Export to CSV

Below is a listing of the Revisions and Changes made to UFGS Sections for each release. You can narrow the list by selecting a UFGS Release date from the drop-down and clicking 'Apply'.

KEYPREPARING ACTIVITY (PA)A ArmyN NavyF Air ForceS NASA [ARCHIVED]
ACTIONN NewR RevisionC ChangeD Deletion
Release PA UFGS Section Action Change # Nature of Change or Revision
Aug-2008 A UFGS 32 11 10 Drainage Layer R Compliance with CSI SectionFormat
Aug-2008 A UFGS 32 11 16 [Base Course for Rigid] [ and ] [Subbases for Flexible] Paving R Compliance with CSI SectionFormat
Aug-2008 A UFGS 32 11 23 [Aggregate Base Course] [and][or] [Graded Crushed Aggregate Base Course] for Flexible Paving R Compliance with CSI SectionFormat
Aug-2008 N UFGS 32 11 24 Graded Crushed Aggregate Base Course for [Pervious] [Flexible] Pavement R Section References (SRF) update
Aug-2008 A UFGS 32 11 26 Hot-Mix Bituminous Base Course for Roads and Streets R Compliance with CSI SectionFormat
Aug-2008 A UFGS 32 11 27 Bituminous-Stabilized Base Course, Subbase, or Subgrade R Compliance with CSI SectionFormat
Aug-2008 A UFGS 32 11 29 Lime-[Stabilized] [Modified] Subgrade R Compliance with CSI SectionFormat
Aug-2008 N UFGS 32 11 30 Lime Treated Subgrade [Lime Modified Soils] R Minor revisions throughout
Aug-2008 N UFGS 32 11 33 Cement Stabilized [Base] [Subbase] Course at Airfields and Roads R Minor revisions throughout
Aug-2008 A UFGS 32 11 34 Portland Cement-Stabilized Base or Subbase Course R Compliance with CSI SectionFormat
Aug-2008 A UFGS 32 12 10 Bituminous Tack and Prime Coats R Compliance with CSI SectionFormat
Aug-2008 A UFGS 32 12 11 Bituminous Surface Treatment R Compliance with CSI SectionFormat
Aug-2008 A UFGS 32 12 16 Hot-Mix Asphalt (HMA) for Roads R Compliance with CSI SectionFormat
Aug-2008 A UFGS 32 12 18 Resin Modified Pavement Surfacing Material R Compliance with CSI SectionFormat
Aug-2008 A UFGS 32 12 19 Bituminous Binder and Wearing Courses (Central-Plant Cold-Mix) R Compliance with CSI SectionFormat
Aug-2008 A UFGS 32 12 20 Porous Friction Course for Airfields and Roads D Superseded by UFGS 32 12 43.16 with no title change
Aug-2008 A UFGS 32 12 21 Bituminous Road-Mix Surface Course R Compliance with CSI SectionFormat
Aug-2008 A UFGS 32 12 22.00 10 Polymer Concrete-Micro-Overlay (PCMO) For Fuel and Abrasion Resistant Wearing Surfaces R Compliance with CSI SectionFormat
Aug-2008 A UFGS 32 12 37 Fuel-Resistant (Coal Tar) Sealer R Compliance with CSI SectionFormat
Aug-2008 A UFGS 32 12 43.16 Porous Friction Course for Airfields and Roads N Superseding UFGS 32 12 20 with same title.
Aug-2008 N UFGS 32 13 13.06 Portland Cement Concrete Pavement for Roads and Site Facilities R Minor revisions throughout
Aug-2008 A UFGS 32 13 17 Stone Matrix Asphalt (SMA) for Airfield Pavements R Compliance with CSI SectionFormat
Aug-2008 N UFGS 33 05 16 Concrete Poles R Section References (SRF) update
Aug-2008 N UFGS 33 11 23 Natural Gas and Liquid Petroleum Piping N Renumbered; Superseding UFGS 33 11 23.00 20 with same title
Aug-2008 N UFGS 33 11 23.00 20 Natural Gas and Liquid Petroleum Piping D Superseded; Renumbered as UFGS 33 11 23 with no title change
Aug-2008 F UFGS 33 12 33.00 30 Water Meters N New Section
Aug-2008 A UFGS 33 24 13 Groundwater Monitoring Wells R Revisions throughout during unification/disassembly of UFGS for MF04 compliance; Title changed from Ground-Water Monitoring Wells
Aug-2008 N UFGS 33 52 90.00 20 Welding for POL Service Piping R Deleted Table I; Mandatory Minimum Nondestructive Examinations (subpara. i) and tags; Deleted last sentence (subpara j); Deleted Note in 3.2 and Table in 3.2 i
Aug-2008 N UFGS 33 71 02.00 20 Underground Electrical Distribution R Changed Transmission and Distribution to Electrical Distribution and corrected URL for graphics
Aug-2008 S UFGS 33 71 39.13 40 Overhead High-Voltage Wiring D Redundant to UFGS 33 71 01 Overhead Transmission and Distribution (Preparing Activity NAVFAC)
Aug-2008 S UFGS 33 73 00.00 40 Utility Transformers R Minor Edits
Aug-2008 S UFGS 33 75 00.00 40 Switchgear and Protection Devices R Minor Edits; Title changed from High-Voltage Switchgear and Protection Devices
Aug-2008 S UFGS 33 77 19.00 40 Medium-Voltage Switch R Minor Edits; Title changed from Gas Medium-Voltage Circuit Breaker
Aug-2008 S UFGS 33 77 36 Medium-Voltage Utility Fuses D Renumbered/ Superseded by UFGS 33 77 36.00 40 with same title
Aug-2008 S UFGS 33 77 36.00 40 Medium-Voltage Utility Fuses N Section reinstated and renumbered; Superseding UFGS 33 77 36 with same title
Aug-2008 N UFGS 34 43 00.00 20 Airfield Lighting R Deleted reference to L-16303 and Note; changed Transmission Distribution to Electrical Distribution; added Part 3.12
Aug-2008 N UFGS 35 59 13.14 20 Polymeric Piles R Added option for warranty length, paragraph 2.10
Aug-2008 N UFGS 35 59 13.14 20 Polymeric Piles R Added option for warranty length
Aug-2008 N UFGS 35 59 13.16 Extruded and Molded Marine Fenders R Corrected Submittal (SUB) tags
Aug-2008 S UFGS 40 41 13.13 40 Process Piping Electrical Resistance Heat Tracing D Superseded by UFGS 23 82 46 Electric Unit Heaters
Aug-2008 N UFGS 41 22 03.13 20 Monorails with Manual Hoists D Superseded by UFGS 41 22 23.19 Monorail Hoists and UFGS 41 22 13.14 Bridge Cranes, Overhead Electric, Top Running
Aug-2008 N UFGS 41 22 03.16 20 Monorails with Air Motor Powered Hoists D Superseded by UFGS 41 22 23.19 Monorail Hoists
Aug-2008 S UFGS 42 22 00.00 40 Process Chillers and Coolers R Section References (SRF) update
Aug-2008 S UFGS 42 22 00.00 40 Process Chillers and Coolers R Section References (SRF) update
Aug-2008 S UFGS 42 22 13 Centrifugal Process Chillers and Coolers N Renumbered/ Superseding UFGS 42 22 13.00 40 with same title
Aug-2008 S UFGS 42 22 13.00 40 Centrifugal Process Chillers and Coolers D Renumbered/ Superseded by UFGS 42 22 13 with no title change
Aug-2008 S UFGS 42 22 16 Reciprocating Process Chillers and Coolers N Renumbered/ Superseding UFGS 42 22 16.00 40 with same title
Aug-2008 S UFGS 42 22 16.00 40 Reciprocating Process Chillers and Coolers D Renumbered/ Superseded by UFGS 42 22 16 with no title change
Aug-2008 S UFGS 42 23 13 Process Condensers N Renumbered; Superseding UFGS 42 23 13.00 40 with same title
Aug-2008 S UFGS 42 23 13.00 40 Process Condensers D Renumbered/ Superseded by UFGS 42 23 13 with no title change
Aug-2008 S UFGS 43 41 13.19 Fiberglass Gas Liquid Pressure Vessels R Section References (SRF) update
Apr-2008 N UFGS 00 73 03 Supplementary Conditions for Azores Projects R Added URL for file attachments/graphics
Apr-2008 N UFGS 00 73 04 Supplementary Conditions for Projects in Mediterranean Area R Added URL for file attachments/graphics
Apr-2008 S UFGS 01 35 23.00 40 Owner Safety Requirements D Superseded by UFGS 01 35 26 Governmental Safety Requirements (Preparing Activity: NAVFAC)
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Apr-2008 N UFGS 01 35 26 Governmental Safety Requirements N Unified section; superseding UFGS 01 35 29 Safety and Occupational Health Requirements
Apr-2008 N UFGS 01 35 29 Safety and Occupational Health Requirements D Superseded by UFGS 01 35 26 Governmental Safety Requirements
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Apr-2008 N UFGS 01 45 02 NAVFAC Quality Control R Updated throughout
Apr-2008 N UFGS 01 45 02.10 NAVFAC Quality Control for Minor Construction R Updated throughout
Apr-2008 A UFGS 01 57 16 Temporary Pest Control R Compliance with CSI SectionFormat
Apr-2008 N UFGS 01 57 19.00 20 Temporary Environmental Controls R Minor revisions throughout
Apr-2008 A UFGS 01 57 23 Temporary Storm Water Pollution Control R Compliance with CSI SectionFormat
Apr-2008 N UFGS 01 58 00 Project Identification R Updated Project Sign requirements
Apr-2008 A UFGS 03 30 04 Concrete for Minor Structures D Superseded by UFGS 03 30 53 Miscellaneous Cast-in-Place Concrete
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Apr-2008 A UFGS 03 30 53 Miscellaneous Cast-In-Place Concrete N Superseding UFGS 03 30 04 Concrete for Minor Structures and UFGS 03 30 53.00 40 Miscellaneous Cast-in-Place Concrete
Apr-2008 S UFGS 03 30 53.00 40 Miscellaneous Cast-in-Place Concrete D Superseded by UFGS 03 30 53 Miscellaneous Cast-in-Place Concrete (Preparing Activity: USACE)
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Apr-2008 S UFGS 03 41 16 Precast Concrete Slabs (Max. Span 8'-0" O.C.) N Superseding UFGS 03 50 00.00 40 Cast Decks and Underlayments
Apr-2008 A UFGS 03 41 33.00 10 Precast/Prestressed Concrete Floor and Roof Units D Superseded by UFGS 03 41 33 Precast Structural Pretensioned Concrete (Preparing Activity: NASA, 01/08)
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Apr-2008 N UFGS 03 45 33 Precast [Prestressed] Structural Concrete R Minor revisions throughout
Apr-2008 S UFGS 03 50 00.00 40 Cast Decks and Underlayments D Superseded by UFGS 03 41 16 Precast Concrete Slabs (Max. 8'-0" O.C.)
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Apr-2008 A UFGS 03 51 00 Roof Decking, Cast-in-Place Low Density Concrete D Superseded by UFGS 03 52 16 Lightweight Insulating Concrete
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Apr-2008 A UFGS 03 51 16 Gypsum Plank Decking (Contractor's Option) D Superseded by UFGS 03 55 16 Gypsum Concrete Floor Planks
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Apr-2008 A UFGS 03 52 16 Lightweight Insulation Concrete N Superseding UFGS 03 51 00 Roof Decking, Cast-in-Place Low Density Concrete
Apr-2008 A UFGS 03 55 16 Gypsum Concrete Floor Planks N Superseding UFGS 03 51 16 Gypsum Plank Decking (Contractor's Option)
Apr-2008 S UFGS 05 51 00 Metal Stairs N Superseding UFGS 05 51 00.00 40 Metal Stairs
Apr-2008 S UFGS 05 51 00.00 40 Metal Stairs D Superseded; Renumbered as UFGS 05 51 00 with no title change
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Apr-2008 S UFGS 05 52 00 Metal Railings N Due to Disassembly
Apr-2008 N UFGS 08 44 00 Curtain Wall and Glazed Assemblies R Title changed from Glazed Curtain Wall; Superseding UFGS 08 44 00.00 40 Curtain Wall and Glazed Assemblies
Apr-2008 S UFGS 08 44 00.00 40 Curtain Wall and Glazed Assemblies D Superseded by UFGS 08 44 00 Curtain Wall and Glazed Assemblies (Preparing Activity: NAVFAC)
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Apr-2008 A UFGS 09 67 00 Fluid-Applied Flooring D Superseded by 09 67 23.14 Chemical Resistive Resinous Flooring
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Apr-2008 S UFGS 09 67 23.13 Standard Resinous Flooring R Changes made throughout
Apr-2008 A UFGS 09 67 23.14 Chemical Resistant Resinous Flooring N Superseding UFGS 09 67 00 Fluid-Applied Flooring
Apr-2008 A UFGS 14 21 23 Electric Traction Passenger Elevators C 1 Preparing Activity Changed from NAVFAC to USACE
Apr-2008 N UFGS 21 13 00.00 20 Wet-Pipe Fire Suppression Sprinklers D Superseded by UFGS 21 13 13.00 20 Wet Pipe Fire Sprinkler System, Fire Protection
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Apr-2008 N UFGS 21 13 13.00 20 Wet Pipe Sprinkler System, Fire Protection N Superseding UFGS 21 13 00.00 20 Wet-Pipe Fire Suppression Sprinklers
Apr-2008 A UFGS 21 30 00 Fire Pumps R Compliance with CSI SectionFormat
Apr-2008 N UFGS 22 00 00 Plumbing, General Purpose R Updated throughout
Apr-2008 S UFGS 22 10 00.00 40 Plumbing Piping and Pumps D Superseded by UFGS 22 10 00.00 10 Vertical Pumps, Axial-Flow and Mixed Flow Impeller Type
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Apr-2008 S UFGS 22 14 29.00 Sump Pumps R Section References (SRF) update
Apr-2008 S UFGS 22 15 13.16 40 High-Pressure Compressed-Air Piping and Valves, Stainless R Section References (SRF) update
Apr-2008 S UFGS 22 15 14.00 40 General Service Compressed-Air Systems, High Pressure D Redundant to UFGS 22 15 13.16 40 High-Pressure Compressed-Air Piping and Valves Stainless and UFGS 22 15 26.00 20 High and Medium Pressure Compressed Air Piping
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Apr-2008 S UFGS 22 15 14.00 40 General Service Compressed-Air Systems, Low Pressure R Section References (SRF) update
Apr-2008 A UFGS 22 33 30.00 10 Solar Water Heating Equipment R Compliance with CSI SectionFormat
Apr-2008 S UFGS 22 42 00.00 40 Commercial Plumbing Fixtures D Redundant to UFGS 22 00 00 Plumbing, General Purpose
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Apr-2008 S UFGS 22 66 53 Laboratory Chemical-Waste and Vent Piping N Superseding UFGS 22 66 83.00 40 Chemical-Waste Tanks
Apr-2008 S UFGS 22 66 83.00 40 Chemical-Waste Tanks D Superseded by UFGS 22 66 53 Laboratory Chemical Waste and Vent Piping
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Apr-2008 A UFGS 23 00 00 Air Supply, Distribution, Ventilation, and Exhaust Systems R Compliance with CSI SectionFormat
Apr-2008 S UFGS 23 05 00.00 40 Common Work Results for HVAC R Section References (SRF) update
Apr-2008 S UFGS 23 05 00.00 40 Common Work Results for HVAC R Section References (SRF) update
Apr-2008 S UFGS 23 05 48 Vibration and Seismic Controls for HVAC Piping and Equipment N Renumbered/ Superseding UFGS 23 05 48.00 40 with no title change
Apr-2008 S UFGS 23 05 48.00 40 Vibration and Seismic Controls for HVAC Piping and Equipment D Renumbered/ Superseding UFGS 23 05 48 with no title change
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.