History: Below is a listing of the Revisions and Changes made to this UFGS.
KEY | PREPARING ACTIVITY (PA) | A Army | N Navy | F Air Force | S NASA [ARCHIVED] |
---|---|---|---|---|---|
ACTION | N New | R Revision | C Change | D Deletion |
Release | PA | Date | Action | Change # | Nature of Change or Revision |
---|---|---|---|---|---|
May-2025 | N | Feb-2024 | C | 1 | In response to the following: CCR 14812, added "dual frequency" to GPR in paragraph LOCATION OF UNDERGROUND UTILITIES (1.5); CCR 15262, changed to initial capital "Contract" in four locations; and CCR 16075, added new bracketed paragraph Utility Locations (1.5.2) to address requirements for locating underground utilities. |
Feb-2024 | N | Feb-2024 | R | Complete review and update to include removal of FAR references, NASA-tailored requirements, and included requirements on Navy drawings. | |
Aug-2021 | N | Aug-2015 | C | 2 | In response to CCR 9971, added note to Submittal Article for NAVFAC PAC requirement to remove Government approval of salvage plan, and modified corresponding paragraph in text. |
May-2021 | N | Aug-2015 | C | 1 | In response to CCR 8732, unnecessary brackets were removed from the last sentence in the 2nd paragraph under (1.8) LOCATION OF UNDERGROUND UTILITIES retaining the sentence as a standard requirement. |
Aug-2015 | N | Aug-2015 | R | Revised throughout. Removed Project Environmental Goals covered under UFGS 01 33 29 Sustainability Reporting. | |
Nov-2014 | N | Aug-2011 | C | 1 | SRF Update: Replaces 01 35 40.00 20 ENVIRONMENTAL MANAGEMENT with 01 57 19.00 20 TEMPORARY ENVIRONMENTAL CONTROLS. |
Aug-2011 | N | Aug-2011 | R | Modifed note before PART 1; modified note in subpart 1.14.1; added note in part 1.5; removed all notes in PART 3 | |
Jan-2008 | N | Jan-2008 | R | Added NASA requirements; this section supersedes UFGS 01 11 00.00 40 | |
Jul-2007 | N | Jul-2007 | R | Corrected hyperlink to CCB. | |
Jul-2006 | N | Jul-2006 | R | Added sustainable design requirements |