Below is a listing of the Revisions and Changes made to UFGS Sections for each release. You can narrow the list by selecting a UFGS Release date from the drop-down and clicking 'Apply'.

KEYPREPARING ACTIVITY (PA)A ArmyN NavyF Air ForceS NASA [ARCHIVED]
ACTIONN NewR RevisionC ChangeD Deletion
Release PA UFGS Section Action Change # Nature of Change or Revision
Nov-2020 N UFGS 01 14 00 Work Restrictions C 11 Updated Additional Personnel Requirements (1.5.1.2) and subparagraph to clarify work restrictions for secure facilities. Incorporated the following CCRs: CCR 9027, revised General Note in relation to tailoring options included in the section; CCR 9028, corrected tailoring in Part 1; and CCR 9029, corrected subpart hierarchy by moving "Unarmed Escort Services" paragraph into "CONTRACTED SERVICES FOR NBK BANGOR, SILVERDALE, WA. (1.16).
Nov-2020 N UFGS 01 20 00 Price and Payment Procedures N New Unified Section; Superseding UFGS 01 20 00.00 20 and UFGS 01 22 00.00 10 PRICE AND PAYMENT PROCEDURES
Nov-2020 N UFGS 01 20 00.00 20 Price and Payment Procedures D Superseded by new unified section, UFGS 01 20 00 PRICE AND PAYMENT PROCEDURES.
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2020 A UFGS 01 22 00.00 10 Price and Payment Procedures D Superseded by new unified section UFGS 01 20 00 PRICE AND PAYMENT PROCEDURES.
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2020 N UFGS 01 30 00 Administrative Requirements R Revised to include NAVFAC Design-Build Division 01 tailoring option and incorporate CCRs.
Nov-2020 N UFGS 01 35 13 Special Project Procedures R Revised to include NAVFAC Design-Build Division 01 tailoring option and incorporate CCRs.
Nov-2020 N UFGS 01 35 26 Governmental Safety Requirements R Revised to include NAVFAC Design-Build Division 01 tailoring option and incorporate CCRs.
Nov-2020 N UFGS 01 45 35 Special Inspections R Revised to include NAVFAC Design-Build Division 01 tailoring option and incorporate CCRs.
Nov-2020 A UFGS 01 50 00 Temporary Construction Facilities and Controls R Revised to include NAVFAC Design-Build Division 01 tailoring options and CCRs.
Nov-2020 N UFGS 01 58 00 Project Identification C 2 [Update 3/18/21: per CCR# 9845, reference to ARRA has been removed from the sign details in all Related Materials.]
Updated both the Specifier Note under PROJECT IDENTIFICATION SIGN (1.4) and the Related Materials (PDF/ZIP attachments)
Nov-2020 N UFGS 01 78 23 Operation and Maintenance Data C 1 In opening note, incorporated Navy thresholds, from cancelled Navy ECB 2014-01, that require use of UFGS 01 78 24.00 20 FACILITY eOMSI
Nov-2020 N UFGS 01 78 24.00 20 Facility Data Workbook (FDW) C 2 In opening Note, incorporated Navy thresholds, from cancelled Navy ECB 2014-01, that require use of UFGS 01 78 24.00 20, and updated Facility Data Workbook.
Nov-2020 A UFGS 13 49 10 X-Ray Shielding R Complete review and update.
Nov-2020 A UFGS 13 49 21 Radio Frequency (RF) Shielding: Magnetic Resonance Imaging (MRI) N New UFGS.
Nov-2020 A UFGS 23 09 13 Instrumentation and Control Devices for HVAC C 1 Updated ADA sensor height requirement in subpart 3.1.7.1 in response to CCR 7477.
Nov-2020 S UFGS 23 09 33.00 40 Electric and Electronic Control System for HVAC R Tri-Annual Database Maintenance (TADM) completed
Nov-2020 S UFGS 23 09 33.00 40 Electric and Electronic Control System for HVAC R Tri-Annual Database Maintenance (TADM) completed
Nov-2020 N UFGS 23 81 23 Computer Room Air Conditioning Units N New Unified Section; Supersedes UFGS 23 81 23.00 20 COMPUTER ROOM AIR CONDITIONING UNITS
Nov-2020 N UFGS 23 81 23.00 20 Computer Room Air Conditioning Units D Superseded by UFGS 23 81 23 COMPUTER ROOM AIR CONDITIONING UNITS (unified).
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2020 N UFGS 25 08 11.00 20 Risk Management Framework for Facility-Related Control Systems N This guide specification covers the Navy requirements to support the Risk Management Framework (RMF) Authority to Operate (ATO) Process for Facility-Related Control Systems.
Nov-2020 N UFGS 26 55 80 Surgical, Procedure and Exam Lighting Fixtures R Section has been unified. New number and title (was 26 55 80.00 20 SURGICAL LIGHTING FIXTURES). Revised language throughout specification to replace indicative language with imperative language. Reformatted paragraphs and subsequent numbering to reflect removal of out-of-date information and/or addition of up-to-date information per latest industry standards.
Nov-2020 S UFGS 27 21 10.00 40 Fiber Optic Data Transmission System R Tri-Annual Database Maintenance (TADM) completed
Nov-2020 S UFGS 27 21 10.00 40 Fiber Optic Data Transmission System R Tri-Annual Database Maintenance (TADM) completed
Nov-2020 S UFGS 27 21 10.00 40 Fiber Optic Data Transmission System R Tri-Annual Database Maintenance (TADM) completed
Nov-2020 A UFGS 27 52 24 Nurse Call System R Complete review and update.
Nov-2020 A UFGS 31 41 16 Metal Sheet Piling R Complete review and update.
Nov-2020 N UFGS 31 62 13.20 Precast/Prestressed Concrete Piles R Major revision to align with current industry practice.
Nov-2020 N UFGS 31 62 13.24 Concrete Cylinder Piles R Major revision to align with current industry practice.
Nov-2020 N UFGS 31 62 13.26 Pressure-Injected Footings R Major revision to align with current industry practice.
Nov-2020 N UFGS 31 62 16.13 Steel Pipe Piles N New UFGS section to address furnishing, installing and testing of steel pipe piles.
Nov-2020 N UFGS 31 62 16.16 Steel H-Piles R Major revision to align with current industry practice.
Nov-2020 N UFGS 31 62 19 Timber Piles R Major revision to align with current industry practice.
Nov-2020 A UFGS 31 62 21 Piling: Composite, Wood and Cast In-Place Concrete D Superseded by UFGS 31 62 23 PILING: COMPOSITE, WOOD AND CAST IN-PLACE CONCRETE.
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2020 A UFGS 31 62 23 Piling: Composite, Wood And Cast In-Place Concrete N Superseding UFGS 31 62 21 PILING: COMPOSITE, WOOD AND CAST IN-PLACE CONCRETE.
Nov-2020 N UFGS 31 62 50 Densified Aggregate Piers N New UFGS to address the design and construction of densified aggregate piers.
Nov-2020 A UFGS 31 63 16 Augered Cast-In-Place Piles R Complete review and update including section title change from AUGER CAST GROUT PILES to AUGERED CAST-IN-PLACE PILES.
Nov-2020 N UFGS 31 63 26.60 [Grouted] Helical Piles N New UFGS to address [grouted] helical piles.
Nov-2020 A UFGS 31 68 13 Soil and Rock Anchors R Complete review and update.
Nov-2020 A UFGS 32 12 15.13 Asphalt Paving for Airfields R Complete review and update.
Nov-2020 A UFGS 32 12 16 Hot-Mix Asphalt (HMA) for Roads D Superseded by UFGS 32 12 16.16 ROAD-MIX ASPHALT PAVING.
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2020 A UFGS 32 12 16.16 Road-Mix Asphalt Paving N Superseding UFGS 32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS.
Nov-2020 A UFGS 32 12 17.19 Fuel Resistant Asphalt Paving For Airfields - Surface Course N New UFGS.
Nov-2020 A UFGS 32 12 36.26 10 Polymer Concrete Micro-Overlay (PCMO) for Fuel and Abrasion Resistant Wearing Surfaces D Superseded by UFGS 32 12 36.26 POLYMER CONCRETE MICRO-OVERLAY (PCMO) FOR FUEL AND ABRASION RESISTANT WEARING SURFACES without revision.
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2020 A UFGS 32 12 36.26 Polymer Concrete Micro-Overlay (PCMO) for Fuel and Abrasion Resistant Wearing Surfaces N Superseding UFGS 32 12 36.26 10 POLYMER CONCRETE MICRO-OVERLAY (PCMO) FOR FUEL AND ABRASION RESISTANT WEARING SURFACES without revision. Section number change.
Nov-2020 A UFGS 32 13 13.17 Roller Compacted Concrete Paving N Superseding UFGS 32 13 16.16 ROLLER COMPACTED CONCRETE (RCC) PAVEMENT.
Nov-2020 A UFGS 32 13 16.16 Roller Compacted Concrete (RCC) Pavement D Superseded by UFGS 32 13 13.17 ROLLER COMPACTED CONCRETE PAVING.
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2020 N UFGS 33 01 50.55 Cleaning of Petroleum Storage Tanks C 1 (UFGS-33 01 50.60) In response to CCR 7720, paragraph "TANK CLEANING" (3.7) has been updated.
Nov-2020 A UFGS 33 16 15 Water Storage Steel Tanks R Complete review and update.
Nov-2020 N UFGS 33 52 10 Fuel Systems Piping (Service Station) C 1 Updated Reference Article and paragraphs "Contractor Qualifications" (1.4.1), "Flange Gaskets, Non-Electrically Isolating" (2.2.3), "Insulating Flange Kits, (Electrically Isolating)" (2.3.2), and "Swing Type Check Valves" (2.6.3) to clarify and incorporate CCRs.
Nov-2020 N UFGS 33 52 40 Fuel Systems Piping (Non-Hydrant) C 2 Updated Reference Article, Submittals, and paragraphs "Contractor Qualifications" (1.5.1), "Insulating Flange Kits, (Electrically Isolating)" (2.2.8), "Flange Gaskets, Non-Electrically Isolating" (2.2.10), and "Flange Gaskets, Metallic" (2.2.11) to clarify and incorporate CCRs.
Nov-2020 A UFGS 33 56 10 Factory-Fabricated Fuel Storage Tanks C 1 Updated subpart 2.4.1 in response to CCR 7770. Updated note in subpart 2.5. Added subparts 2.6.1.1 and 2.6.2.1. Updated subpart 2.14.1 in response to CCR 9187.
Nov-2020 A UFGS 33 56 19 Fuel Impermeable Liner System C 1 Updated notes in subparts 2.1.3, 2.2.7, 3.5.1 and 3.7 in response to CCR 4564.
Nov-2020 N UFGS 33 56 21.17 Single Wall Aboveground Fixed Roof Steel POL Storage Tank C 1 Updated Reference Article and paragraphs "Weld Inspector Certification" (1.9.4), "Qualifications of API Std 653 Inspector" (1.9.7), "Mechanical Tape Level Gauge" (2.13.5) to clarify and incorporate CCRs.
Nov-2020 N UFGS 33 57 55 Fuel Systems Components (Non-Hydrant) C 1 Updated paragraph "Filters" (2.29.1.3).
Nov-2020 A UFGS 35 45 04.00 10 Submersible Pump, Centrifugal Type N New UFGS.
Nov-2020 N UFGS 41 22 13.55 Bridge Cranes, Aircraft Maintenance Hangar N New crane section developed specifically for aircraft hangars.
Nov-2020 A UFGS 41 24 26 Hydraulic Power Systems C 1 Deleted all references to SAE J1165 and replaced with ISO 4406 in response to CCR 1788.