 00.00 10 Concrete Reinforcing Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
| Aug-2010 | A | UFGS 03 20 02 Steel Bars and Welded Wire Fabric for Concrete Reinforcement for Civil Works | Nov-2009 | D | Consolidated with UFGS Section 03 20 01.00 10 Concrete Reinforcing; Superseded by UFGS 03 20 00.00 10 Concrete Reinforcing Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
| Aug-2010 | A | UFGS 06 41 16.00 10 Plastic-Laminate-Clad Architectural Cabinets | Aug-2010 | R | Added GEI or SCS certification | |
| Aug-2010 | A | UFGS 06 61 16 Solid Surfacing Fabrications | Aug-2010 | R | Added GEI or SCS certification | |
| Aug-2010 | S | UFGS 06 71 33 Fiberglass Reinforced Plastic (FRP) Ladders | Aug-2010 | R | Closes CCR #3524; other minor revisions throughout | |
| Aug-2010 | N | UFGS 07 21 13 Board and Block Insulation | Aug-2010 | R | Added GEI or SCS certification | |
| Aug-2010 | N | UFGS 07 21 16 Mineral Fiber Blanket Insulation | Aug-2010 | R | Added GEI or SCS certification | |
| Aug-2010 | N | UFGS 07 21 23 Loose Fill Thermal Insulation | Aug-2010 | R | Added GEI or SCS certification | |
| Aug-2010 | N | UFGS 07 22 00 Roof and Deck Insulation | Aug-2010 | R | Added GEI or SCS certification | |
| Aug-2010 | N | UFGS 07 42 63 Fabricated Wall Panel Assemblies | Aug-2010 | R | Added GEI or SCS certification and other minor revisions | |
| Aug-2010 | N | UFGS 07 57 13 Sprayed Polyurethane Foam (SPF) Roofing | Aug-2010 | R | Added GEI or SCS certification | |
| Aug-2010 | N | UFGS 08 14 00 Wood Doors | Aug-2010 | R | Added GEI or SCS certification and other minor revisions | |
| Aug-2010 | S | UFGS 08 41 13 Aluminum-Framed Entrances and Storefronts | Aug-2010 | N | New section | |
| Aug-2010 | N | UFGS 09 23 00 Gypsum Plastering | Aug-2010 | R | Added GEI or SCS certification | |
| Aug-2010 | N | UFGS 09 26 00 Veneer Plaster | Aug-2010 | R | Added GEI or SCS certification | |
| Aug-2010 | N | UFGS 09 29 00 Gypsum Board | Aug-2010 | R | Added GEI or SCS certification and other minor revisions; revised subpart 3.4 | |
| Aug-2010 | A | UFGS 09 30 00 Ceramic Tile, Quarry Tile, and Paver Tile | Aug-2010 | R | Added GEI or SCS certification | |
| Aug-2010 | A | UFGS 09 35 16 Chemical-Resistant Quarry Tiling | Aug-2010 | R | Added GEI or SCS certification | |
| Aug-2010 | A | UFGS 09 51 00 Acoustical Ceilings | Aug-2010 | R | Added GEI or SCS certification; CCRs 3579 and 3580; Revised system | |
| Aug-2010 | N | UFGS 09 64 00 Portable (Demountable) Wood Flooring | Aug-2010 | R | Added GEI or SCS certification | |
| Aug-2010 | A | UFGS 09 64 23 Wood Parquet Flooring | Aug-2010 | R | Added GEI or SCS certification | |
| Aug-2010 | A | UFGS 09 64 29 Wood Strip and Plank Flooring | Aug-2010 | R | Added GEI or SCS certification | |
| Aug-2010 | N | UFGS 09 64 66 Wood Athletic Flooring | Aug-2010 | R | Added GEI or SCS certification | |
| Aug-2010 | A | UFGS 09 65 00 Resilient Flooring | Aug-2010 | R | Added GEI or SCS certification | |
| Aug-2010 | A | UFGS 09 65 33 Conductive Vinyl Flooring | Aug-2010 | R | Added GEI or SCS certification | |
| Aug-2010 | A | UFGS 09 65 66 Resilient Athletic Flooring | Aug-2010 | R | Added GEI or SCS certification | |
| Aug-2010 | A | UFGS 09 66 13 Portland Cement Terrazzo Flooring | Aug-2010 | R | Added GEI or SCS certification | |
| Aug-2010 | A | UFGS 09 66 16 Terrazzo Floor Tile | Aug-2010 | R | Added GEI or SCS certification | |
| Aug-2010 | A | UFGS 09 66 23 Resinous Matrix Terrazzo Flooring | Aug-2010 | R | Added GEI or SCS certification | |
| Aug-2010 | S | UFGS 09 67 23.13 Standard Resinous Flooring | Aug-2010 | R | Revised General Note, subparts 1.4, 3.2.1.1, 3.2.1.2 and 3.2.2; submittal article configuration compliance; added subparts 1.3, 1.3.1, 1.3.2,1.5, 3.3.1 and 3.6 | |
| Aug-2010 | A | UFGS 09 67 23.14 Chemical Resistant Resinous Flooring | Aug-2010 | R | Added GEI or SCS certification | |
| Aug-2010 | N | UFGS 09 67 23.15 Fuel Resistive Resinous Flooring, 3-Coat System | Aug-2010 | R | Revised Tennant Topcoat info in Table II | |
| Aug-2010 | N | UFGS 09 67 23.16 Fuel Resistive Resinous Flooring, 5-Coat System | Aug-2010 | R | Revised Tennant Topcoat info in Table II | |
| Aug-2010 | A | UFGS 09 69 13 Rigid Grid Access Flooring | Aug-2010 | R | Updated criteria for applying loads allowed, deflection and size of panels to coincide with industry | |
| Aug-2010 | A | UFGS 09 69 19 Stringerless Access Flooring | Aug-2010 | R | Updated criteria for applying loads allowed, deflection and size of panels to coincide with industry | |
| Aug-2010 | A | UFGS 09 72 00 Wallcoverings | Aug-2010 | R | Added GEI or SCS certification | |
| Aug-2010 | A | UFGS 09 83 13 Acoustical Wall Coating | Aug-2010 | R | Added GEI or SCS certification | |
| Aug-2010 | N | UFGS 09 90 00 Paints and Coatings | Aug-2010 | R | Added GEI or SCS certification and other minor revisions | |
| Aug-2010 | N | UFGS 10 22 13 Wire Mesh Partitions | Aug-2010 | R | Added GEI or SCS certification | |
| Aug-2010 | A | UFGS 10 22 19 Demountable and Moveable Partitions | Aug-2010 | R | Added GEI or SCS certification | |
| Aug-2010 | N | UFGS 10 22 26.13 Accordion Folding Partitions | Aug-2010 | R | Added GEI or SCS certification | |
| Aug-2010 | N | UFGS 10 22 26.23 Coiling Partitions | Aug-2010 | R | Added GEI or SCS certification | |
| Aug-2010 | A | UFGS 10 22 26.33 Folding Panel Partitions | Aug-2010 | R | Added GEI or SCS certification | |
| Aug-2010 | A | UFGS 10 22 26.43 Sliding Partitions | Aug-2010 | R | Added GEI or SCS certification | |
| Aug-2010 | A | UFGS 10 26 13 Wall and Corner Guards | Aug-2010 | R | Added GEI or SCS certification | |
| Aug-2010 | A | UFGS 12 21 00 Window Blinds | Aug-2010 | R | Added GEI or SCS certification | |
| Aug-2010 | N | UFGS 12 22 00 Curtains and Drapes | Aug-2010 | R | Added GEI or SCS certification | |
| Aug-2010 | A | UFGS 12 24 13 Roller Window Shades | Aug-2010 | R | Added GEI or SCS certification | |
| Aug-2010 | A | UFGS 12 35 20 Foodservice Casework, Countertops, and Accessories | Aug-2010 | R | Added GEI or SCS certification | |
| Aug-2010 | A | UFGS 12 35 70 Healthcare Casework | Aug-2010 | R | Added GEI or SCS certification | |
| Aug-2010 | A | UFGS 14 24 00 Hydraulic Elevators | Aug-2010 | R | Total revision of 2.4 ELEVATOR DRIVE SYSTEM and 2.5 CONTROL EQUIPMENT | |
| Aug-2010 | S | UFGS 21 13 00.00 40 Fire-Suppression Sprinkler Systems | Aug-2010 | R | Standard tailoring for RCBEA incorporated; other minor revisions throughout | |
| Aug-2010 | S | UFGS 21 13 26.00 40 Deluge Fire-Suppression Sprinkler Systems | Aug-2010 | R | Standard tailoring for RCBEA incorporated; other minor revisions throughout | |
| Aug-2010 | S | UFGS 21 21 00.00 40 Carbon-Dioxide Fire Extinguishing Systems | Aug-2010 | R | Added note and text in subpart 3.2.2; submittal article configuration compliance; other minor revisions throughout | |
| Aug-2010 | N | UFGS 22 00 00 Plumbing, General Purpose | Aug-2010 | R | Revised subpart 2.1 | |
| Aug-2010 | S | UFGS 22 05 83.63 Cured-In-Place Pipe (CIPP) Lining for Plumbing Applications | Aug-2010 | N | New section | |
| Aug-2010 | S | UFGS 22 14 29 Sump Pumps | Aug-2010 | R | Standard tailoring for RCBEA incorporated; other minor revisions throughout | |
| Aug-2010 | S | UFGS 22 15 09 General Service Compressed-Air Systems Cleaning Procedures | Aug-2010 | R | Standard tailoring for RCBEA incorporated; other minor revisions throughout | |
| Aug-2010 | S | UFGS 22 15 14 General Service Compressed-Air Systems, Low Pressure | Aug-2010 | R | Standard tailoring for RCBEA incorporated; other minor revisions throughout | |
| Aug-2010 | S | UFGS 22 66 53 Laboratory Chemical-Waste and Vent Piping | Aug-2010 | R | Standard tailoring for RCBEA incorporated; other minor revisions throughout | |
| Aug-2010 | A | UFGS 23 00 00 Air Supply, Distribution, Ventilation, and Exhaust Systems | Aug-2010 | R | Added GEI or SCS certification; allow flexible elastomeric duct liner | |
| Aug-2010 | S | UFGS 23 01 30.41 HVAC System Cleaning | Aug-2010 | N | New section | |
| Aug-2010 | N | UFGS 23 03 00.00 20 Basic Mechanical Materials and Methods | Aug-2010 | R | Added GEI or SCS certification | |
| Aug-2010 | A | UFGS 23 07 00 Thermal Insulation for Mechanical Systems | Aug-2010 | R | Added GEI or SCS certification; CCR 3250 | |
| Aug-2010 | S | UFGS 23 09 33.00 40 Electric and Electronic Control System for HVAC | Aug-2010 | R | Standard tailoring for RCBEA incorporated; other minor revisions throughout | |
| Aug-2010 | S | UFGS 23 73 13 Modular Indoor Central-Station Air-Handling Units | Aug-2010 | R | Revised General Note, deleted 1.2; submittal article compliance; Added subparts 1.3. 1.3.1, 1.3.2, 1.4, 1.5, 2.1and 3.8; other minor revisions throughout | |
| Aug-2010 | S | UFGS 23 82 16 Air Coils | Aug-2010 | R | Added "Note" below Part 1 General; submittal article compliance; revised subpart 1.3 and 1.4; other minor revisions throughout | |
| Aug-2010 | S | UFGS 23 82 19 Fan Coil Units | Aug-2010 | R | Submittal article compliance; other minor revisions throughout | |
| Aug-2010 | S | UFGS 23 82 43 Electric Duct Heaters | Aug-2010 | R | Submittal article compliance; other minor revisions throughout | |
| Aug-2010 | S | UFGS 26 05 00.00 40 Common Work Results for Electrical | Aug-2010 | R | Standard tailoring for RCBEA incorporated; other minor revisions throughout | |
| Aug-2010 | S | UFGS 26 05 13.00 10 Medium-Voltage Cables | Aug-2010 | R | Standard tailoring for RCBEA incorporated; other minor revisions throughout | |
| Aug-2010 | S | UFGS 26 09 23.00 40 Lighting Control Devices | Aug-2010 | R | Standard tailoring for RCBEA incorporated; other minor revisions throughout | |
| Aug-2010 | S | UFGS 26 12 19.00 40 Pad-Mounted, Liquid-Filled Medium-Voltage Transformers | Aug-2010 | R | Standard tailoring for RCBEA incorporated; other minor revisions throughout | |
| Aug-2010 | S | UFGS 26 18 23.00 40 Medium-Voltage Surge Arresters | Aug-2010 | R | Standard tailoring for RCBEA incorporated; other minor revisions throughout | |
| Aug-2010 | S | UFGS 26 23 00.00 40 Switchboards and Switchgear | Aug-2010 | R | Standard tailoring for RCBEA incorporated; other minor revisions throughout | |
| Aug-2010 | S | UFGS 26 24 16.00 40 Panelboards | Aug-2010 | R | Standard tailoring for RCBEA incorporated; other minor revisions throughout | |
| Aug-2010 | S | UFGS 26 24 19.00 40 Motor-Control Centers | Aug-2010 | R | Standard tailoring for RCBEA incorporated; other minor revisions throughout | |
| Aug-2010 | S | UFGS 26 28 21.00 40 Automatic Transfer Switches | Aug-2010 | R | Standard tailoring for RCBEA incorporated; other minor revisions throughout | |
| Aug-2010 | S | UFGS 26 35 33.00 40 Power Factor Correction Equipment | Aug-2010 | R | Standard tailoring for RCBEA incorporated; other minor revisions throughout | |
| Aug-2010 | S | UFGS 28 05 26.00 40 Grounding and Bonding For Electronic Safety and Security | Aug-2010 | R | Standard tailoring for RCBEA incorporated; other minor revisions throughout | |
| Aug-2010 | S | UFGS 28 31 13.00 40 Fire Detection and Alarm Control, GUI and Logic Systems | Aug-2010 | R | Standard tailoring for RCBEA incorporated; other minor revisions throughout | |
| Aug-2010 | A | UFGS 32 13 11 Concrete Pavement for Airfields and Other Heavy-Duty Pavements | Aug-2010 | R | Title changed to eliminate volume restriction; was Concrete Pavement for Airfields and Other Heavy-Duty Pavements More Than 10000 Cubic Yards | |
| Aug-2010 | N | UFGS 32 13 13.03 Airfields and Heavy-Duty Concrete Pavement Less than 10000 Cubic Yards | Apr-2006 | D | Superseded by UFGS 32 13 11 Concrete Pavement for Airfields and Other Heavy-Duty Pavement Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
| Aug-2010 | S | UFGS 32 31 13 Chain Link Fences and Gates | Aug-2010 | R | Submittal article compliance; Added subpart 1.5.2; other minor revisions throughout | |
| Aug-2010 | A | UFGS 33 61 13 Pre-Engineered Underground Heat Distribution System | Aug-2010 | R | Updated poured-in-place insulation requirements | |
| Aug-2010 | S | UFGS 33 77 19.00 40 Medium-Voltage Switch | Aug-2010 | R | Standard tailoring for RCBEA incorporated; other minor revisions throughout | |
| Aug-2010 | S | UFGS 40 17 30.00 40 Welding General Piping | Aug-2010 | R | Submittal article compliance; Added subpart 1.5; revised subpart 3.3.2.1; other minor revisions throughout | |
| Aug-2010 | S | UFGS 40 18 00 Vacuum Systems Process Piping | Aug-2010 | R | Standard tailoring for RCBEA incorporated; other minor revisions throughout | |
| Aug-2010 | S | UFGS 43 41 13.19 Fiberglass Gas Liquid Pressure Vessels | Aug-2008 | D | Section number and title change; Superseded by UFGS 43 41 16.16 Vertical Atmospheric Tanks and Vessels Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
| Aug-2010 | S | UFGS 43 41 16.16 Vertical Atmospheric Tanks and Vessels | Apr-2018 | N | Superseding UFGS 43 41 13.19 Fiberglass Gas Liquid Pressure Vessels; submittal article configuration compliance; revised General Note; added subparts 1.2.1.2, 1.2.1.3, 2.3.1, and 3.2; added note to 3.5; other minor revisions throughout | |
| Jun-2010 | S | UFGS 01 33 00 Submittal Procedures | Jun-2010 | R | INTERIM RELEASE: added tailoring for "Construction" in subpart 1.1.1 under SD-01; added tailoring option for "Army" in subpart 1.1.3; other minor revisions in subparts 1.3.5, 1.8, 1.8.1, 1.8.2, and 1.8.3 | |
| Jun-2010 | A | UFGS 22 00 70 Plumbing for Healthcare Facilities | Jun-2010 | R | INTERIM RELEASE: added EPA registration for Copper-Silver Ionization requirement | |
| May-2010 | S | UFGS 01 33 00 Submittal Procedures | May-2010 | R | Revised subpart 1.5.4 and 1.5.9; revised note in 1.8.2 and 1.9; minor revision in article 1.14 | |
| May-2010 | A | UFGS 01 78 00 Closeout Submittals | May-2010 | R | Submittal article configuration compliance and add Navy tailor tags for final cleaning | |
| May-2010 | A | UFGS 02 01 50 Operation, Maintenance and Process Monitoring for Soil Vapor Extraction (SVE) Systems | May-2010 | R | CSI SectionFormat and submittal article configuration compliance | |
| May-2010 | A | UFGS 02 32 00 Subsurface Drilling, Sampling, and Testing | May-2010 | R | CSI SectionFormat and submittal article configuration compliance |