Status
Active
View/Download
PDF   ZIP  
Publish Date
Pages
96
Spec. Division
22 - Plumbing
CCR

History: Below is a listing of the Revisions and Changes made to this UFGS.

KEYPREPARING ACTIVITY (PA)A ArmyN NavyF Air ForceS NASA [ARCHIVED]
ACTIONN NewR RevisionC ChangeD Deletion
Release PA Action Change # Nature of Change or Revision
May-2020 A R Complete review and update.
Feb-2020 A C 3 Updated paragraph 2.13 a. in response to CCR 2691.
Aug-2018 A C 2 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Aug-2017 A C 1 Sustainability updates, formatting to meet UFC 1-300-02 , reference updates and general revisions.
Nov-2011 A R Added Deionized Water Piping; revised Drainage Piping; removed mandatory waterless urinals; and revised Copper-Silver Ionization
Feb-2011 A R Minor clarifications throughout
Jun-2010 A R INTERIM RELEASE: added EPA registration for Copper-Silver Ionization requirement
May-2009 A R Revised Paragraph COPPER-SILVER IONIZATION SYSTEM
Feb-2009 A N Supersedes UFGS 22 04 00.00 10 Plumbing, Hospital and UFGS 22 04 00.00 20 Hospital Plumbing Fixtures