The documents below are from various Tri-Service criteria working groups. They provide background information (supplemental documentation, best practices, sample calculations, etc.) to DOD criteria. These documents are intended to assist project delivery teams with the application and use of criteria.

Title Date Change Date View CCR
TSEWG NAVAIR 51-50AAA-2 Organizational General Requirements for Shorebased Airfield Marking and Lighting  
TSEWG TP-01 Electrical Calculation Examples  
TSEWG TP-02 Capacitors for Power Factor Correction  
TSEWG TP-03 Surge Protector Performance and Evaluation Criteria  
TSEWG TP-04 Stationary Battery and Charger Sizing  
TSEWG TP-05 Interior Transformer Ratings and Installation  
TSEWG TP-06 Low-Voltage Breaker Interrupting Ratings  
TSEWG TP-07 Protection System Design  
TSEWG TP-08 Equipment Enclosures and Hazardous Locations  
TSEWG TP-09 Automatic Transfer Equipment  
TSEWG TP-10 Arc Flash Levels for Fused Voltage Inputs to Electricity Meters  
TSEWG TP-11 UFC 3-500-10N Best Practices  
TSEWG TP-12 UFC 3-500-10N Appendices  
TSEWG TP-13 UFC 3-501-03N Load Demand Analyses  
TSEWG TP-14 RESERVED  
TSEWG TP-15 Arc Flash Calculations and Detailed Arc Flash Warning Labels  
TSEWG TP-16 Impressed Current Anode Material Selection and Design Considerations  
TSEWG TP-17 Galvanic (Sacrificial) Anode Material Selection, Design Considerations  
TSEWG TP-18 Frequently Asked Questions About Cathodic Protection System Equipment Testing  
TSEWG TP-19 Static Uninterruptible Power Supply (UPS)  
TSEWG TP-20 Air Visual Air Navigation Facilities: Qualifying Equipment  
TSEWG TP-21 Visual Air Navigation Facilities: Air Facility Equipment Inspection and Testing  
TSEWG TP-22 Airfield/Heliport/Helipad Portable Lighting Requirements in a Theater Of Operations (TO) (FOR ARMY ONLY)  
TSFPEWG G 3-600-01.01-18 Air Force Fire Protection Engineering Criteria and Technical Guidance For Mission Continuity of Electronic, Information Technology, and Telecommunications Equipment Installations, with Change 1  
TSFPEWG-G 3-600-01.9-7-6 Fire Protection Engineering Criteria and Technical Guide for Flexible Sprinkler Hose Fittings  
TSPWG 3-250-04_05-8 Use Of Off-The-Shelf Concrete Admixtures As Cold Weather Admixture Systems (CWAS)  
TSPWG 3-250-07.07-6 Risk Assessment Procedure for Recycling Portland Cement Concrete (PCC) Suffering from Alkali-Silica Reaction (ASR) In Airfield Pavement Structures  
TSPWG 3-260-01.06-04 Expedient Trim Pad Anchoring Systems  
TSPWG 3-260-01.12-08 Contingency Aircraft Tie-Downs In Portland Cement Concrete (PCC) Pavements  
TSPWG 3-260-02.11-4 Airfield Pavement Drainage Layers  
TSPWG 3-270-01.11-15 Repairing and Backfilling Earthen Structures With Flowable Fill  
TSPWG M 3-250-03.11-3 Warm Mix Asphalt (WMA)  
TSPWG M 3-250-04.06-2 Alkali-Aggregate Reaction In Portland Cement Concrete (PCC) Airfield Pavements  
TSPWG M 3-250-04.97-05 Proportioning Concrete Mixtures With Graded Aggregates For Rigid Airfield Pavements  
TSPWG M 3-260-00.23-01 Contracting Airfield Pavement Work  
TSPWG M 3-260-00.NS7210 Standards for NATO Deployed Air Operations  
TSPWG M 3-260-02.01-8 Resin Modified Pavement Design and Application Criteria  
TSPWG M 3-260-02.04-4 Trenchless Technology for Crossing Air Force Pavements  
TSPWG M 3-260-02.07-3 Jet Engine Thrust Standoff for Airfield Asphalt Edge Pavements  
TSPWG M 3-260-02.09-2 Contingency Airfield Pavement Specifications  
TSPWG M 3-260-02.24-01, Trapezoidal Grooving for Rigid and Flexible Airfield Pavements  
TSPWG M 3-260-03-00-2 Inspection of Trim Pad Anchor Systems  
TSPWG M 3-260-03.02-19 Airfield Pavement Evaluation Standards and Procedures  
TSPWG M 3-260-03.04-6 Inspection of Pavement Drainage Systems  
TSPWG M 3-260-03.22-01 Constructing Pavement Design and Evaluation Charts  
TSPWG M 3-260-03.24-03 Aircraft Classification Ratings and Aircraft Classification Numbers for US DoD and NATO Operations  
TSPWG M 3-260-04.18-01 Life-Cycle Cost Analysis of Retroreflective Glass Beads  
TSPWG M 3-260-04.18-02 Airfield Marking Waiver Procedures  
TSPWG M 3-270-01.04-10 Determining the Need for Runway Rubber Removal  
TSPWG M 3-270-01.08-2 Testing Protocol for Rapid Setting Rigid Repair Material  
TSPWG M 3-270-01.08-4 Testing Protocol for Polomeric Spall Repair Materials  
TSPWG M 3-270-01.08-4 Testing Protocol for Polomeric Spall Repair Materials  
TSPWG M 3-270-01.24-02 Aircraft Compatibility with Fiber Reinforced Polymer Matting Systems for Airfield Damage Repair, with Change 1  
TSPWG M 3-270-01.3-270-07 O&M: Airfield Damage Repair  
TSPWG M 3-270-08.14-03 Pavement Management Plan  
TSPWG M 3-32-17.07-10 Evaluation and Restoration of Folded Fiberglass Mats (FFM)  
TSPWG M 3-32-17.07-2 Anchoring a Fiberglass Mat Assembly in Asphalt Concrete Pavement  
TSPWG PM 3-270-01.20-02 Rapid-Setting Concrete Repair Capping Using Type I and Type III Cements  
TSPWG PM 3-270-01.21-05 Rapid Airfield Damage Repair in Cold Weather  
TSPWG TSC 13-1 Inspector’s Manual for Hot-Mixed Asphalt and Portland Cement Concrete Pavement Construction  
TSSEWG-M 25-01 DoD Joint Commercial Bunker Testing Procedures  
TSSEWG-M 25-01 DoD Joint Commercial Bunker Testing Procedures