VA Master Specifications (PG-18-1)  Subscribe to VA Master Specifications (PG-18-1)

Comprehensive set of over 372 written architectural and engineering guidelines defining the qualitative requirements for products, materials, and workmanship.

Click the 'Title' or 'Date' heading to sort by ascending or descending order. Narrow the list by selecting a 'Division' option from the dropdown and clicking 'Apply'.

These documents are available in the following format:   Adobe Acrobat (PDF)  |   Microsoft Word (DOC, DOCX)

Title Datesort ascending View
VA 23 23 00 Refrigerant Piping 02-01-2015  PDF |  DOCX
VA 02 41 00 Demolition 02-01-2015  PDF |  DOCX
VA 23 05 51 Noise and Vibration Control for Boiler Plant 02-01-2015  PDF |  DOCX
VA 23 25 00 HVAC Water Treatment 02-01-2015  PDF |  DOCX
VA 04 20 00 Unit Masonry 02-01-2015  PDF |  DOCX
VA 23 08 11 Demonstrations and Tests for Boiler Plant 02-01-2015  PDF |  DOCX
VA 23 09 11 Instrumentation and Control for Boiler Plant 02-01-2015  PDF |  DOCX
VA 23 34 00 HVAC Fans 02-01-2015  PDF |  DOCX
VA 23 10 00 Facility Fuel Systems 02-01-2015  PDF |  DOCX
VA 23 36 00 Air Terminal Units 02-01-2015  PDF |  DOCX
VA 09 05 16 Subsurface Preparation for Floor Finishes 02-01-2015  PDF |  DOCX
VA 23 11 23 Facility Natural-Gas Piping 02-01-2015  PDF |  DOCX
VA 23 37 00 Air Outlets and Inlets 02-01-2015  PDF |  DOCX
VA 23 21 23 Hydronic Pumps 02-01-2015  PDF |  DOCX
VA 23 22 13 Steam and Condensate Heating Piping 02-01-2015  PDF |  DOCX
VA 23 22 23 Steam Condensate Pumps 02-01-2015  PDF |  DOCX
VA 23 65 00 Cooling Towers 02-01-2015  PDF |  DOCX
VA 04 72 00 Cast Stone Masonry 02-01-2015  PDF |  DOCX
VA 23 52 33 Water-Tube Boilers 02-01-2015  PDF |  DOCX
VA 01 32 16.15 Project Schedules (Small Projects - Design/Bid/Build) 02-01-2015  PDF |  DOCX
VA 23 05 41 Noise and Vibration Control for HVAC Piping and Equipment 02-01-2015  PDF |  DOCX
VA 23 52 39 Fire-Tube Boilers 02-01-2015  PDF |  DOCX
VA 23 05 93 Testing, Adjusting and Balancing for HVAC 02-01-2015  PDF |  DOCX
VA 23 21 11 Boiler Plant Piping Systems 02-01-2015  PDF |  DOCX
VA 23 07 11 HVAC and Boiler Plant Insulation 02-01-2015  PDF |  DOCX
VA 23 05 10 Common Work Results for Boiler Plant and Steam Generation 02-01-2015  PDF |  DOCX
VA 23 05 11 Common Work Results for HVAC 02-01-2015  PDF |  DOCX
VA 21 13 16 Dry-Pipe Sprinkler Systems 01-01-2015  PDF |  DOCX
VA 11 73 00 Ceiling Mounted Patient Lift System 09-01-2014  PDF |  DOCX
VA 09 96 59 Resinous Specialty Glazed Coating Systems for Walls, Ceilings, Wallboard and Block CMU (RES-W1, RES-W-2) 07-01-2014  PDF |  DOCX
VA 33 10 00 Water Utilities 12-31-2013  PDF |  DOC
VA 13 05 41 Seismic Restraint Requirements for Non-Structural Components 12-31-2013  PDF |  DOC
VA 01 74 19 Construction Waste Management 08-31-2013  PDF |  DOC
VA 26 05 19 Low-Voltage Electrical Power Conductors and Cables 06-30-2013  PDF |  DOC
VA 33 30 00 Sanitary Sewer Utilities 06-01-2013  PDF |  DOC
VA 33 63 00 Steam Energy Distribution 05-31-2013  PDF |  DOCX
VA 07 13 00 Sheet Waterproofing 03-31-2013  PDF |  DOC
VA 23 31 00 HVAC Ducts and Casings 02-28-2013  PDF |  DOC
VA 11 17 36 Package Transfer Units 01-31-2013  PDF |  DOC
VA 26 05 13 Medium-Voltage Cables 11-30-2012  PDF |  DOCX
VA 26 05 26 Grounding and Bonding for Electrical Systems 11-30-2012  PDF |  DOCX
VA 26 05 41 Underground Electrical Construction 11-30-2012  PDF |  DOCX
VA 26 13 13 Medium-Voltage Circuit Breaker Switchgear 11-30-2012  PDF |  DOCX
VA 26 13 16 Medium-Voltage Fusible Interrupter Switches 11-30-2012  PDF |  DOCX
VA 26 23 00 Low-Voltage Switchgear 11-30-2012  PDF |  DOCX
VA 26 23 13 Generator Paralleling Controls 11-30-2012  PDF |  DOCX
VA 26 25 11 Busways 11-30-2012  PDF |  DOCX
VA 26 29 21 Disconnect Switches 11-30-2012  PDF |  DOCX
VA 26 33 53 Static Uninterruptible Power Supply 11-30-2012  PDF |  DOCX
VA 26 36 23 Automatic Transfer Switches 11-30-2012  PDF |  DOCX
VA 26 41 00 Facility Lightning Protection 11-30-2012  PDF |  DOCX
VA 26 42 00 Cathodic Protection 11-30-2012  PDF |  DOCX
VA 26 43 13 Transient-Voltage Surge Suppression 11-30-2012  PDF |  DOCX
VA 31 20 11 Earthwork (Short Form) 09-30-2012  PDF |  DOC
VA 31 23 19 Dewatering 09-30-2012  PDF |  DOC
VA 31 23 23.33 Flowable Fill 09-30-2012  PDF |  DOC
VA 31 32 23 Pressure Grouting Soil Stabilization 09-30-2012  PDF |  DOC
VA 31 62 00 Driven Piles 09-30-2012  PDF |  DOC
VA 31 63 16 Auger Cast Grout Piles 09-30-2012  PDF |  DOC
VA 31 63 26 Drilled Caissons 09-30-2012  PDF |  DOC
VA 23 21 13 Hydronic Piping 08-31-2012  PDF |  DOC
VA 14 91 33 Laundry and Linen Chutes 05-31-2012  PDF |  DOC
VA 14 91 82 Trash Chutes 05-31-2012  PDF |  DOC
VA 23 40 00 HVAC Air Cleaning Devices 01-31-2012  PDF |  DOC
VA 11 53 71 Solution Warming Cabinets 10-31-2011  PDF |  DOC
VA 11 05 12 General Motor Requirements for Equipment 10-31-2011  PDF |  DOC
VA 11 78 00 Mortuary Equipment 10-31-2011  PDF |  DOC
VA 11 26 00 Unit Kitchens 10-31-2011  PDF |  DOC
VA 11 78 13 Mortuary Refrigerators 10-31-2011  PDF |  DOC
VA 11 27 00 Photographic Processing Equipment 10-31-2011  PDF |  DOC
VA 11 79 13 Hydrotherapy Equipment 10-31-2011  PDF |  DOC
VA 11 40 11 Custom Fabricated Foodservice Equipment 10-31-2011  PDF |  DOC
VA 11 82 19 Packaged Incinerators 10-31-2011  PDF |  DOC
VA 11 40 21 Food Service Equipment - Utility Distribution System 10-31-2011  PDF |  DOC
VA 11 41 00 Food Storage Equipment 10-31-2011  PDF |  DOC
VA 11 44 00 Food Cooking Equipment 10-31-2011  PDF |  DOC
VA 11 48 00 Cleaning and Disposal Equipment 10-31-2011  PDF |  DOC
VA 11 53 23 Laboratory Refrigerators 10-31-2011  PDF |  DOC
VA 11 53 61 Custom Fabricated Laboratory Equipment 10-31-2011  PDF |  DOC
VA 28 31 00 Fire Detection and Alarm 10-01-2011  PDF |  DOC
VA 28 16 00 Intrusion Detection System 09-30-2011  PDF |  DOC
VA 11 71 02 Laboratory Washing and Sterlizing Equipment 09-30-2011  PDF |  DOC
VA 33 46 13 Foundation Drainage 09-30-2011  PDF |  DOC
VA 33 51 00 Natural-Gas Distribution 09-30-2011  PDF |  DOC
VA 28 13 00 Physical Access Control System 09-30-2011  PDF |  DOC
VA 28 13 53 Security Access Detection 08-31-2011  PDF |  DOC
VA 28 23 00 Video Surveillance 08-31-2011  PDF |  DOC
VA 28 26 00 Electronic Personal Protection System (EPPS) 08-31-2011  PDF |  DOC
VA 07 12 00 Built-Up Bituminous Waterproofing 08-31-2011  PDF |  DOC
VA 03 51 13 Cementitious Wood Fiber Decks 08-31-2011  PDF |  DOC
VA 03 51 16 Gypsum Concrete Roof Decks 08-31-2011  PDF |  DOC
VA 28 05 26 Grounding and Bonding for Electronic Safety and Security 08-31-2011  PDF |  DOC
VA 28 05 28.33 Conduits and Backboxes for Electronic Safety and Security 08-31-2011  PDF |  DOC
VA 23 09 23 Direct-Digital Control System for HVAC 08-31-2011  PDF |  DOC
VA 28 13 16 Physical Access Control System and Database Management 08-31-2011  PDF |  DOC
VA 03 37 13 Shotcrete 06-30-2011  PDF |  DOC
VA 03 41 13 Precast Concrete Hollow Core Planks 06-30-2011  PDF |  DOC
VA 03 55 11 Gypsum Concrete Floor Decks 06-30-2011  PDF |  DOC
VA 03 23 00 Stressing Tendons 06-30-2011  PDF |  DOC
VA 23 84 00 Humidity Control Equipment 04-30-2011  PDF |  DOC

Pages