Release PA Action Change # Nature of Change or Revision
May-2025 N C 1

In response to the following: CCR 14812, added "dual frequency" to GPR in paragraph LOCATION OF UNDERGROUND UTILITIES (1.5); CCR 15262, changed to initial capital "Contract" in four locations; and CCR 16075, added new bracketed paragraph Utility Locations (1.5.2) to address requirements for locating underground utilities.

Feb-2024 N R Complete review and update to include removal of FAR references, NASA-tailored requirements, and included requirements on Navy drawings.
Aug-2021 N C 2 In response to CCR 9971, added note to Submittal Article for NAVFAC PAC requirement to remove Government approval of salvage plan, and modified corresponding paragraph in text.
May-2021 N C 1 In response to CCR 8732, unnecessary brackets were removed from the last sentence in the 2nd paragraph under (1.8) LOCATION OF UNDERGROUND UTILITIES retaining the sentence as a standard requirement.
Aug-2015 N R Revised throughout. Removed Project Environmental Goals covered under UFGS 01 33 29 Sustainability Reporting.
Nov-2014 N C 1 SRF Update: Replaces 01 35 40.00 20 ENVIRONMENTAL MANAGEMENT with 01 57 19.00 20 TEMPORARY ENVIRONMENTAL CONTROLS.
Aug-2011 N R Modifed note before PART 1; modified note in subpart 1.14.1; added note in part 1.5; removed all notes in PART 3
Jan-2008 N R Added NASA requirements; this section supersedes UFGS 01 11 00.00 40
Jul-2007 N R Corrected hyperlink to CCB.