Nov-2013 N UFGS 33 05 23.19 Trenchless Excavation Using Microtunneling C 1 Revised subparts 1.2, 1.3.1, 2.4 and 3.1.1
Nov-2013 N UFGS 33 11 00 Water Utility Distribution Piping C 2 Revised subparts 2.1.2.7, 2.2.2.17, 3.1.2.2 and 3.2.2
Nov-2013 N UFGS 33 32 13.14 Packaged Sewage Lift Stations, Grinder Pump Type C 1 Revised subpart 2.5.3 and 2.6.2.2
Nov-2013 N UFGS 33 52 90.00 20 Welding for POL Service Piping C 1 Revised subpart 3.3
Nov-2013 A UFGS 33 82 33.00 10 Coaxial Cable Data Transmission System D Superseded by UFGS 27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM.
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2013 N UFGS 46 25 14 Coalescing [or Vertical Tube] Oil-Water Separators C 1 Revised subpart 3.2
Aug-2013 A UFGS 00 31 10 Metric Measurements D Section removed from UFGS
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2013 N UFGS 01 14 00 Work Restrictions C 1 Tailoring and changes for NAVFAC NW throughout
Aug-2013 A UFGS 01 32 01.00 10 Project Schedule C 1 Require use of Primavera P6
Aug-2013 N UFGS 01 33 29.00 20 Sustainable Requirements N NEW; Interim change to 01 33 29, LEED DOCUMENTATION, to include the Guiding Principles, for Navy-use only.
Aug-2013 N UFGS 01 35 26 Governmental Safety Requirements C 2 Modified subparts 1.3,1.6.1, 3.1.3, 3.4; Removed "A" for accept from Submittal Items
Aug-2013 N UFGS 01 57 19.00 20 Temporary Environmental Controls C 1 Modified throughout. Correctly classified Universal Waste and Asbestos material, removed tailoring from ECATTS paragraph, changed Environmental Management Plan to Environmental Protection Plan throughout and moved to Part 1.
Aug-2013 N UFGS 01 57 19.01 20 Supplemental Temporary Environmental Controls C 1 Added requirements for NAVFAC NW, including Definitions and Part 3 paragraphs.
Aug-2013 A UFGS 01 62 35 Recycled / Recovered / Biobased Materials C 1 Additional biobased materials language
Aug-2013 N UFGS 06 13 33 Pier Timberwork C 1 Modified subpart 2.1.1.2
Aug-2013 N UFGS 07 52 00 Modified Bituminous Membrane Roofing C 1 Modified note before Part 1, subparts 1.2, 1.7.1, 1.9.1, 1.12, 2.1 efg
Aug-2013 A UFGS 07 84 00 Firestopping C 1 Industry input
Aug-2013 N UFGS 09 97 13.27 High Performance Coating for Steel Structures C 1 Modified notes before Part 1 and in subpart 3.6
Aug-2013 S UFGS 21 13 00.00 40 Fire-Suppression Sprinkler Systems R Tri-Annual Database Maintenance (TADM) completed
Aug-2013 A UFGS 21 30 00 Fire Pumps C 1 CCR 1147, fuel piping specified by NFPA 20
Aug-2013 N UFGS 26 13 01 Pad-Mounted Dead-Front Air Insulated Switchgear N NEW
Aug-2013 N UFGS 26 27 29 Marina Electrical Work C 1 Modified subparts 2.2.3.2, 2.4.1, 2.14.3 (note) and 2.14.4 (note)
Aug-2013 N UFGS 31 62 13.20 Precast/Prestressed Concrete Piles C 1 Modified subparts 1.5 and 3.5 (notes)
Aug-2013 N UFGS 33 24 00.00 20 [Extraction] [Monitoring] Wells C 1 Modified subparts 2.1.1, 2.2.2, 2.9 and 3.9
Aug-2013 N UFGS 46 07 53.13 Packaged Wastewater Treatment Equipment, Aeration C 2 Modified note before Part 1, subparts 1.4, 2.16, 2.6.1, 2.7.3.1 (d), 2.8.3.1 (b3), 2.8.3.2 (b3, d1), 2.8.3.3 (b3), 2.13.10, 2.16, 3.3.1.1, 3.3.5.9, 3.5.2, 3.7.2 3.7.2.3
Aug-2013 N UFGS 46 23 00 Grit Removal and Handling Equipment C 1 Modified subparts 2.1.4.3, 2.1.6.2, 2.1.7.4, 2.1.10.1(b), 2.3.5(d), 2.6
May-2013 A UFGS 01 62 35 Recycled / Recovered / Biobased Materials R Revised Section Title from RECYCLED / RECOVERED MATERIALS. Also, added Biopreferred Fed
May-2013 N UFGS 03 45 00 Precast Architectural Concrete C 1 Modified note before Part 1; added SD-07; modifed SD-11; modified subpart 1.4, 1.6, 1.7, 1.8.1, 1.9 (formerly 1.10), 3.9 and 3.16.1; deleted subparts 1.8.1.1, 1.8.1.2 and 1.9
May-2013 N UFGS 05 21 19 Open Web Steel Joist Framing C 1 Modified subpart 2.2.1
May-2013 N UFGS 05 21 23 Steel Joist Girder Framing C 1 modified subpart 2.2.1
May-2013 N UFGS 07 21 13 Board and Block Insulation C 1 modified subpart 1.3
May-2013 N UFGS 07 21 16 Mineral Fiber Blanket Insulation C 1 Modified subpart 1.3
May-2013 N UFGS 07 21 23 Loose Fill Thermal Insulation C 1 Modified subpart 1.3
May-2013 N UFGS 07 22 00 Roof and Deck Insulation C 1 Modified subpart 1.4.3
May-2013 N UFGS 07 42 63 Fabricated Wall Panel Assemblies C 1 modified subpart 1.5.10
May-2013 N UFGS 07 57 13 Sprayed Polyurethane Foam (SPF) Roofing C 1 modified subpart 1.4.6
May-2013 N UFGS 08 14 00 Wood Doors C 1 Modified subpart1.3
May-2013 N UFGS 08 36 13 Sectional Overhead Doors C 1 Modified subparts 2.2, 2.3, 2.4.1, 2.4.1.1, 2.4.3, 2.5.1, 2.6.4, 2.7
May-2013 N UFGS 09 23 00 Gypsum Plastering C 1 modified subpart 1.3.2
May-2013 N UFGS 09 26 00 Veneer Plaster C 1 Modified subpart 1.4
May-2013 N UFGS 09 29 00 Gypsum Board C 1 Modified subpart 1.3
May-2013 N UFGS 09 64 00 Portable (Demountable) Wood Flooring C 1 modified subpart 1.3
May-2013 N UFGS 09 64 66 Wood Athletic Flooring C 1 modified subpart 1.3
May-2013 N UFGS 09 90 00 Paints and Coatings C 1 modified subpart 1.4.4
May-2013 N UFGS 10 22 13 Wire Mesh Partitions C 1 modified subpart 1.4
May-2013 N UFGS 10 22 26.13 Accordion Folding Partitions C 1 modified subpart 1.3.4
May-2013 N UFGS 10 22 26.23 Coiling Partitions C 1 modified subpart 1.4
May-2013 N UFGS 12 22 00 Curtains and Drapes C 1 modified subpart 1.5
May-2013 A UFGS 14 21 23 Electric Traction Passenger Elevators C 1 Updated references to sections and paragraphs of ASME A17.1/CSA B44
May-2013 N UFGS 22 00 00 Plumbing, General Purpose C 1 modified subpart 2.1
May-2013 A UFGS 23 00 00 Air Supply, Distribution, Ventilation, and Exhaust Systems C 1 Added the option for pneumatic or electric damper operator
May-2013 N UFGS 23 03 00.00 20 Basic Mechanical Materials and Methods C 1 modified subpart 1.4.5.3
May-2013 N UFGS 26 35 43 400-Hertz (HZ) Solid State Frequency Converter C 1 modified subparts 2.1.1.11, 2.2 and 2.4.3
May-2013 A UFGS 26 42 15.00 10 Cathodic Protection System (Steel Water Tanks) C 1 Inserted NOTES on Impressed Current Anodes and Anode Installation
May-2013 N UFGS 26 56 00 Exterior Lighting R Major revision. Supersedes 26 56 00.00 20
May-2013 N UFGS 26 56 00.00 20 Exterior Lighting D Superseded by UFGS 26 56 00 Exterior Lighting,
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2013 A UFGS 33 01 98 Slip Lining of Existing Piping for Levee Applications N New UFGS Section
May-2013 A UFGS 33 40 00 Stormwater Utilities C 2 Added requirements for use of Polypropylene (PP) Pipe
Feb-2013 A UFGS 03 44 00 Reinforced Autoclave Aerated Concrete Panels N New UFGS section
Feb-2013 A UFGS 07 08 27.00 10 Building Air Barrier System Testing for Commissioning N Superseding UFGS 07 27 00.45 10 Building Air Barrier System
Feb-2013 A UFGS 07 27 00.45 10 Building Air Barrier System D Superseded by UFGS 07 08 27.00 10 Building Air Barrier System Testing for Commissioning
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2013 A UFGS 07 27 00.45 10 Building Air Barrier System D Superseded by UFGS 07 08 27.00 10 Building Air Barrier System Testing for Commissioning
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2013 A UFGS 07 27 00.45 10 Building Air Barrier System D Superseded by UFGS 07 08 27.00 10 Building Air Barrier System Testing for Commissioning
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2013 A UFGS 07 27 00.45 10 Building Air Barrier System D Superseded by UFGS 07 08 27.00 10 Building Air Barrier System Testing for Commissioning
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2013 A UFGS 07 54 19 Polyvinyl Chloride Roofing R Title revision and complete update
Feb-2013 A UFGS 09 65 00 Resilient Flooring C 1 Adjusted sustainability requirements
Feb-2013 A UFGS 21 13 13.00 10 Wet Pipe Sprinkler System, Fire Protection C 1 Removed disinfection requirements and galvanized steel piping components
Feb-2013 A UFGS 21 13 17.00 10 Dry Pipe Sprinkler System, Fire Protection C 1 Removed disinfection requirements and galvanized steel piping components
Feb-2013 A UFGS 21 13 18.00 10 Preaction and Deluge Sprinkler Systems, Fire Protection C 1 Removed disinfection requirements and galvanized steel piping components
Feb-2013 A UFGS 23 07 00 Thermal Insulation for Mechanical Systems R Revised vapor barrier and insulation requirements.
Feb-2013 A UFGS 23 11 25 Facility Gas Piping C 1 Added CSST, Gas Shut-off, Pressure Regulator, Bolting Gasket and Identification requirements
Feb-2013 N UFGS 23 81 47 Water-Loop and Ground-Loop Heat Pump Systems C 1 Modified subpart 1.6 and notes before part 1
Feb-2013 A UFGS 26 42 15.00 10 Cathodic Protection System (Steel Water Tanks) R Complete update.
Feb-2013 S UFGS 26 51 00.00 40 Interior Lighting R Updated the entire section
Feb-2013 N UFGS 33 51 15 Natural-Gas / Liquid Petroleum Gas Distribution Pipelines C 1 Removed fiberglass piping, and added CSST and EFV
Feb-2013 N UFGS 46 07 53.13 Packaged Wastewater Treatment Equipment, Aeration C 1 Modified subpart 2.7.3.1
Feb-2013 N UFGS 46 43 21 Circular Clarifier Equipment C 2 Modified subpart 2.2.3.2
Dec-2012 A UFGS 23 07 00 Thermal Insulation for Mechanical Systems C 2 INTERIM RELEASE: Removed polyisocyanurate insulation throughout the section.
Nov-2012 S UFGS 01 32 17.00 20 Cost-Loaded Network Analysis Schedules (NAS) C 1 Modified subparts 1.4 and 1.4 to add Primavera P6
Nov-2012 S UFGS 01 33 00 Submittal Procedures C 2 In the last paragraph of the General Note, changed CONSTRUCTION to DESIGN-BID-BUILD within the Army tailoring tag
Nov-2012 A UFGS 01 45 35 Special Inspections C 1 Section title change only; formerly SPECIAL INSPECTION FOR SEISMIC- RESISTING SYSTEMS
Nov-2012 S UFGS 01 91 00.00 40 Commissioning N New (for NASA Only)
Nov-2012 S UFGS 03 62 16 Metallic Non-Shrink Grouting C 1 There was an incomplete statement in Subpart 2.1, which has been corrected
Nov-2012 A UFGS 04 20 00 Unit Masonry C 1 CCR: 2299: Added provisions for telescoping bar positioners
Nov-2012 S UFGS 05 14 00.13 Welding Structural Aluminum Framing C 2 Updated CSI Section Format per latest UFC 1-300-02, - Added Subpart 1.3, deleted Subpart 1.4
Nov-2012 S UFGS 05 52 00 Metal Railings C 2 Imperative language
Nov-2012 S UFGS 07 41 63 Fabricated Roof Panel Assemblies C 1 Tri-Annual Database Maintenance (TADM) completed
Nov-2012 S UFGS 07 41 63 Fabricated Roof Panel Assemblies C 1 Tri-Annual Database Maintenance which includes, updating CSI Section Format per latest UFC 1-300-02; Submittal Article compliance, Imperative language and a few minor changes
Nov-2012 A UFGS 08 33 13 Coiling Counter Doors C 2 CCR 1919: added test tags and warranty submittal
Nov-2012 S UFGS 08 33 23 Overhead Coiling Doors C 1 Updated Section Format per latest UFC 1-300-02,removed text (redundant) text from Submittal Article and located info in body of the text in the appropriate Part; added testing tags at several locations.
Nov-2012 A UFGS 08 34 59 Vault Doors and Day Gates C 1 Added Sustainability Requirements
Nov-2012 S UFGS 08 41 13 Aluminum-Framed Entrances and Storefronts C 1 Tri-Annual Database Maintenance (TADM) completed
Nov-2012 S UFGS 08 41 13 Aluminum-Framed Entrances and Storefronts C 1 Tri-Annual Database Maintenance which includes, updating CSI Section Format per latest UFC 1-300-02; Submittal Article compliance, Imperative language and a few minor changes.
Nov-2012 S UFGS 09 23 82 Fireproof Gypsum Plastering C 1 Updated CSI Section Format per latest UFC 1-300-02; added Subpart 1.2,1.2.1
Nov-2012 A UFGS 09 24 23 Cement Stucco C 1 Added Sustainability Requirements
Nov-2012 A UFGS 09 62 38 Static-Control Flooring N Superseding UFGS 09 65 36 Static-Control Resilient Flooring. Section update with addition of static-control carpet
Nov-2012 A UFGS 09 65 36 Static-Control Resilient Flooring D Superseded by UFGS 09 62 38 Static Control Flooring for conformance with current CSI MasterFormat.
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2012 S UFGS 09 67 23.13 Standard Resinous Flooring C 1 Updated CSI Section Format per latest UFC 1-300-02; modified Submittal Article; modified titles in Subpart 3.2.4, 3.3.1, 3.3.2 and 3.3, other minor revisions
Nov-2012 A UFGS 09 72 00 Wallcoverings R Title change from Wall Coverings. Deleted duplicate product information, updated submittal requirements and incorporated sustainability updates
Nov-2012 A UFGS 10 14 00.20 Interior Signage N Superseding UFGS 10 14 02 Interior Signage. Update of the entire section.