Below is a listing of the Revisions and Changes made to UFGS Sections for each release. You can narrow the list by selecting a UFGS Release date from the drop-down and clicking 'Apply'.
| KEY | PREPARING ACTIVITY (PA) | A Army | N Navy | F Air Force | S NASA [ARCHIVED] |
|---|---|---|---|---|---|
| ACTION | N New | R Revision | C Change | D Deletion |
| Release | PA | UFGS Section | Date | Action | Change # | Nature of Change or Revision |
|---|---|---|---|---|---|---|
| Feb-2011 | A | UFGS 44 42 13.00 10 Air Supply and Diffusion Equipment for Sewage Treatment | Apr-2006 | D | Superseded by UFGS 46 51 00.00 10 Air and Gas Diffusion Equipment without revision to comply with MF 2010 Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
| Feb-2011 | N | UFGS 44 42 13.00 20 Aeration Equipment | Nov-2009 | D | Superseded by UFGS 46 07 53.13 Packaged Wastewater Treatment Equipment, Aeration without revision to comply with MF 2010 Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
| Feb-2011 | N | UFGS 44 42 23 Circular Clarifier | Nov-2009 | D | Superseded by UFGS 46 43 21 Circular Clarifier Equipment without revision to comply with MF 2010 Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
| Feb-2011 | A | UFGS 44 42 26 Comminutor | Apr-2006 | D | Superseded by UFGS 46 24 16 Comminutors without revision to comply with MF 2010 Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
| Feb-2011 | N | UFGS 44 42 39 Grit Collecting Equipment | Nov-2009 | D | Superseded by UFGS 46 23 00 Grit Removal and Handling Equipment without revision to comply with MF 2010 Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
| Feb-2011 | N | UFGS 44 42 53 Parallel Plate [or Vertical Tube] Gravity Oil-Water Separator | Apr-2006 | D | Superseded by UFGS 46 25 14 Coalescing [or Vertical Tube] Oil-Water Separators without revision to comply with MF 2010 Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
| Feb-2011 | A | UFGS 44 42 59 Continuous Loop Reactor Wastewater Treatment System | Apr-2006 | D | Superseded by UFGS 46 53 62 Continuous Loop Reactor Wastewater Treatment System without revision to comply with MF 2010 Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
| Feb-2011 | A | UFGS 44 43 00 Filtration System | Oct-2007 | D | Superseded by UFGS 46 61 00 Filtration Equipment without revision to comply with MF 2010 Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
| Feb-2011 | N | UFGS 44 44 46 Hydrotherapy Equipment | Apr-2006 | D | Superseded by UFGS 13 17 43 Hydrotherapy Equipment without revision to comply with MF 2010 Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
| Feb-2011 | A | UFGS 44 44 53 Advanced Oxidation Processes (AOP) | Oct-2007 | D | Superseded without revision by UFGS 46 30 13 Advanced Oxidation Processes (AOP) to comply with MF 2010 Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
| Feb-2011 | A | UFGS 44 44 73 Ultraviolet Disinfection Equipment | Apr-2006 | D | Superseded by UFGS 46 66 56 Open-Channel Disinfection Equipment without revision to comply with MF 2010 Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
| Feb-2011 | A | UFGS 44 46 00 Pumps; Sewage and Sludge | Apr-2006 | D | Superseded by UFGS 22 13 29 Sanitary Sewerage Pumps without revision to comply with MF 2010 Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
| Feb-2011 | A | UFGS 44 46 13 Sludge-Collecting Equipment | Apr-2006 | D | Superseded by UFGS 46 71 16 Gravity Belt Thickeners without revision to comply with MF 2010 Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
| Feb-2011 | A | UFGS 44 46 16 Recessed Chamber Filter Press System | Apr-2006 | D | Superseded by UFGS 46 76 23.16 Recessed Chamber Filter Presses without revision to comply with MF 2010 Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
| Feb-2011 | A | UFGS 44 46 19 Sludge-Digester Gas, Heating, and Mixing System | Oct-2007 | D | Superseded by UFGS 46 73 00.35 Sludge-Digester Gas, Heating, and Mixing System without revision to comply with MF 2010 Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
| Feb-2011 | A | UFGS 44 46 20 Floating Cover for Sludge-Digestion Tanks | Apr-2006 | D | Superseded by UFGS 46 73 40 Floating Cover for Sludge-Digestion Tanks without revision to comply with MF 2010 Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
| Feb-2011 | N | UFGS 46 07 53.13 Packaged Wastewater Treatment Equipment, Aeration | Feb-2011 | N | Superseding UFGS 44 42 13.00 20 Aeration Equipment without revision to comply with MF 2010 | |
| Feb-2011 | A | UFGS 46 07 53.16 Packaged Wastewater Treatment Equipment, Biochemical | Feb-2011 | N | Superseding UFGS 44 41 13 Packaged Wastewater Treatment Equipment, Biochemical without revision to comply with MF 2010 | |
| Feb-2011 | A | UFGS 46 07 53.19 Composting Toilet | Feb-2011 | N | Superseding UFGS 44 41 13.19 Composting Toilet without revision to comply with MF 2010 | |
| Feb-2011 | A | UFGS 46 20 20 Sewage Bar Screen and Mechanical Shredder | Feb-2011 | N | Superseding UFGS 22 13 23 Sewage Bar Screen and Mechanical Shredder without revision to comply with MF 2010 | |
| Feb-2011 | N | UFGS 46 23 00 Grit Removal and Handling Equipment | Feb-2011 | N | Superseding UFGS 44 42 39 Grit Removal and Handling Equipment without revision to comply with MF 2010 | |
| Feb-2011 | A | UFGS 46 24 16 Comminutors | Feb-2011 | N | Superseding UFGS 44 42 26 Comminutors without revision to comply with MF 2010 | |
| Feb-2011 | N | UFGS 46 25 14 Coalescing [or Vertical Tube] Oil-Water Separators | Feb-2011 | N | Superseding UFGS 44 42 53 Parallel Plate [or Vertical Tube] Gravity Oil-Water Separator without revision to comply with MF 2010 | |
| Feb-2011 | A | UFGS 46 30 13 Advanced Oxidation Processes (AOP) | Feb-2011 | N | Superseding UFGS 44 44 53 Advanced Oxidation Processes (AOP) without revision to comply with MF 2010 | |
| Feb-2011 | N | UFGS 46 43 21 Circular Clarifier Equipment | Feb-2011 | N | Superseding UFGS 44 42 23 Circular Clarifier Equipment without revision to comply with MF 2010 | |
| Feb-2011 | A | UFGS 46 51 00.00 10 Air and Gas Diffusion System | Feb-2011 | N | Superseding UFGS 44 42 13.00 10 Air Supply and Diffusion Equipment for Sewage Treatment without revision to comply with MF 2010 | |
| Feb-2011 | A | UFGS 46 53 62 Continuous Loop Reactor (CLR) Wastewater Treatment System | Feb-2011 | N | Superseding UFGS 44 42 59 Continuous Loop Reactor Wastewater Treatment System without revision to comply with MF 2010 | |
| Feb-2011 | A | UFGS 46 61 00 Filtration Equipment | Feb-2011 | N | Superseding UFGS 44 43 00 Filtration Equipment without revision to comply with MF 2010 | |
| Feb-2011 | A | UFGS 46 66 56 Open-Channel Disinfection Equipment | Feb-2011 | N | Superseding UFGS 44 44 73 Ultraviolet Disinfection Equipment without revision to comply with MF 2010 | |
| Feb-2011 | A | UFGS 46 71 16 Gravity Belt Thickeners | Feb-2011 | N | Superseding UFGS 44 43 13 Sludge-Collecting Equipment without revision to comply with MF 2010 | |
| Feb-2011 | A | UFGS 46 73 00.35 Sludge-Digester Gas, Heating, and Mixing System | Feb-2011 | N | Superseding UFGS 44 46 19 Sludge-Digester Gas, Heating, and Mixing System without revision to comply with MF 2010 | |
| Feb-2011 | A | UFGS 46 73 10 Floating Cover for Sludge-Digestion Tanks | Feb-2011 | N | Superseding UFGS 44 46 20 Floating Cover for Sludge-Digestion Tanks without revision to comply with MF 2010 | |
| Feb-2011 | A | UFGS 46 76 23.16 Recessed Chamber Filter Presses | Feb-2011 | N | Superseding UFGS 44 46 16 Recessed Chamber Filter Press System without revision to comply with MF 2010 | |
| Nov-2010 | N | UFGS 02 85 00.00 20 Mold Remediation | Nov-2010 | N | New section | |
| Nov-2010 | N | UFGS 03 30 00 Cast-In-Place Concrete | Nov-2010 | R | Minor revisions in subparts 1.5, 2.4.6, 3.2.2, 3.2.3, 3.6.2 | |
| Nov-2010 | A | UFGS 03 30 00.00 10 Cast-In-Place Concrete | Nov-2010 | N | Disassembly and renaming that supersedes UFGS 03 31 00.00 10 Cast-in-Place Structural Concrete | |
| Nov-2010 | A | UFGS 03 31 00.00 10 Cast-in-Place Structural Concrete | Nov-2009 | D | Section disassembled; Superseded by UFGS 03 30 00.00 10 Cast-in-Place Concrete, UFGS 03 35 00.00 10 Concrete Finishing, and 03 39 00.00 10 Concrete Curing. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
| Nov-2010 | A | UFGS 03 31 01.00 10 Cast-In-Place Structural Concrete for Civil Works | Nov-2010 | R | Transferred curing and finishing paragraphs to UFGS 03 39 00.00 10 Curing Concrete and UFGS 03 35 00 .00 10 Concrete Finishing | |
| Nov-2010 | A | UFGS 03 35 00.00 10 Concrete Finishing | Nov-2010 | N | New section | |
| Nov-2010 | A | UFGS 03 39 00.00 10 Concrete Curing | Nov-2010 | N | New section | |
| Nov-2010 | N | UFGS 05 12 00 Structural Steel | Nov-2010 | R | Revised note in subpart 1.4 | |
| Nov-2010 | S | UFGS 05 14 00.13 Welding Structural Aluminum Framing | Nov-2010 | R | Major maintenance throughout; submittal article compliance | |
| Nov-2010 | N | UFGS 07 42 13 Metal Wall Panels | Nov-2010 | R | Minor revisions throughout | |
| Nov-2010 | A | UFGS 07 81 00 Spray-Applied Fireproofing | Nov-2010 | R | Revised Fire Resistance Rating; added ICC-ES reports; revised material allowable UL rating | |
| Nov-2010 | A | UFGS 09 65 33 Conductive Vinyl Flooring | Aug-2010 | D | Superseded by UFGS 09 65 36 Static-Control Resilient Flooring. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
| Nov-2010 | A | UFGS 09 65 36 Static-Control Resilient Flooring | Nov-2010 | N | Supersedes UFGS 09 65 33 Conductive Vinyl Flooring | |
| Nov-2010 | A | UFGS 09 69 13 Rigid Grid Access Flooring | Nov-2010 | R | Revised Air Leakage paragraph | |
| Nov-2010 | A | UFGS 09 69 19 Stringerless Access Flooring | Nov-2010 | R | Revised Air Leakage paragraph | |
| Nov-2010 | N | UFGS 09 97 23.16 Linseed Oil Protection of Concrete Surfaces | Nov-2010 | R | Revised paragraph 2.1.1 | |
| Nov-2010 | S | UFGS 23 05 48 Vibration and Seismic Controls for HVAC Piping and Equipment | Nov-2010 | R | Revised General Note; added note below Part 1 General; submittal article compliance; other minor revisions | |
| Nov-2010 | S | UFGS 23 09 13.34 Control Valves, Self-Contained | Nov-2010 | R | Major maintenance throughout; submittal article compliance; added subparts 1.4, 3.2 and 3.3 | |
| Nov-2010 | S | UFGS 23 22 25 Steam Valves | Nov-2010 | R | Major maintenance throughout; submittal article compliance | |
| Nov-2010 | S | UFGS 23 36 00 Air Terminal Units | Nov-2010 | R | Major maintenance throughout; submittal article compliance; revised subparts 1.3, 3.3 | |
| Nov-2010 | S | UFGS 26 05 00.00 40 Common Work Results for Electrical | Nov-2010 | R | Modified scope note; subpart 3.5 - separated combined table into one Metric and one English | |
| Nov-2010 | A | UFGS 32 13 15.20 Concrete Pavement for Fuel Storage Containment Dikes | Nov-2010 | N | New section | |
| Nov-2010 | A | UFGS 33 52 43.28 Filter Separator, Aviation Fueling System | Nov-2010 | R | Revised Coalescer and Separator Cartridges paragraph | |
| Aug-2010 | N | UFGS 01 32 17.00 20 Cost-Loaded Network Analysis Schedules (NAS) | Aug-2010 | R | Revised first note in subpart 1.6.2.5 | |
| Aug-2010 | A | UFGS 01 42 00 Sources for Reference Publications | Aug-2010 | R | Update contact information | |
| Aug-2010 | A | UFGS 01 42 00 Sources for Reference Publications | Aug-2010 | R | Update contact information | |
| Aug-2010 | A | UFGS 03 11 13.00 10 Structural Cast-In-Place Concrete Forming | Aug-2010 | R | Titled changed from Structural Concrete Formwork for compliance with CSI MF04 | |
| Aug-2010 | A | UFGS 03 15 00.00 10 Concrete Accessories | Aug-2010 | N | Unified UFGS Sections 03 15 13.00 10 Expansion Joints, Contraction Joints, and Waterstops and 03 15 14.00 10 Expansion, Contraction and Construction Joints in Concrete for Civil Works | |
| Aug-2010 | A | UFGS 03 15 13.00 10 Expansion Joints, Contraction Joints, and Waterstops | Nov-2009 | D | Consolidated with 03 15 14.00 10 Expansion, Contraction and Construction Joints in Concrete for Civil Works; Superseded by UFGS 03 15 00.00 10 Concrete Accessories Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
| Aug-2010 | A | UFGS 03 15 14.00 10 Expansion Contraction and Construction Joints in Concrete for Civil Works | Nov-2009 | D | Consolidated with section 03 15 13.00 10 Expansion Joints, Contraction Joints, and Waterstops; Superseded by UFGS 03 15 00.00 10 Concrete Accessories Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
| Aug-2010 | A | UFGS 03 20 00.00 10 Concrete Reinforcing | Aug-2010 | N | Unified UFGS Sections 03 20 01.00 10 Concrete Reinforcing and 03 20 02 Steel Bars and Welded Wire Fabric for Concrete Reinforcement for Civil Works; named to conform with CSI MF04 | |
| Aug-2010 | A | UFGS 03 20 01.00 10 Concrete Reinforcement | Oct-2007 | D | Consolidated with UFGS Section 03 20 02 Steel Bars and Welded Wire Fabric for Concrete Reinforcement for Civil Works; Superseded by UFGS 03 20 00.00 10 Concrete Reinforcing Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
| Aug-2010 | A | UFGS 03 20 02 Steel Bars and Welded Wire Fabric for Concrete Reinforcement for Civil Works | Nov-2009 | D | Consolidated with UFGS Section 03 20 01.00 10 Concrete Reinforcing; Superseded by UFGS 03 20 00.00 10 Concrete Reinforcing Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
| Aug-2010 | A | UFGS 06 41 16.00 10 Plastic-Laminate-Clad Architectural Cabinets | Aug-2010 | R | Added GEI or SCS certification | |
| Aug-2010 | A | UFGS 06 61 16 Solid Surfacing Fabrications | Aug-2010 | R | Added GEI or SCS certification | |
| Aug-2010 | S | UFGS 06 71 33 Fiberglass Reinforced Plastic (FRP) Ladders | Aug-2010 | R | Closes CCR #3524; other minor revisions throughout | |
| Aug-2010 | N | UFGS 07 21 13 Board and Block Insulation | Aug-2010 | R | Added GEI or SCS certification | |
| Aug-2010 | N | UFGS 07 21 16 Mineral Fiber Blanket Insulation | Aug-2010 | R | Added GEI or SCS certification | |
| Aug-2010 | N | UFGS 07 21 23 Loose Fill Thermal Insulation | Aug-2010 | R | Added GEI or SCS certification | |
| Aug-2010 | N | UFGS 07 22 00 Roof and Deck Insulation | Aug-2010 | R | Added GEI or SCS certification | |
| Aug-2010 | N | UFGS 07 42 63 Fabricated Wall Panel Assemblies | Aug-2010 | R | Added GEI or SCS certification and other minor revisions | |
| Aug-2010 | N | UFGS 07 57 13 Sprayed Polyurethane Foam (SPF) Roofing | Aug-2010 | R | Added GEI or SCS certification | |
| Aug-2010 | N | UFGS 08 14 00 Wood Doors | Aug-2010 | R | Added GEI or SCS certification and other minor revisions | |
| Aug-2010 | S | UFGS 08 41 13 Aluminum-Framed Entrances and Storefronts | Aug-2010 | N | New section | |
| Aug-2010 | N | UFGS 09 23 00 Gypsum Plastering | Aug-2010 | R | Added GEI or SCS certification | |
| Aug-2010 | N | UFGS 09 26 00 Veneer Plaster | Aug-2010 | R | Added GEI or SCS certification | |
| Aug-2010 | N | UFGS 09 29 00 Gypsum Board | Aug-2010 | R | Added GEI or SCS certification and other minor revisions; revised subpart 3.4 | |
| Aug-2010 | A | UFGS 09 30 00 Ceramic Tile, Quarry Tile, and Paver Tile | Aug-2010 | R | Added GEI or SCS certification | |
| Aug-2010 | A | UFGS 09 35 16 Chemical-Resistant Quarry Tiling | Aug-2010 | R | Added GEI or SCS certification | |
| Aug-2010 | A | UFGS 09 51 00 Acoustical Ceilings | Aug-2010 | R | Added GEI or SCS certification; CCRs 3579 and 3580; Revised system | |
| Aug-2010 | N | UFGS 09 64 00 Portable (Demountable) Wood Flooring | Aug-2010 | R | Added GEI or SCS certification | |
| Aug-2010 | A | UFGS 09 64 23 Wood Parquet Flooring | Aug-2010 | R | Added GEI or SCS certification | |
| Aug-2010 | A | UFGS 09 64 29 Wood Strip and Plank Flooring | Aug-2010 | R | Added GEI or SCS certification | |
| Aug-2010 | N | UFGS 09 64 66 Wood Athletic Flooring | Aug-2010 | R | Added GEI or SCS certification | |
| Aug-2010 | A | UFGS 09 65 00 Resilient Flooring | Aug-2010 | R | Added GEI or SCS certification | |
| Aug-2010 | A | UFGS 09 65 33 Conductive Vinyl Flooring | Aug-2010 | R | Added GEI or SCS certification | |
| Aug-2010 | A | UFGS 09 65 66 Resilient Athletic Flooring | Aug-2010 | R | Added GEI or SCS certification | |
| Aug-2010 | A | UFGS 09 66 13 Portland Cement Terrazzo Flooring | Aug-2010 | R | Added GEI or SCS certification | |
| Aug-2010 | A | UFGS 09 66 16 Terrazzo Floor Tile | Aug-2010 | R | Added GEI or SCS certification | |
| Aug-2010 | A | UFGS 09 66 23 Resinous Matrix Terrazzo Flooring | Aug-2010 | R | Added GEI or SCS certification | |
| Aug-2010 | S | UFGS 09 67 23.13 Standard Resinous Flooring | Aug-2010 | R | Revised General Note, subparts 1.4, 3.2.1.1, 3.2.1.2 and 3.2.2; submittal article configuration compliance; added subparts 1.3, 1.3.1, 1.3.2,1.5, 3.3.1 and 3.6 | |
| Aug-2010 | A | UFGS 09 67 23.14 Chemical Resistant Resinous Flooring | Aug-2010 | R | Added GEI or SCS certification | |
| Aug-2010 | N | UFGS 09 67 23.15 Fuel Resistive Resinous Flooring, 3-Coat System | Aug-2010 | R | Revised Tennant Topcoat info in Table II | |
| Aug-2010 | N | UFGS 09 67 23.16 Fuel Resistive Resinous Flooring, 5-Coat System | Aug-2010 | R | Revised Tennant Topcoat info in Table II | |
| Aug-2010 | A | UFGS 09 69 13 Rigid Grid Access Flooring | Aug-2010 | R | Updated criteria for applying loads allowed, deflection and size of panels to coincide with industry | |
| Aug-2010 | A | UFGS 09 69 19 Stringerless Access Flooring | Aug-2010 | R | Updated criteria for applying loads allowed, deflection and size of panels to coincide with industry | |
| Aug-2010 | A | UFGS 09 72 00 Wallcoverings | Aug-2010 | R | Added GEI or SCS certification |