Below is a listing of the Revisions and Changes made to UFGS Sections for each release. You can narrow the list by selecting a UFGS Release date from the drop-down and clicking 'Apply'.
| KEY | PREPARING ACTIVITY (PA) | A Army | N Navy | F Air Force | S NASA [ARCHIVED] |
|---|---|---|---|---|---|
| ACTION | N New | R Revision | C Change | D Deletion |
| Release | PA | UFGS Section | Date | Action | Change # | Nature of Change or Revision |
|---|---|---|---|---|---|---|
| May-2017 | N | UFGS 01 31 23.13 20 Electronic Construction and Facility Support Contract Management System (eCMS) | May-2017 | N | New Section | |
| May-2017 | A | UFGS 01 78 24.00 10 Facility Data Requirements | May-2017 | R | Total review and update. Section title changed from Operations and Maintenance Facility Data Requirements | |
| May-2017 | N | UFGS 02 82 16.00 20 Engineering Control of Asbestos Containing Materials | Aug-2011 | C | 1 | In response to CCR 5044, updated language in paragraph 3.1.3.2 for the Asbestos Warning Label per OSHA 1926.1101(k)(8)(iii). |
| May-2017 | N | UFGS 05 50 13 Miscellaneous Metal Fabrications | May-2017 | R | Addressed the following CCRs: 1669-Include welded headed shear studs; 3556-Access Doors and panels relocated to new UFGS 08 31 00 ACCESS DOORS AND PANELS; Added different types of downspout terminations | |
| May-2017 | S | UFGS 05 51 00 Metal Stairs | Feb-2017 | C | 1 | Incorporated CCR 5531, revised paragraphs 2.4.1, and 2.4.2 |
| May-2017 | N | UFGS 07 11 13 Bituminous Dampproofing | Aug-2011 | C | 1 | In response to CCR 1816, updated para 1.3-Delivery and Storage |
| May-2017 | N | UFGS 07 27 19.01 Self-Adhering Air Barriers | May-2017 | N | New specifications for vapor permeable and vapor retarding self-adhering air barrier systems as part of building enclosure system. Use this section in conjunction with Section 07 27 10.00 10, BUILDING AIR BARRIER SYSTEM and Section 07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS. | |
| May-2017 | N | UFGS 07 27 26 Fluid-Applied Membrane Barriers | May-2017 | N | New specifications for vapor permeable and vapor retarding fluid applied air barrier systems as part of the building enclosure system. Use this section in conjunction with Section 07 27 10.00 10, BUILDING AIR BARRIER SYSTEM and Section 07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS. | |
| May-2017 | N | UFGS 07 27 36 Spray Foam Air Barriers | May-2017 | N | New specifications for open and closed cell spray polyurethane foam (SPF) air barrier systems as part of the building enclosure system. Use this section in conjunction with Section 07 27 10.00 10, BUILDING AIR BARRIER SYSTEM and Section 07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS. | |
| May-2017 | N | UFGS 07 60 00 Flashing and Sheet Metal | May-2017 | R | Addressed CCR 3360 which establishes Energy Star requirements. | |
| May-2017 | N | UFGS 08 11 16 Aluminum Doors and Frames | May-2017 | R | Addressed the following CCRs: 1822-Air Infiltration requirements; 2330-Water penetration and insulation requirements; 2393-Requirements for ATFP and windborne debris regions; and 2392-Update requirements for thermal performance | |
| May-2017 | N | UFGS 08 31 00 Access Doors and Panels | May-2017 | N | New Section | |
| May-2017 | N | UFGS 08 34 16 Corrosion Control Hangar Doors | May-2017 | R | Complete revision as part of the normal refresh cycle and to coordinate with concurrent revisions to UFC 4-211-01 which is becoming a Tri-Service document. | |
| May-2017 | N | UFGS 08 34 16.10 Horizontal Rolling Steel Doors | May-2017 | R | Complete revision as part of the normal refresh cycle and to coordinate with concurrent revisions to UFC 4-211-01 which is becoming a Tri-Service document. | |
| May-2017 | A | UFGS 10 14 53 Traffic Signage | Feb-2015 | C | 1 | In response to CCR 4523, updated references and incorporated minor changes. |
| May-2017 | S | UFGS 22 14 29.00 Sump Pumps | May-2017 | R | Tri-Annual Database Maintenance (TADM) completed | |
| May-2017 | S | UFGS 23 73 13.00 40 Modular Indoor Central-Station Air-Handling Units | May-2017 | R | Tri-Annual Database Maintenance (TADM) completed | |
| May-2017 | S | UFGS 23 73 13.00 40 Modular Indoor Central-Station Air-Handling Units | May-2017 | R | Tri-Annual Database Maintenance (TADM) completed | |
| May-2017 | S | UFGS 23 74 33.00 40 Small HVAC Units, Cooling-Only, Recirculating, Split and Unitary for Window and Floor Mounting | May-2017 | R | Tri-Annual Database Maintenance (TADM) completed | |
| May-2017 | S | UFGS 23 82 19.00 40 Fan Coil Units | May-2017 | R | Tri-Annual Database Maintenance (TADM) completed | |
| May-2017 | S | UFGS 23 82 19.00 40 Fan Coil Units | May-2017 | R | Tri-Annual Database Maintenance (TADM) completed | |
| May-2017 | S | UFGS 23 82 23.00 40 Unit Ventilators | May-2017 | R | Tri-Annual Database Maintenance (TADM) completed | |
| May-2017 | S | UFGS 23 82 23.00 40 Unit Ventilators | May-2017 | R | Tri-Annual Database Maintenance (TADM) completed | |
| May-2017 | S | UFGS 23 82 43.00 40 Electric Duct Heaters | May-2017 | R | Tri-Annual Database Maintenance (TADM) completed | |
| May-2017 | N | UFGS 23 82 46.00 40 Electric Unit Heaters | May-2017 | R | Tri-Annual Database Maintenance (TADM) completed | |
| May-2017 | N | UFGS 25 50 00.00 20 Cybersecurity of Facility-Related Control Systems | Feb-2017 | C | 1 | Clarified contractor requirements throughout. Revised the subparagraphs of 1.2.4 to remove requirements to be performed by the Government and to clarify the Contractor's requirements. CCR 5584: Revised 1.2 and 3.1 to read QUALITY CONTROL and FIELD QUALITY CONTROL, respectively. CCR 5629: Clarified 1.2.1 and 1.2.2 to provide submittal via Registered Mail. |
| May-2017 | N | UFGS 26 12 19 Pad-Mounted, Liquid-Filled, Medium Voltage Transformers | May-2017 | R | Revision included updating the minimum efficiency to meet 10 CFR 431, Subpart K, and meeting additional changes in transformer technology. | |
| May-2017 | N | UFGS 26 12 21 Single-Phase Pad-Mounted Transformers | May-2017 | R | Revision included updating the minimum efficiency to meet 10 CFR 431, Subpart K, and meeting additional changes in transformer technology. | |
| May-2017 | S | UFGS 26 28 21.00 40 Automatic Transfer Switches | May-2017 | R | Tri-Annual Database Maintenance (TADM) completed | |
| May-2017 | S | UFGS 27 05 28.36 40 Cable Trays for Communications Systems | May-2017 | R | Tri-Annual Database Maintenance (TADM) completed | |
| May-2017 | N | UFGS 31 31 16.19 Termite Control Barriers | Feb-2016 | C | 1 | Changes made to include a note for Air Force to use Chemical Termite Control and deleting reference to ASTM C289 in response to CCR 4978. |
| May-2017 | A | UFGS 32 01 13 Bituminous Seal and Fog Coats | Aug-2008 | D | Superseded by UFGS 32 12 36.13 Asphaltic Seal and Fog Coats. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
| May-2017 | A | UFGS 32 01 17.16 Sealing of Cracks in Bituminous Pavements | Aug-2008 | D | Superseded by UFGS 32 01 17.61 Sealing Cracks in Asphalt Paving. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
| May-2017 | A | UFGS 32 01 17.61 Sealing Cracks in Asphalt Paving | May-2017 | N | Superseding UFGS 32 01 17.16 Sealing of Cracks in Bituminous Pavements; Total review and update. | |
| May-2017 | A | UFGS 32 01 18.71 Grooving of Airfield Paving | May-2017 | N | Superseding UFGS 32 01 26.71 Grooving for Airfield Pavements; Total review and update. | |
| May-2017 | A | UFGS 32 01 26.71 Grooving for Airfield Pavements | Aug-2008 | D | Superseded by UFGS 32 01 18.71 Grooving of Airfield Paving. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
| May-2017 | A | UFGS 32 01 29.61 Partial Depth Patching of Rigid Paving | May-2017 | R | Total review and update. | |
| May-2017 | A | UFGS 32 01 29.62 Concrete Pavement Raising | Aug-2008 | C | 1 | In response to CCR 2107, changed section title for compliance to the MasterFormat 2011 update. |
| May-2017 | N | UFGS 32 10 00 [Pervious] Bituminous Concrete Pavement | Aug-2008 | D | Pervious Bituminous Concrete Pavement lacks an acceptable industry standard and the majority of Installations do not have acceptable maintenance practices in place to perform required maintenance. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
| May-2017 | A | UFGS 32 12 10 Bituminous Tack and Prime Coats | Aug-2008 | D | Superseded by UFGS 32 12 13 with same title. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives. |
|
| May-2017 | A | UFGS 32 12 13 Bituminous Tack[ and][ Prime] Coats | May-2017 | N | Superseding UFGS 32 12 10; Total review and update with no title change. | |
| May-2017 | A | UFGS 32 12 36.13 Bituminous Fog Seal | May-2017 | N | Superseding UFGS 32 01 13 Bituminous Seal and Fog Coats; Total review and update. | |
| May-2017 | A | UFGS 32 15 00 Aggregate Surfacing | May-2017 | R | Total review and update; Section title changed from Aggregate Surface Course. | |
| May-2017 | A | UFGS 32 17 23 Pavement Markings | Aug-2016 | C | 2 | In response to CCR 5549, removed "Gradation A" from Type III beads. |
| May-2017 | S | UFGS 32 31 13 Chain Link Fences and Gates | Nov-2016 | C | 1 | Incorporated CCR 4487, revised paragraphs 2.2.15, and 2.2.17 |
| May-2017 | N | UFGS 32 84 24 Irrigation Sprinkler Systems | Aug-2011 | C | 1 | Changes made to address CCRs 5293, 5294, 5305, 5306, and 5307 |
| May-2017 | A | UFGS 33 40 00 Stormwater Utilities | Feb-2010 | C | 5 | Added requirements for field quality control. |
| May-2017 | S | UFGS 33 77 36.00 40 Medium-Voltage Utility Fuses | May-2017 | R | Tri-Annual Database Maintenance (TADM) completed | |
| May-2017 | S | UFGS 33 77 36.00 40 Medium-Voltage Utility Fuses | May-2017 | R | Tri-Annual Database Maintenance (TADM) completed | |
| May-2017 | A | UFGS 34 71 13.16 Vehicle Crash Barriers | Feb-2015 | C | 1 | In response to CCR 4568, updated references and incorporated minor changes. |
| May-2017 | S | UFGS 40 18 00.00 40 Vacuum Systems Process Piping | May-2017 | R | Tri-Annual Database Maintenance (TADM) completed | |
| May-2017 | S | UFGS 40 18 00.00 40 Vacuum Systems Process Piping | May-2017 | R | Tri-Annual Database Maintenance (TADM) completed | |
| May-2017 | S | UFGS 42 22 00.00 40 Process Chillers and Coolers | May-2017 | R | Tri-Annual Database Maintenance (TADM) completed | |
| May-2017 | S | UFGS 42 22 00.00 40 Process Chillers and Coolers | May-2017 | R | Tri-Annual Database Maintenance (TADM) completed | |
| May-2017 | F | UFGS 48 14 00 Solar Photovoltaic Systems | May-2017 | N | New Section. | |
| May-2017 | N | UFGS 48 15 00 Wind Generator System | May-2017 | N | New Section. | |
| May-2017 | A | UFGS 48 16 00 Landfill Gas Systems | May-2017 | N | New Section. |