Export to CSV

Below is a listing of the Revisions and Changes made to UFGS Sections for each release. You can narrow the list by selecting a UFGS Release date from the drop-down and clicking 'Apply'.

KEYPREPARING ACTIVITY (PA)A ArmyN NavyF Air ForceS NASA [ARCHIVED]
ACTIONN NewR RevisionC ChangeD Deletion
Release PA UFGS Section Action Change # Nature of Change or Revision
Feb-2011 A UFGS 44 42 13.00 10 Air Supply and Diffusion Equipment for Sewage Treatment D Superseded by UFGS 46 51 00.00 10 Air and Gas Diffusion Equipment without revision to comply with MF 2010
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2011 N UFGS 44 42 13.00 20 Aeration Equipment D Superseded by UFGS 46 07 53.13 Packaged Wastewater Treatment Equipment, Aeration without revision to comply with MF 2010
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2011 N UFGS 44 42 23 Circular Clarifier D Superseded by UFGS 46 43 21 Circular Clarifier Equipment without revision to comply with MF 2010
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2011 A UFGS 44 42 26 Comminutor D Superseded by UFGS 46 24 16 Comminutors without revision to comply with MF 2010
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2011 N UFGS 44 42 39 Grit Collecting Equipment D Superseded by UFGS 46 23 00 Grit Removal and Handling Equipment without revision to comply with MF 2010
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2011 N UFGS 44 42 53 Parallel Plate [or Vertical Tube] Gravity Oil-Water Separator D Superseded by UFGS 46 25 14 Coalescing [or Vertical Tube] Oil-Water Separators without revision to comply with MF 2010
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2011 A UFGS 44 42 59 Continuous Loop Reactor Wastewater Treatment System D Superseded by UFGS 46 53 62 Continuous Loop Reactor Wastewater Treatment System without revision to comply with MF 2010
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2011 A UFGS 44 43 00 Filtration System D Superseded by UFGS 46 61 00 Filtration Equipment without revision to comply with MF 2010
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2011 N UFGS 44 44 46 Hydrotherapy Equipment D Superseded by UFGS 13 17 43 Hydrotherapy Equipment without revision to comply with MF 2010
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2011 A UFGS 44 44 53 Advanced Oxidation Processes (AOP) D Superseded without revision by UFGS 46 30 13 Advanced Oxidation Processes (AOP) to comply with MF 2010
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2011 A UFGS 44 44 73 Ultraviolet Disinfection Equipment D Superseded by UFGS 46 66 56 Open-Channel Disinfection Equipment without revision to comply with MF 2010
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2011 A UFGS 44 46 00 Pumps; Sewage and Sludge D Superseded by UFGS 22 13 29 Sanitary Sewerage Pumps without revision to comply with MF 2010
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2011 A UFGS 44 46 13 Sludge-Collecting Equipment D Superseded by UFGS 46 71 16 Gravity Belt Thickeners without revision to comply with MF 2010
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2011 A UFGS 44 46 16 Recessed Chamber Filter Press System D Superseded by UFGS 46 76 23.16 Recessed Chamber Filter Presses without revision to comply with MF 2010
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2011 A UFGS 44 46 19 Sludge-Digester Gas, Heating, and Mixing System D Superseded by UFGS 46 73 00.35 Sludge-Digester Gas, Heating, and Mixing System without revision to comply with MF 2010
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2011 A UFGS 44 46 20 Floating Cover for Sludge-Digestion Tanks D Superseded by UFGS 46 73 40 Floating Cover for Sludge-Digestion Tanks without revision to comply with MF 2010
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2011 N UFGS 46 07 53.13 Packaged Wastewater Treatment Equipment, Aeration N Superseding UFGS 44 42 13.00 20 Aeration Equipment without revision to comply with MF 2010
Feb-2011 A UFGS 46 07 53.16 Packaged Wastewater Treatment Equipment, Biochemical N Superseding UFGS 44 41 13 Packaged Wastewater Treatment Equipment, Biochemical without revision to comply with MF 2010
Feb-2011 A UFGS 46 07 53.19 Composting Toilet N Superseding UFGS 44 41 13.19 Composting Toilet without revision to comply with MF 2010
Feb-2011 A UFGS 46 20 20 Sewage Bar Screen and Mechanical Shredder N Superseding UFGS 22 13 23 Sewage Bar Screen and Mechanical Shredder without revision to comply with MF 2010
Feb-2011 N UFGS 46 23 00 Grit Removal and Handling Equipment N Superseding UFGS 44 42 39 Grit Removal and Handling Equipment without revision to comply with MF 2010
Feb-2011 A UFGS 46 24 16 Comminutors N Superseding UFGS 44 42 26 Comminutors without revision to comply with MF 2010
Feb-2011 N UFGS 46 25 14 Coalescing [or Vertical Tube] Oil-Water Separators N Superseding UFGS 44 42 53 Parallel Plate [or Vertical Tube] Gravity Oil-Water Separator without revision to comply with MF 2010
Feb-2011 A UFGS 46 30 13 Advanced Oxidation Processes (AOP) N Superseding UFGS 44 44 53 Advanced Oxidation Processes (AOP) without revision to comply with MF 2010
Feb-2011 N UFGS 46 43 21 Circular Clarifier Equipment N Superseding UFGS 44 42 23 Circular Clarifier Equipment without revision to comply with MF 2010
Feb-2011 A UFGS 46 51 00.00 10 Air and Gas Diffusion System N Superseding UFGS 44 42 13.00 10 Air Supply and Diffusion Equipment for Sewage Treatment without revision to comply with MF 2010
Feb-2011 A UFGS 46 53 62 Continuous Loop Reactor (CLR) Wastewater Treatment System N Superseding UFGS 44 42 59 Continuous Loop Reactor Wastewater Treatment System without revision to comply with MF 2010
Feb-2011 A UFGS 46 61 00 Filtration Equipment N Superseding UFGS 44 43 00 Filtration Equipment without revision to comply with MF 2010
Feb-2011 A UFGS 46 66 56 Open-Channel Disinfection Equipment N Superseding UFGS 44 44 73 Ultraviolet Disinfection Equipment without revision to comply with MF 2010
Feb-2011 A UFGS 46 71 16 Gravity Belt Thickeners N Superseding UFGS 44 43 13 Sludge-Collecting Equipment without revision to comply with MF 2010
Feb-2011 A UFGS 46 73 00.35 Sludge-Digester Gas, Heating, and Mixing System N Superseding UFGS 44 46 19 Sludge-Digester Gas, Heating, and Mixing System without revision to comply with MF 2010
Feb-2011 A UFGS 46 73 10 Floating Cover for Sludge-Digestion Tanks N Superseding UFGS 44 46 20 Floating Cover for Sludge-Digestion Tanks without revision to comply with MF 2010
Feb-2011 A UFGS 46 76 23.16 Recessed Chamber Filter Presses N Superseding UFGS 44 46 16 Recessed Chamber Filter Press System without revision to comply with MF 2010
Nov-2010 N UFGS 02 85 00.00 20 Mold Remediation N New section
Nov-2010 N UFGS 03 30 00 Cast-In-Place Concrete R Minor revisions in subparts 1.5, 2.4.6, 3.2.2, 3.2.3, 3.6.2
Nov-2010 A UFGS 03 30 00.00 10 Cast-In-Place Concrete N Disassembly and renaming that supersedes UFGS 03 31 00.00 10 Cast-in-Place Structural Concrete
Nov-2010 A UFGS 03 31 00.00 10 Cast-in-Place Structural Concrete D Section disassembled; Superseded by UFGS 03 30 00.00 10 Cast-in-Place Concrete, UFGS 03 35 00.00 10 Concrete Finishing, and 03 39 00.00 10 Concrete Curing.
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2010 A UFGS 03 31 01.00 10 Cast-In-Place Structural Concrete for Civil Works R Transferred curing and finishing paragraphs to UFGS 03 39 00.00 10 Curing Concrete and UFGS 03 35 00 .00 10 Concrete Finishing
Nov-2010 A UFGS 03 35 00.00 10 Concrete Finishing N New section
Nov-2010 A UFGS 03 39 00.00 10 Concrete Curing N New section
Nov-2010 N UFGS 05 12 00 Structural Steel R Revised note in subpart 1.4
Nov-2010 S UFGS 05 14 00.13 Welding Structural Aluminum Framing R Major maintenance throughout; submittal article compliance
Nov-2010 N UFGS 07 42 13 Metal Wall Panels R Minor revisions throughout
Nov-2010 A UFGS 07 81 00 Spray-Applied Fireproofing R Revised Fire Resistance Rating; added ICC-ES reports; revised material allowable UL rating
Nov-2010 A UFGS 09 65 33 Conductive Vinyl Flooring D Superseded by UFGS 09 65 36 Static-Control Resilient Flooring.
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2010 A UFGS 09 65 36 Static-Control Resilient Flooring N Supersedes UFGS 09 65 33 Conductive Vinyl Flooring
Nov-2010 A UFGS 09 69 13 Rigid Grid Access Flooring R Revised Air Leakage paragraph
Nov-2010 A UFGS 09 69 19 Stringerless Access Flooring R Revised Air Leakage paragraph
Nov-2010 N UFGS 09 97 23.16 Linseed Oil Protection of Concrete Surfaces R Revised paragraph 2.1.1
Nov-2010 S UFGS 23 05 48 Vibration and Seismic Controls for HVAC Piping and Equipment R Revised General Note; added note below Part 1 General; submittal article compliance; other minor revisions
Nov-2010 S UFGS 23 09 13.34 Control Valves, Self-Contained R Major maintenance throughout; submittal article compliance; added subparts 1.4, 3.2 and 3.3
Nov-2010 S UFGS 23 22 25 Steam Valves R Major maintenance throughout; submittal article compliance
Nov-2010 S UFGS 23 36 00 Air Terminal Units R Major maintenance throughout; submittal article compliance; revised subparts 1.3, 3.3
Nov-2010 S UFGS 26 05 00.00 40 Common Work Results for Electrical R Modified scope note; subpart 3.5 - separated combined table into one Metric and one English
Nov-2010 A UFGS 32 13 15.20 Concrete Pavement for Fuel Storage Containment Dikes N New section
Nov-2010 A UFGS 33 52 43.28 Filter Separator, Aviation Fueling System R Revised Coalescer and Separator Cartridges paragraph
Aug-2010 N UFGS 01 32 17.00 20 Cost-Loaded Network Analysis Schedules (NAS) R Revised first note in subpart 1.6.2.5
Aug-2010 A UFGS 01 42 00 Sources for Reference Publications R Update contact information
Aug-2010 A UFGS 01 42 00 Sources for Reference Publications R Update contact information
Aug-2010 A UFGS 03 11 13.00 10 Structural Cast-In-Place Concrete Forming R Titled changed from Structural Concrete Formwork for compliance with CSI MF04
Aug-2010 A UFGS 03 15 00.00 10 Concrete Accessories N Unified UFGS Sections 03 15 13.00 10 Expansion Joints, Contraction Joints, and Waterstops and 03 15 14.00 10 Expansion, Contraction and Construction Joints in Concrete for Civil Works
Aug-2010 A UFGS 03 15 13.00 10 Expansion Joints, Contraction Joints, and Waterstops D Consolidated with 03 15 14.00 10 Expansion, Contraction and Construction Joints in Concrete for Civil Works; Superseded by UFGS 03 15 00.00 10 Concrete Accessories
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2010 A UFGS 03 15 14.00 10 Expansion Contraction and Construction Joints in Concrete for Civil Works D Consolidated with section 03 15 13.00 10 Expansion Joints, Contraction Joints, and Waterstops; Superseded by UFGS 03 15 00.00 10 Concrete Accessories
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2010 A UFGS 03 20 00.00 10 Concrete Reinforcing N Unified UFGS Sections 03 20 01.00 10 Concrete Reinforcing and 03 20 02 Steel Bars and Welded Wire Fabric for Concrete Reinforcement for Civil Works; named to conform with CSI MF04
Aug-2010 A UFGS 03 20 01.00 10 Concrete Reinforcement D Consolidated with UFGS Section 03 20 02 Steel Bars and Welded Wire Fabric for Concrete Reinforcement for Civil Works; Superseded by UFGS 03 20 00.00 10 Concrete Reinforcing
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2010 A UFGS 03 20 02 Steel Bars and Welded Wire Fabric for Concrete Reinforcement for Civil Works D Consolidated with UFGS Section 03 20 01.00 10 Concrete Reinforcing; Superseded by UFGS 03 20 00.00 10 Concrete Reinforcing
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2010 A UFGS 06 41 16.00 10 Plastic-Laminate-Clad Architectural Cabinets R Added GEI or SCS certification
Aug-2010 A UFGS 06 61 16 Solid Surfacing Fabrications R Added GEI or SCS certification
Aug-2010 S UFGS 06 71 33 Fiberglass Reinforced Plastic (FRP) Ladders R Closes CCR #3524; other minor revisions throughout
Aug-2010 N UFGS 07 21 13 Board and Block Insulation R Added GEI or SCS certification
Aug-2010 N UFGS 07 21 16 Mineral Fiber Blanket Insulation R Added GEI or SCS certification
Aug-2010 N UFGS 07 21 23 Loose Fill Thermal Insulation R Added GEI or SCS certification
Aug-2010 N UFGS 07 22 00 Roof and Deck Insulation R Added GEI or SCS certification
Aug-2010 N UFGS 07 42 63 Fabricated Wall Panel Assemblies R Added GEI or SCS certification and other minor revisions
Aug-2010 N UFGS 07 57 13 Sprayed Polyurethane Foam (SPF) Roofing R Added GEI or SCS certification
Aug-2010 N UFGS 08 14 00 Wood Doors R Added GEI or SCS certification and other minor revisions
Aug-2010 S UFGS 08 41 13 Aluminum-Framed Entrances and Storefronts N New section
Aug-2010 N UFGS 09 23 00 Gypsum Plastering R Added GEI or SCS certification
Aug-2010 N UFGS 09 26 00 Veneer Plaster R Added GEI or SCS certification
Aug-2010 N UFGS 09 29 00 Gypsum Board R Added GEI or SCS certification and other minor revisions; revised subpart 3.4
Aug-2010 A UFGS 09 30 00 Ceramic Tile, Quarry Tile, and Paver Tile R Added GEI or SCS certification
Aug-2010 A UFGS 09 35 16 Chemical-Resistant Quarry Tiling R Added GEI or SCS certification
Aug-2010 A UFGS 09 51 00 Acoustical Ceilings R Added GEI or SCS certification; CCRs 3579 and 3580; Revised system
Aug-2010 N UFGS 09 64 00 Portable (Demountable) Wood Flooring R Added GEI or SCS certification
Aug-2010 A UFGS 09 64 23 Wood Parquet Flooring R Added GEI or SCS certification
Aug-2010 A UFGS 09 64 29 Wood Strip and Plank Flooring R Added GEI or SCS certification
Aug-2010 N UFGS 09 64 66 Wood Athletic Flooring R Added GEI or SCS certification
Aug-2010 A UFGS 09 65 00 Resilient Flooring R Added GEI or SCS certification
Aug-2010 A UFGS 09 65 33 Conductive Vinyl Flooring R Added GEI or SCS certification
Aug-2010 A UFGS 09 65 66 Resilient Athletic Flooring R Added GEI or SCS certification
Aug-2010 A UFGS 09 66 13 Portland Cement Terrazzo Flooring R Added GEI or SCS certification
Aug-2010 A UFGS 09 66 16 Terrazzo Floor Tile R Added GEI or SCS certification
Aug-2010 A UFGS 09 66 23 Resinous Matrix Terrazzo Flooring R Added GEI or SCS certification
Aug-2010 S UFGS 09 67 23.13 Standard Resinous Flooring R Revised General Note, subparts 1.4, 3.2.1.1, 3.2.1.2 and 3.2.2; submittal article configuration compliance; added subparts 1.3, 1.3.1, 1.3.2,1.5, 3.3.1 and 3.6
Aug-2010 A UFGS 09 67 23.14 Chemical Resistant Resinous Flooring R Added GEI or SCS certification
Aug-2010 N UFGS 09 67 23.15 Fuel Resistive Resinous Flooring, 3-Coat System R Revised Tennant Topcoat info in Table II
Aug-2010 N UFGS 09 67 23.16 Fuel Resistive Resinous Flooring, 5-Coat System R Revised Tennant Topcoat info in Table II
Aug-2010 A UFGS 09 69 13 Rigid Grid Access Flooring R Updated criteria for applying loads allowed, deflection and size of panels to coincide with industry
Aug-2010 A UFGS 09 69 19 Stringerless Access Flooring R Updated criteria for applying loads allowed, deflection and size of panels to coincide with industry
Aug-2010 A UFGS 09 72 00 Wallcoverings R Added GEI or SCS certification