History: Below is a listing of the Revisions and Changes made to this UFGS.

KEYPREPARING ACTIVITY (PA)A ArmyN NavyF Air ForceS NASA [ARCHIVED]
ACTIONN NewR RevisionC ChangeD Deletion
Release PA Action Change # Nature of Change or Revision
May-2024 N R Section Rename/Retitle to conform with CSI MasterFormat; now UFGS-26 12 19 PAD-MOUNTED, LIQUID-FILLED, MEDIUM VOLTAGE TRANSFORMERS; Superseding UFGS-26 12 19.10 (THREE-PHASE, LIQUID-FILLED PAD-MOUNTED TRANSFORMERS) without Revision
Nov-2023 N C 2 Updated information in Related Materials: Three-Phase Pad-Mounted Transformer Details
Nov-2019 N C 1 Incorporated dispersal of criteria from the retired UFC 3-440-05N TROPICAL ENGINEERING, and the addition of corrosion protection criteria to coordinate with UFC 1-200-01 DoD BUILDING CODE. In response to CCR 7565, as FAR/DFAR changes no longer permit the use of "brand name or equal" in the UFGS, the following language was removed from the paragraph WARNING SIGNS AND LABELS (2.3), "(decals, Panduit No. PPSO710D72 or approved equal)".
May-2019 N R New title (formerly THREE-PHASE PAD-MOUNTED TRANSFORMERS) CCR changes.
Aug-2018 N C 2 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
May-2018 N C 1 Change incorporates minor corrections and coordinates the use of Non-mineral insulating oil.
May-2017 N R Revision included updating the minimum efficiency to meet 10 CFR 431, Subpart K, and meeting additional changes in transformer technology.
Feb-2012 N R Modified subparts 2.2, 2.2.1, 2.2.1.1- 2.2.1.3, 2.2.2, 2.2.4, 3.4, 3.5
Aug-2011 N R Major revision
Nov-2009 N R Major revision
Nov-2008 N R Meta Data (MTA) tag correction