May-2025 |
N
|
UFGS 33 52 23.15 POL Service Piping Welding |
May-2025 |
R
|
|
Complete review and update. |
May-2025 |
N
|
UFGS 33 52 40 Fuel Systems Piping (Non-Hydrant) |
May-2025 |
R
|
|
Complete review and update. |
May-2025 |
A
|
UFGS 33 56 10 Factory-Fabricated Fuel Storage Tanks |
May-2025 |
R
|
|
Complete review and update. |
May-2025 |
N
|
UFGS 33 56 21.17 Single Wall Aboveground Fixed Roof Steel POL Storage Tank |
May-2025 |
R
|
|
Complete review and update. |
May-2025 |
N
|
UFGS 33 56 21.18 Single Wall POL Tank Undertank Interstitial Space |
May-2025 |
R
|
|
Complete review and update. |
May-2025 |
N
|
UFGS 41 22 13.19 Jib Cranes |
May-2025 |
N
|
|
New UFGS Section to address jib cranes. |
May-2025 |
N
|
UFGS 41 22 23.19 Monorail Hoists |
May-2025 |
R
|
|
Complete review and update. |
Feb-2025 |
N
|
UFGS 01 14 00 Work Restrictions |
Nov-2022 |
C
|
4 |
In response to multiple CCRs updates made throughout including removal of NCACS ID badges paragraph, removal/replacement of "shall" and "must", update to Guantanamo Bay requirements, and addition of the reference "EM 385-1-1". |
Feb-2025 |
N
|
UFGS 01 20 00 Price and Payment Procedures |
Nov-2020 |
C
|
5 |
In response to CCR 15538, update made to paragraph Obligation of Government Payments (1.7.1). |
Feb-2025 |
N
|
UFGS 01 30 00 Administrative Requirements |
Feb-2025 |
C
|
5 |
In response to multiple CCRs, updates have been made to paragraphs Progress and Completion Pictures (1.5), Non-Compliance Actions (1.7.4), Facility Turnover Planning Meetings (1.11), Partnering (1.14), and Performance Assessment Plan (PAP (1.15). A PAP document has also been added to the Related Materials. |
Feb-2025 |
A
|
UFGS 02 51 19 Solidification and Stabilization Decontamination |
Feb-2025 |
R
|
|
Complete review and update. |
Feb-2025 |
A
|
UFGS 02 53 16.13 Remediation of Contaminated Soils by Thermal Desorption |
Feb-2025 |
R
|
|
Complete review and update. |
Feb-2025 |
A
|
UFGS 02 53 16.16 In-Situ Thermal Remediation |
Feb-2025 |
N
|
|
New UFGS Section to address in-situ thermal remediation of materials contaminated by hazardous or toxic organic wastes and/or by petroleum, oil, or lubricants. |
Feb-2025 |
A
|
UFGS 02 54 19.13 Bioremediation Using Landfarming |
Feb-2025 |
R
|
|
Complete review and update. |
Feb-2025 |
A
|
UFGS 02 54 19.16 Bioremediation of Soils Using Windrow Composting |
Feb-2025 |
R
|
|
Complete review and update. |
Feb-2025 |
A
|
UFGS 02 54 23 Soil Washing Through Separation/Solubilization |
Feb-2025 |
R
|
|
Complete review and update. |
Feb-2025 |
A
|
UFGS 02 56 13.13 Geomembrane Waste Containment |
Feb-2025 |
R
|
|
Complete review and update. |
Feb-2025 |
A
|
UFGS 02 56 13.16 Clay Waste Containment |
Feb-2025 |
R
|
|
Complete review and update. |
Feb-2025 |
A
|
UFGS 02 56 13.19 Geosynthetic Clay Liner Waste Containment |
Feb-2025 |
R
|
|
Complete review and update. |
Feb-2025 |
A
|
UFGS 02 61 13 Excavation and Handling of Contaminated Material |
Feb-2025 |
R
|
|
Complete review and update. |
Feb-2025 |
N
|
UFGS 02 61 23 Removal and Disposal of PCB Contaminated Soils |
Feb-2025 |
R
|
|
Complete review and update. |
Feb-2025 |
A
|
UFGS 02 66 13 Select Fill and Topsoil for Landfill Cover |
Feb-2025 |
R
|
|
Complete review and update. |
Feb-2025 |
A
|
UFGS 02 72 13.13 Point of Entry Treatment for Drinking Water |
Feb-2025 |
N
|
|
New UFGS Section to address requirements for drinking water treatment via a point of entry treatment (POET) system. |
Feb-2025 |
N
|
UFGS 22 05 48.00 20 Mechanical Sound, Vibration, and Seismic Control |
Apr-2006 |
D
|
|
Archived with no replacement.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
Feb-2025 |
A
|
UFGS 23 05 48.19 Seismic Bracing Mechanical Systems |
Feb-2025 |
R
|
|
Complete review and update, including title change; brackets removed [SEISMIC] BRACING FOR MECHANICAL SYSTEMS. |
Feb-2025 |
A
|
UFGS 23 30 00 HVAC Air Distribution |
Feb-2025 |
R
|
|
Complete review and update. |
Feb-2025 |
A
|
UFGS 23 35 16 Mechanical Engine[ and Welding Fume] Exhaust Systems |
Feb-2025 |
N
|
|
Superseded UFGS-23 35 16.17 10 MECHANICAL ENGINE[ AND WELDING FUME] EXHAUST SYSTEMS. |
Feb-2025 |
A
|
UFGS 23 35 16.17 10 Mechanical Engine [and Welding Fume] Exhaust Systems |
May-2020 |
D
|
|
Superseded by UFGS-23 35 16 MECHANICAL ENGINE[ AND WELDING FUME] EXHAUST SYSTEMS.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
Feb-2025 |
N
|
UFGS 23 81 47 Water-Loop and Ground-Loop Heat Pump Systems |
Feb-2025 |
R
|
|
Complete review and update. |
Feb-2025 |
F
|
UFGS 33 51 13.00 30 Natural-Gas Metering |
May-2010 |
D
|
|
Archived with no replacement.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
Feb-2025 |
N
|
UFGS 33 63 13 Exterior Underground Steam Distribution System |
Feb-2025 |
R
|
|
Complete review and update. |
Nov-2024 |
N
|
UFGS 08 39 55.00 20 Navy Standard Earth-Covered Magazine Doors |
Nov-2024 |
N
|
|
New Navy-only section to cover the requirements for doors for earth covered Navy magazine definitive drawings, including security, operations, and controls. |
Nov-2024 |
A
|
UFGS 09 65 00 Resilient Flooring |
Nov-2024 |
R
|
|
Complete review and update. |
Nov-2024 |
A
|
UFGS 09 68 00 Carpeting |
Nov-2024 |
R
|
|
Complete review and update. |
Nov-2024 |
A
|
UFGS 09 69 13 Rigid Grid Access Flooring |
Nov-2024 |
R
|
|
Complete review and update. |
Nov-2024 |
A
|
UFGS 09 69 19 Stringerless Access Flooring |
Nov-2024 |
R
|
|
Complete review and update. |
Nov-2024 |
A
|
UFGS 10 22 43 Sliding Partitions |
Nov-2024 |
R
|
|
Complete review and update. |
Nov-2024 |
N
|
UFGS 11 31 13 Electric Kitchen Equipment |
Aug-2017 |
C
|
2 |
In response to CCR 11242, Related Requirements (1.2) has been tailored for Navy. |
Nov-2024 |
N
|
UFGS 22 00 00 Plumbing, General Purpose |
May-2024 |
C
|
1 |
In response to CCR #15264, MSS SP-91 has been added to the Reference Article and the paragraph VALVES (2.3) |
Nov-2024 |
N
|
UFGS 23 35 19.00 20 Industrial Ventilation and Exhaust |
Feb-2010 |
C
|
3 |
In response to CCR 10381, replaced "Division 16" with "Division 26" in Electrical Ground Continuity paragraph (3.1.2) |
Nov-2024 |
N
|
UFGS 23 51 43.02 20 Electrostatic Dust Collector of Flue Gas Particulates |
Apr-2006 |
C
|
1 |
In response to CCR 10402, replaced "Division 16" with "Division 26" in paragraphs Material and Workmanship (2.3.1.1) and Equipment Enclosure Grounding (2.3.2.2) |
Nov-2024 |
N
|
UFGS 23 51 43.03 20 Fabric Filter Dust Collector of Fly Ash Particles in Flue Gas |
Feb-2010 |
C
|
1 |
In response to CCR 10403, replaced "Division 16" with "Division 26" in Specifier Notes. |
Nov-2024 |
N
|
UFGS 26 13 02 Pad-Mounted Solid Dielectric Switchgear |
Nov-2024 |
N
|
|
New UFGS section to address solid dielectric, dead-front, enclosed and non-enclosed, pad-mounted switchgear with load and fault interrupting ways, with maximum ratings of 600 amperes and 38 kV (35kV Class), 60 Hz. |
Nov-2024 |
A
|
UFGS 26 42 19.00 10 Cathodic Protection Systems (Impressed Current) for Civil Works Structures |
Nov-2024 |
N
|
|
New Section superseding UFGS 26 42 19.10 CATHODIC PROTECTION SYSTEMS (IMPRESSED CURRENT) FOR LOCK MITER GATES. |
Nov-2024 |
A
|
UFGS 26 42 19.10 Cathodic Protection Systems (Impressed Current) For Lock Miter Gates |
Nov-2008 |
D
|
|
Superseded by UFGS 26 42 19.00 10 CATHODIC PROTECTION SYSTEMS (IMPRESSED CURRENT) FOR CIVIL WORKS STRUCTURES.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
Nov-2024 |
A
|
UFGS 31 33 20 Void and Permeation Grouting |
Nov-2024 |
N
|
|
New UFGS Section to address permeation grouting, void grouting, and grouting in unconsolidated deposits. |
Nov-2024 |
A
|
UFGS 31 33 30 Limited Mobility Grouting in Soil |
Nov-2024 |
N
|
|
New UFGS Section to address limited mobility grouting (LMG) with cementitious grout. |
Nov-2024 |
N
|
UFGS 32 01 19.61 Sealing of Joints in Rigid Pavement |
Nov-2019 |
C
|
1 |
In response to CCR 10403, replaced "Division 16" with "Division 26" in Specifier Notes |
Nov-2024 |
A
|
UFGS 32 17 23 Pavement Markings |
Aug-2016 |
D
|
|
Superseded by UFGS 32 17 23.16 ROAD AND PARKING LOT PAVEMENT MARKINGS and 32 17 23.19 AIRFIELD PAVEMENT MARKINGS.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
Nov-2024 |
A
|
UFGS 32 17 23.16 Road and Parking Lot Pavement Markings |
Nov-2024 |
N
|
|
New Section; superseding UFGS-32 17 23 PAVEMENT MARKINGS. |
Nov-2024 |
A
|
UFGS 32 17 23.19 Airfield Pavement Markings |
Nov-2024 |
N
|
|
New Section; superseding UFGS-32 17 23 PAVEMENT MARKINGS. |
Nov-2024 |
A
|
UFGS 35 31 19 Stone, Channel, Shoreline/Coastal Protection for Structures |
Nov-2023 |
D
|
|
Superseded by UFGS-35 31 19.40 STONE REVETMENTS.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
Nov-2024 |
A
|
UFGS 35 31 19.40 Stone Revetments |
Nov-2024 |
N
|
|
New Section superseding UFGS 35 31 19 STONE, CHANNEL, SHORLINE/COASTAL PROTECTION FOR STRUCTURES. Non-technical revision to update section title and number. |
Nov-2024 |
N
|
UFGS 43 21 29 Flow Measuring Equipment (Potable Water) (Sewage Treatment Plant) |
Apr-2006 |
C
|
1 |
In response to CCR 10405, replaced "Division 16" with "Division 26" in ELECTRICAL REQUIREMENTS paragraph (2.3) |
Aug-2024 |
N
|
UFGS Section Template (Template CCRs Only) |
Aug-2024 |
R
|
|
Within the Submittals Article, removed paragraph in the standard notes referencing the use of brackets in the standard paragraph; brackets replaced with “AIR FORCE, NAVY” and “ARMY” tailoring in the standard paragraph; outside brackets removed in the ARMY tailoring tag for the “G” submittals: |
Aug-2024 |
N
|
UFGS 01 14 00 Work Restrictions |
Nov-2022 |
C
|
3 |
In response to CCR 12882, updated SPECIAL SCHEDULING REQUIREMENTS paragraph (1.4) to include list item for restricted access areas. This information was removed from UFGS-01 50 00 and relocated here. |
Aug-2024 |
N
|
UFGS 01 20 00 Price and Payment Procedures |
Nov-2020 |
C
|
4 |
Updated to clarify cost loading and price and payment procedures. |
Aug-2024 |
N
|
UFGS 01 30 00 Administrative Requirements |
Nov-2020 |
C
|
4 |
In response to the following CCR 15440, updated for USACE adoption of Red Zone Process; CCR 11650, added optional ARMY tailoring for submittal Color Boards and Color Board paragraph (1.3) |
Aug-2024 |
A
|
UFGS 01 32 01.00 10 Project Schedule |
Aug-2023 |
C
|
1 |
Incorporated various CCRs. |
Aug-2024 |
N
|
UFGS 01 32 17.00 20 Cost-Loaded Network Analysis Schedules (NAS) |
Nov-2023 |
C
|
1 |
Updated to clarify cost loading and price and payment procedures. |
Aug-2024 |
N
|
UFGS 01 32 17.00 20 Cost-Loaded Network Analysis Schedules (NAS) |
Nov-2023 |
C
|
1 |
Updated to clarify cost loading and price and payment procedures. |
Aug-2024 |
A
|
UFGS 01 50 00 Temporary Construction Facilities and Controls |
Nov-2020 |
C
|
3 |
Incorporated various CCRs. |
Aug-2024 |
N
|
UFGS 03 30 00 Cast-In-Place Concrete |
Feb-2019 |
C
|
9 |
In response to CCR 15076, added "Type IT" cements to items i, ii, and iii in paragraph Freezing and Thawing Resistance (2.5.2.2) |
Aug-2024 |
N
|
UFGS 05 05 20 Post-Installed Concrete and Masonry Anchors |
May-2022 |
C
|
1 |
In response to CCR 15088, replaced Material Safety Data Sheets (MSDS) with Safety Data Sheets (SDS) in QUALITY ASSURANCE paragraph (1.5) |
Aug-2024 |
N
|
UFGS 05 50 13 Miscellaneous Metal Fabrications |
Aug-2024 |
R
|
|
Complete review and update. |
Aug-2024 |
N
|
UFGS 05 51 33 Metal Ladders |
Aug-2024 |
R
|
|
Complete review and update. |
Aug-2024 |
N
|
UFGS 06 20 00 Finish Carpentry |
Aug-2024 |
R
|
|
Complete review and update. |
Aug-2024 |
N
|
UFGS 07 27 19.01 Self-Adhering Air Barriers |
Aug-2023 |
C
|
1 |
In response to CCR 13571, corrected the air leakage rate in list item b. Assembly Air Leakage, under Physical Properties paragraph (2.1.1) |
Aug-2024 |
N
|
UFGS 08 34 16.10 Horizontal Rolling Steel Doors |
Nov-2021 |
C
|
1 |
In response to CCR 15267, corrected wind velocities in Wind Loads paragraph (1.3.2.1) to coordinate with UFC 3-301-01. |
Aug-2024 |
N
|
UFGS 08 34 16.20 Vertical Lift Fabric Doors |
Aug-2021 |
C
|
2 |
Corrected wind velocities in Wind Loads paragraph (1.3.2.1) to coordinate with UFC 3-301-01. |
Aug-2024 |
N
|
UFGS 08 34 63 Detention Hollow Metal Frames, Doors, and Door Frames |
Aug-2024 |
R
|
|
Complete review and update. |
Aug-2024 |
N
|
UFGS 08 56 53 Blast Resistant Tempered Glass Windows |
Aug-2020 |
C
|
1 |
In response to CCR 12317, updated section to active language (replacing "must") |
Aug-2024 |
N
|
UFGS 08 71 63 Detention Hardware |
Aug-2024 |
R
|
|
Complete review and update. |
Aug-2024 |
N
|
UFGS 09 22 00 Supports for Plaster and Gypsum Board |
Aug-2024 |
R
|
|
Complete review and update. |
Aug-2024 |
N
|
UFGS 09 22 36 Lath |
Aug-2024 |
R
|
|
Complete review and update. |
Aug-2024 |
N
|
UFGS 09 23 00 Gypsum Plastering |
Aug-2024 |
R
|
|
Complete review and update. |
Aug-2024 |
N
|
UFGS 09 26 00 Veneer Plaster |
Aug-2024 |
R
|
|
Complete review and update. |
Aug-2024 |
N
|
UFGS 09 29 00 Gypsum Board |
Aug-2024 |
R
|
|
Complete review and update. Incorporate CCRs #4960, 8088, 10091, 10122, 10479, 10609. |
Aug-2024 |
N
|
UFGS 09 97 23.16 Linseed Oil Protection of Concrete Surfaces |
Aug-2024 |
R
|
|
Complete review and update. |
Aug-2024 |
N
|
UFGS 10 21 23.16 Cubicle Track and Hardware |
Aug-2024 |
R
|
|
Complete review and update. |
Aug-2024 |
N
|
UFGS 10 22 13 Wire Mesh Partitions |
Aug-2024 |
R
|
|
Complete review and update. Incorporate CCRs #10216, 13813. |
Aug-2024 |
N
|
UFGS 10 22 26.13 Accordion Folding Partitions |
Aug-2024 |
R
|
|
Complete review and update. |
Aug-2024 |
N
|
UFGS 10 22 26.23 Coiling Partitions |
Aug-2024 |
R
|
|
Complete review and update. |
Aug-2024 |
N
|
UFGS 10 51 13 Lockers |
Aug-2024 |
R
|
|
Complete review and update including title change from “Metal Lockers” to “Lockers” |
Aug-2024 |
N
|
UFGS 10 56 13 Steel Shelving |
Aug-2024 |
R
|
|
Complete review and update. |
Aug-2024 |
N
|
UFGS 12 55 00 Detention Furniture and Accessories |
Aug-2024 |
R
|
|
Complete review and update. |
Aug-2024 |
N
|
UFGS 23 05 15 Common Piping for HVAC |
May-2022 |
C
|
2 |
In response to CCR 13457, added requirement for Type 19 and 23 C-clamps |
Aug-2024 |
A
|
UFGS 23 07 00 Thermal Insulation for Mechanical Systems |
Aug-2024 |
R
|
|
Complete review and update. |
Aug-2024 |
N
|
UFGS 23 09 53.00 20 Space Temperature Control Systems |
Feb-2010 |
C
|
3 |
Added PNEUMATIC tailoring option. |
Aug-2024 |
N
|
UFGS 33 11 00 Water Utility Distribution Piping |
Aug-2024 |
R
|
|
Complete review and update. |
Aug-2024 |
A
|
UFGS 33 60 02 Aboveground Heat Distribution System |
Aug-2024 |
R
|
|
Complete review and update. |
Aug-2024 |
A
|
UFGS 33 61 13 Pre-Engineered Underground Heat Distribution System |
Aug-2024 |
R
|
|
Complete review and update. |
Aug-2024 |
N
|
UFGS 34 60 13 Electric Vehicle Charging Facility (EVCF) |
Aug-2024 |
R
|
|
Complete review and update including renumber/retitle from UFGS-11 11 37 ELECTRIC VEHICLE SUPPLY EQUIPMENT to UFGS-34 60 13 ELECTRIC VEHICLE CHARGING FACILITY (EVCF). |
May-2024 |
N
|
UFGS 01 14 00 Work Restrictions |
Nov-2022 |
C
|
2 |
In response to CCR 14369, added new submittal item and paragraph to comply with Army and Army National Guard requirements for 3Rs Explosive Education Training Certificate. |
May-2024 |
N
|
UFGS 01 35 26 Governmental Safety Requirements |
May-2024 |
R
|
|
Complete review and update addressing changes within the 2024 EM 385-1-1. |
May-2024 |
N
|
UFGS 01 45 00 Quality Control |
Aug-2023 |
C
|
1 |
Added Navy tailoring in Duties paragraph (1.6.2.1) for reference to 01 35 26. In response to CCRs 13984 and 14115, replaced "shall" throughout the text and CCR 14091, updated the Qualifications paragraph (1.6.2.2) to clear up ambiguity in QCM requirement. |
May-2024 |
N
|
UFGS 01 45 35 Special Inspections |
May-2024 |
R
|
|
Complete review and update to align with IBC 2023 and ASCE 7-22; Related Materials have also been updated |
May-2024 |
N
|
UFGS 03 31 29 Marine Concrete with Service Life Modeling |
May-2024 |
R
|
|
Complete review and update to further address issues from industry and improve specification. |
May-2024 |
N
|
UFGS 03 31 30 Marine Concrete |
May-2024 |
R
|
|
Complete review and update to further address issues from industry and improve specification. |
May-2024 |
N
|
UFGS 03 52 00 Lightweight Concrete Roof Insulation |
Aug-2011 |
D
|
|
Archived with no replacement.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |