Below is a listing of the Revisions and Changes made to UFGS Sections for each release. You can narrow the list by selecting a UFGS Release date from the drop-down and clicking 'Apply'.

KEYPREPARING ACTIVITY (PA)A ArmyN NavyF Air ForceS NASA [ARCHIVED]
ACTIONN NewR RevisionC ChangeD Deletion
Release PA UFGS Section Action Change # Nature of Change or Revision
Feb-2024 N UFGS Section Template (Template CCRs Only) R Complete review; removed references to NASA in the banner, and the Submittals Article standard notes and paragraph.
Feb-2024 N UFGS 00 01 15 List of Drawings R Complete review and update.
Feb-2024 N UFGS 01 11 00 Summary of Work R Complete review and update to include removal of FAR references, NASA-tailored requirements, and included requirements on Navy drawings.
Feb-2024 N UFGS 01 31 23.13 20 Electronic Construction and Facility Support Contract Management System (eCMS) C 1 Updated language in Loss of Privilege (1.2.3) and RFIs Module (1.6.3) paragraphs
Feb-2024 A UFGS 01 42 15 Metric Measurements R Complete review and update.
Feb-2024 A UFGS 11 13 19.13 Loading Dock Levelers R Complete review and update.
Feb-2024 N UFGS 21 12 00 Standpipe Systems D Archived with no replacement.
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2024 N UFGS 21 13 21.00 20 Foam Fire Extinguishing for Fuel Tank Protection D Archived with no replacement.
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2024 N UFGS 21 13 22.00 20 Foam Fire Extinguishing for Haz/Flam Material Facility D Archived with no replacement.
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2024 N UFGS 21 21 00 Fire Extinguishing Sprinkler Systems (Residential) D Archived with no replacement.
Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2024 A UFGS 22 13 36 Pneumatic Sewage Ejectors D Archived with no replacement. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2024 N UFGS 23 05 15 Common Piping for HVAC C 1 Added NAVFAC only specifier note under PIPE AND FITTINGS paragraph (2.2)
Feb-2024 A UFGS 23 33 56 Self-Acting Blast Valves D Archived with no replacement. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2024 N UFGS 23 64 26 Chilled, Chilled-Hot, and Condenser Water Piping Systems C 7 In response to CCRs 9060, 13651, and 14220, ‘Pump Discharge Valve’ (submittal and paragraph) has been removed from the section as it conflicted with UFC 3-410-01 Heating, Ventilating, and Air Conditioning Systems’.
Feb-2024 N UFGS 26 23 00 Low Voltage Switchgear R Complete review and update to incorporate CCRs and update requirements for mitigating arc flash hazards.
Feb-2024 A UFGS 26 37 13 Microgrid Control System N New UFGS Section
Feb-2024 N UFGS 31 62 13.13 Cast-In-Place Concrete Piles C 3 In response to CCR 12354, replaced "shall" throughout with alternate language and active voice.
Feb-2024 N UFGS 31 62 13.20 Precast/Prestressed Concrete Piles C 2 In response to the following CCRs: 9547, brackets have been added around "Chloride Ion Concentration" paragraph (2.5.7) and "Chloride Ion Penetration" paragraph (2.5.8); 13020, updated referenced paragraph titles; and 13503, added new "Patching" subparagraph (3.2.10) under PILE DRIVING Article (3.2)
Feb-2024 N UFGS 31 62 13.24 Concrete Cylinder Piles C 2 In response to CCR 13713, replaced "shall" and limited "must" throughout with alternate language and active voice.
Feb-2024 N UFGS 31 62 13.26 Pressure-Injected Footings C 2 In response to CCR 13524, replaced "shall" and limited "must" throughout with alternate language and active voice.
Feb-2024 N UFGS 31 62 16.13 Steel Pipe Piles C 2 In response to the following CCRs:13021, updated referenced paragraph titles and 13714, replaced "shall" and limited "must" throughout with alternate language and active voice.
Feb-2024 N UFGS 31 62 16.16 Steel H-Piles C 2 In response to CCR 13022, updated referenced paragraph titles.
Feb-2024 N UFGS 31 62 19 Timber Piles C 2 In response to the following CCRs: 12473 and 13023, updated referenced paragraph titles.
Feb-2024 N UFGS 31 62 50 Densified Aggregate Piers C 2 In response to CCR 13026, updated referenced paragraph titles.
Feb-2024 N UFGS 31 63 26.60 [Grouted] Helical Piles C 2 In response to the following CCRs:13028, updated referenced paragraph titles; and 13715, replaced "shall" and limited "must" throughout with alternate language and active voice.
Feb-2024 N UFGS 33 01 30.16 TV Inspection of Sewer Lines C 1 In response to CCR 11690, section was updated to include side wall scanning (panoramic) cameras.
Feb-2024 A UFGS 33 05 07.13 Utility Directional Drilling N New UFGS section superseding UFGS-33 05 23.13 UTILITY HORIZONTAL DIRECTIONAL DRILLING
Feb-2024 F UFGS 33 05 23.13 Utility Horizontal Directional Drilling D Superseded by UFGS-33 05 07.13 UTILITY DIRECTIONAL DRILLINGNote: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Feb-2024 N UFGS 44 41 00 Water Pollution Containment And Cleanup Equipment C 1 In response to CCR 13725, updated to reduce the use of shall and change passive voice to active voice.
Feb-2024 F UFGS 46 07 53.19 Composting Toilet D Archived with no replacement.Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.