Below is a listing of the Revisions and Changes made to UFGS Sections for each release. You can narrow the list by selecting a UFGS Release date from the drop-down and clicking 'Apply'.

KEYPREPARING ACTIVITY (PA)A ArmyN NavyF Air ForceS NASA [ARCHIVED]
ACTIONN NewR RevisionC ChangeD Deletion
Release PA UFGS Section Action Change # Nature of Change or Revision
Aug-2009 A UFGS 33 40 00 Stormwater Utilities R Complete revision of section
Aug-2009 A UFGS 33 82 01 Intercommunication System R Revised SD-10 Operation and Maintenance Data
Aug-2009 N UFGS 35 59 13.13 Prestressed Concrete Fender Piling R Major revision
May-2009 A UFGS 01 42 00 Sources for Reference Publications R National Association of Architectural Metal Manufacturers (NAAMM) address correction
May-2009 A UFGS 01 78 00 Closeout Submittals R Clarified CADD file format
May-2009 S UFGS 02 42 51 Carpet Removal and Reclamation N New section
May-2009 A UFGS 03 11 13.00 10 Structural Cast-In-Place Concrete Forming R Combined section with UFGS 03 11 14.00 10 Formwork for Concrete
May-2009 A UFGS 03 11 14.00 10 Formwork for Concrete D Section has been combined with and superseded by UFGS 03 11 13.00 10 Structural Concrete Formwork
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2009 S UFGS 03 62 16 Metallic Non-Shrink Grouting R General update
May-2009 S UFGS 05 51 00 Metal Stairs R General update
May-2009 S UFGS 05 72 00 Decorative Metal Specialties R General update
May-2009 S UFGS 06 18 00 Glued-Laminated Construction R General update
May-2009 S UFGS 06 71 33 Fiberglass Reinforced Plastic (FRP) Ladders N New section
May-2009 S UFGS 06 82 14 Fiberglass Reinforced Plastic (FRP) Pipe and Tube Railings N New section
May-2009 S UFGS 07 41 63 Fabricated Roof Panel Assemblies R General update
May-2009 A UFGS 08 13 73 Sliding Metal Doors R Compliance with CSI SectionFormat
May-2009 S UFGS 08 22 20 Fiberglass Reinforced Plastic (FRP) Doors and Frames N New section
May-2009 A UFGS 08 33 13 Coiling Counter Doors R Compliance with CSI SectionFormat
May-2009 A UFGS 09 06 90 Schedules for Painting and Coating R Compliance with CSI SectionFormat
May-2009 A UFGS 09 24 23 Cement Stucco R Compliance with CSI SectionFormat
May-2009 A UFGS 09 35 16 Chemical-Resistant Quarry Tiling R Compliance with CSI SectionFormat
May-2009 A UFGS 09 64 23 Wood Parquet Flooring R Compliance with CSI SectionFormat
May-2009 A UFGS 09 65 33 Conductive Vinyl Flooring R Compliance with CSI SectionFormat
May-2009 A UFGS 09 65 66 Resilient Athletic Flooring R Compliance with CSI SectionFormat
May-2009 A UFGS 09 66 13 Portland Cement Terrazzo Flooring R Compliance with CSI SectionFormat
May-2009 A UFGS 09 66 16 Terrazzo Floor Tile R Compliance with CSI SectionFormat
May-2009 A UFGS 09 66 23 Resinous Matrix Terrazzo Flooring R Compliance with CSI SectionFormat
May-2009 A UFGS 09 83 13 Acoustical Wall Coating R Compliance with CSI SectionFormat
May-2009 A UFGS 09 97 01.00 10 Metallizing Hydraulic Structures R Compliance with CSI SectionFormat
May-2009 A UFGS 09 97 02 Painting: Hydraulic Structures R Compliance with CSI SectionFormat
May-2009 A UFGS 09 97 30 Preparation of Historic Wood and Metal Surfaces for Painting R Compliance with CSI SectionFormat
May-2009 A UFGS 10 22 19 Demountable and Moveable Partitions R Compliance with CSI SectionFormat
May-2009 A UFGS 10 26 13 Wall and Corner Guards R Compliance with CSI SectionFormat
May-2009 S UFGS 10 44 16 Fire Extinguishers R General update
May-2009 S UFGS 12 31 00 Manufactured Metal Casework R General update
May-2009 S UFGS 12 32 00 Manufactured Wood Casework R General update
May-2009 S UFGS 12 34 00 Manufactured Plastic Casework R General update
May-2009 S UFGS 12 36 00 Countertops R General update
May-2009 S UFGS 12 48 13.13 Entrance Floor Mats R General update
May-2009 A UFGS 21 13 13.00 10 Wet Pipe Sprinkler System, Fire Protection R Revised Paragraph DISINFECTION
May-2009 A UFGS 21 13 17.00 10 Dry Pipe Sprinkler System, Fire Protection R Revised Paragraph DISINFECTION
May-2009 A UFGS 21 13 18.00 10 Preaction and Deluge Sprinkler Systems, Fire Protection R Revised Paragraph DISINFECTION
May-2009 A UFGS 22 00 70 Plumbing for Healthcare Facilities R Revised Paragraph COPPER-SILVER IONIZATION SYSTEM
May-2009 A UFGS 22 60 70 Gas and Vacuum Systems for Healthcare Facilities R Added Special Fittings to Paragraph PIPE AND FITTINGS
May-2009 S UFGS 31 63 29 Drilled Concrete Piers and Shafts N New section
May-2009 A UFGS 32 11 29 Lime-[Stabilized] [Modified] Subgrade R Title changed from Lime-Stabilized Base Course, Subbase, or Subgrade and revisions to comply with UFC 3-250-11
May-2009 A UFGS 32 12 15 Hot-Mix Asphalt (HMA) for Airfields R Added Marshall Compaction Requirements
May-2009 S UFGS 32 31 13 Chain Link Fences and Gates R General update
May-2009 S UFGS 33 01 99 Slip Lining of Existing Piping N New section
May-2009 S UFGS 33 01 99 Slip Lining of Existing Piping N New section
May-2009 S UFGS 33 32 13.13 Packaged Sewage Lift Stations, Wet Well Type R General update
May-2009 A UFGS 41 65 10.00 10 [Diesel] [Natural Gas] Fueled Engine Pump Drives R Tailored for Diesel and Natural Gas
Feb-2009 S UFGS 01 33 00 Submittal Procedures R Updated Standard Submittal Note
Feb-2009 N UFGS 01 35 26 Governmental Safety Requirements R Added 1.6.1.2
Feb-2009 N UFGS 01 57 19.00 20 Temporary Environmental Controls R Revised 1.4.1
Feb-2009 A UFGS 04 20 00 Unit Masonry R Revised 2.17 Insulation
Feb-2009 A UFGS 07 81 00 Spray-Applied Fireproofing R Compliance with CSI SectionFormat
Feb-2009 N UFGS 08 81 00 Glazing R Revised 2.1.8.1
Feb-2009 A UFGS 09 65 00 Resilient Flooring R General update
Feb-2009 A UFGS 10 10 00 Visual Communications Specialties R Compliance with CSI SectionFormat
Feb-2009 A UFGS 10 14 02 Interior Signage R General update
Feb-2009 A UFGS 11 47 00 Ice Machines R Compliance with CSI SectionFormat
Feb-2009 A UFGS 11 68 13 Playground Equipment R Compliance with CSI SectionFormat
Feb-2009 A UFGS 11 71 00 Sterilizers and Associated Equipment R Compliance with CSI SectionFormat
Feb-2009 A UFGS 12 21 00 Window Blinds R General update
Feb-2009 A UFGS 12 24 13 Roller Window Shades R General update
Feb-2009 A UFGS 12 35 70 Healthcare Casework R Compliance with CSI SectionFormat
Feb-2009 A UFGS 12 50 00 Furniture Systems R General update
Feb-2009 A UFGS 12 93 00 Site Furnishings R Compliance with CSI SectionFormat
Feb-2009 A UFGS 13 49 19 X-Ray Shielding R Compliance with CSI Sectionformat
Feb-2009 A UFGS 14 21 13 Electric Traction Freight Elevators R Compliance with CSI Sectionformat
Feb-2009 A UFGS 14 21 23 Electric Traction Passenger Elevators R Compliance with CSI Sectionformat
Feb-2009 A UFGS 14 24 00 Hydraulic Elevators R Eliminated option for concrete plug to close well casing bottom
Feb-2009 A UFGS 14 92 00 Pneumatic-Tube System R Compliance with CSI SectionFormat
Feb-2009 A UFGS 21 21 03.00 10 Wet Chemical Fire Extinguishing System R Compliance with CSI SectionFormat
Feb-2009 N UFGS 22 00 00 Plumbing, General Purpose R Overall update
Feb-2009 A UFGS 22 00 70 Plumbing for Healthcare Facilities N Supersedes UFGS 22 04 00.00 10 Plumbing, Hospital and UFGS 22 04 00.00 20 Hospital Plumbing Fixtures
Feb-2009 A UFGS 22 04 00.00 10 Plumbing, Hospital D Superseded by UFGS 22 00 70 Plumbing, Healthcare Facilities
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2009 N UFGS 22 04 00.00 20 Hospital Plumbing Fixtures D Superseded by UFGS 22 00 70 Plumbing, Healthcare Facilities
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2009 A UFGS 22 13 36 Pneumatic Sewage Ejectors R Compliance with CSI SectionFormat
Feb-2009 S UFGS 22 15 13.16 High-Pressure Compressed-Air Piping, Piping Components, and Valves, Stainless R Section References (SRF) update
Feb-2009 S UFGS 22 15 14 General Service Compressed-Air Systems, Low Pressure R Section References (SRF) update
Feb-2009 A UFGS 22 31 00 Water Softeners, Cation-Exchange (Sodium Cycle) R Compliance with CSI SectionFormat
Feb-2009 A UFGS 22 60 70 Gas and Vacuum Systems for Healthcare Facilities N Supersedes UFGS 22 62 13.00 20 Medical Gas and Vacuum Piping
Feb-2009 N UFGS 22 62 13.00 20 Medical Gas and Vacuum Piping D Superseded by UFGS 22 60 70 Gas and Vacuum Systems for Healthcare Facilities
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2009 S UFGS 23 05 15 Common Piping for HVAC R Section References (SRF) update
Feb-2009 S UFGS 23 09 33.00 40 Electric and Electronic Control System for HVAC R Section References (SRF) update
Feb-2009 S UFGS 23 09 33.00 40 Electric and Electronic Control System for HVAC R Section References (SRF) update
Feb-2009 S UFGS 23 09 33.00 40 Electric and Electronic Control System for HVAC R Section References (SRF) update
Feb-2009 S UFGS 23 22 25 Steam Valves R Section References (SRF) update
Feb-2009 S UFGS 23 31 13 Metal Ducts R Section References (SRF) update
Feb-2009 S UFGS 23 31 13 Metal Ducts R Section References (SRF) update
Feb-2009 S UFGS 23 31 13.20 40 Welding Metal Ductwork D Superseded by UFGS 40 17 30.00 40 Welding General Piping
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2009 A UFGS 23 33 56 Self-Acting Blast Valves R Compliance with CSI SectionFormat
Feb-2009 A UFGS 23 35 00.00 10 Overhead Vehicle Tailpipe [and Welding Fume] Exhaust Removal System(s) R Compliance with CSI SectionFormat
Feb-2009 A UFGS 33 40 00 Stormwater Utilities R Minor corrections throughout
Feb-2009 A UFGS 34 41 26.00 10 Access Control Point Control System R Technical update throughout
Feb-2009 S UFGS 40 17 30.00 40 Welding General Piping N Supersedes UFGS 23 31 13.20 40 Welding Metal Ductwork
Feb-2009 S UFGS 40 18 00 Vacuum Systems Process Piping R Section References (SRF) update
Feb-2009 S UFGS 40 18 00 Vacuum Systems Process Piping R Section References (SRF) update