VA Master Specifications (PG-18-1)  Subscribe to VA Master Specifications (PG-18-1)

More than 400 Master Construction Specifications in CSI MasterFormat 2004 (MF04) are maintained for VA construction projects.

Click the 'Title' or 'Date' heading to sort by ascending or descending order. Narrow the list by selecting a 'Division' option from the dropdown and clicking 'Apply'.

These documents are available in the following format:   Adobe Acrobat (PDF)  |   Microsoft Word (DOC, DOCX)

Title Datesort ascending View
VA 26 42 00 Cathodic Protection 11-01-2022  PDF |  DOCX
VA 26 22 00 Low-Voltage Transformers 11-01-2022  PDF |  DOCX
VA 26 43 13 Transient-Voltage Surge Suppression 11-01-2022  PDF |  DOCX
VA 26 05 11 Requirements for Electrical Installations 11-01-2022  PDF |  DOCX
VA 26 23 00 Low-Voltage Switchgear 11-01-2022  PDF |  DOCX
VA 26 55 71 Medical and Surgical Lighting Fixtures 11-01-2022  PDF |  DOCX
VA 26 05 13 Medium-Voltage Cables 11-01-2022  PDF |  DOCX
VA 26 24 13 Distribution Switchboards 11-01-2022  PDF |  DOCX
VA 26 56 00 Exterior Lighting 11-01-2022  PDF |  DOCX
VA 26 05 19 Low-Voltage Electrical Power Conductors and Cables 11-01-2022  PDF |  DOCX
VA 26 23 13 Generator Paralleling Controls 11-01-2022  PDF |  DOCX
VA 26 05 26 Grounding and Bonding for Electrical Systems 11-01-2022  PDF |  DOCX
VA 26 24 16 Panelboards 11-01-2022  PDF |  DOCX
VA 09 65 16 Resilient Sheet Flooring 06-01-2022  PDF |  DOCX
VA 01 32 16.16 Network Analysis Schedules (Design-Build Only) 05-01-2022  PDF |  DOCX
VA 01 32 16.13 Network Analysis Schedules - Major Construction Project - Design-Bid-Build 05-01-2022  PDF |  DOCX
VA 07 92 00 Joints Sealants 04-01-2022  PDF |  DOCX
VA 01 74 19 Construction Waste Management 04-01-2022  PDF |  DOCX
VA 08 31 13 Access Doors and Frames 04-01-2022  PDF |  DOCX
VA 01 91 00 General Commissioning Requirements 04-01-2022  PDF |  DOCX
VA 23 05 51 Noise and Vibration Control for Boiler Plant 03-01-2022  PDF |  DOCX
VA 23 50 11 Boiler Plant Mechanical Equipment 03-01-2022  PDF |  DOCX
VA 07 52 16.12 Hot-Mopped Styrene-Butadiene-Styrene Modified Bituminous Membrane Roofing 12-01-2021  PDF |  DOCX
VA 07 57 13 Sprayed Polyurethane Foam Roofing 12-01-2021  PDF |  DOCX
VA 09 67 23.20 Resinous (Epoxy Base) With Vinyl Chip Broadcast (RES-2) 12-01-2021  PDF |  DOCX
VA 07 51 00 Built-Up Bituminous Roofing 12-01-2021  PDF |  DOCX
VA 07 51 13.11 Hot-Applied Built-Up Asphalt Roofing 12-01-2021  PDF |  DOCX
VA 07 51 13.13 Cold-Applied Built-Up Asphalt Roofing 12-01-2021  PDF |  DOCX
VA 07 52 16.11 Cold Adhesive Styrene-Butadiene-Styrene Modified Bituminous Membrane Roofing 12-01-2021  PDF |  DOCX
VA 23 05 93.01 DVA/USACE Projects Testing, Adjusting, And Balancing For HVAC 11-01-2021  PDF |  DOCX
VA 01 00 00 General Requirements 11-01-2021  PDF |  DOCX
VA 00 11 21 Request for Proposal to Design Build 09-01-2021  PDF |  DOCX
VA 01 45 35 Special Inspections 06-01-2021  PDF |  DOCX
VA 22 11 00 Facility Water Distribution 05-01-2021  PDF |  DOCX
VA 01 45 00 Quality Control 02-01-2021  PDF |  DOCX
VA 09 66 16 Terrazzo Floor Tile 01-01-2021  PDF |  DOCX
VA 07 27 26 Fluid Applied Membrane Air Barriers, Vapor Permeable 01-01-2021  PDF |  DOCX
VA 07 84 00 Firestopping 01-01-2021  PDF |  DOCX
VA 10 22 13 Wire Mesh Partitions 01-01-2021  PDF |  DOCX
VA 03 45 00 Precast Architectural Concrete 01-01-2021  PDF |  DOCX
VA 11 53 13 Laboratory Fume Hoods 01-01-2021  PDF |  DOCX
VA 08 42 33 Revolving Door Entrances 01-01-2021  PDF |  DOCX
VA 12 35 70.21 Medication Cabinet 01-01-2021  PDF |  DOCX
VA 09 24 00 Portland Cement Plastering 01-01-2021  PDF |  DOCX
VA 07 24 00 Exterior Insulation and Finish Systems 01-01-2021  PDF |  DOCX
VA 07 95 13 Expansion Joint Cover Assemblies 01-01-2021  PDF |  DOCX
VA 10 22 19 Demountable Partitions 01-01-2021  PDF |  DOCX
VA 03 51 13 Cementitious Wood Fiber Decks 01-01-2021  PDF |  DOCX
VA 11 53 23 Laboratory Refrigerators 01-01-2021  PDF |  DOCX
VA 08 51 13.11 Side-Hinged Aluminum Windows 01-01-2021  PDF |  DOCX
VA 12 56 70.11 Suspended Table 01-01-2021  PDF |  DOCX
VA 09 26 00 Veneer Plastering 01-01-2021  PDF |  DOCX
VA 07 27 27 Fluid Applied Membrane Air Barriers, Vapor Retarding 01-01-2021  PDF |  DOCX
VA 05 51 00 Metal Stairs 01-01-2021  PDF |  DOCX
VA 10 22 26.13 Accordion Folding Partitions 01-01-2021  PDF |  DOCX
VA 03 51 16 Gypsum Concrete Roof Decks 01-01-2021  PDF |  DOCX
VA 11 53 53 Biological Safety Cabinets and Laminar Airflow Work Stations 01-01-2021  PDF |  DOCX
VA 08 51 23 Steel Windows 01-01-2021  PDF |  DOCX
VA 13 05 41 Seismic Restraint Requirements for Non-Structural Components 01-01-2021  PDF |  DOCX
VA 09 30 13 Ceramic/Porcelain Tiling 01-01-2021  PDF |  DOCX
VA 09 54 23 Linear Metal Ceilings 01-01-2021  PDF |  DOCX
VA 07 31 13 Asphalt Shingles 01-01-2021  PDF |  DOCX
VA 06 16 63 Cementitious Sheathing 01-01-2021  PDF |  DOCX
VA 10 26 00 Wall and Door Protection 01-01-2021  PDF |  DOCX
VA 03 52 00 Lightweight Concrete Roof Insulation 01-01-2021  PDF |  DOCX
VA 11 53 61 Custom Fabricated Laboratory Equipment 01-01-2021  PDF |  DOCX
VA 08 51 69.11 Aluminum Storm Windows 01-01-2021  PDF |  DOCX
VA 13 17 23 Therapeutic Pools 01-01-2021  PDF |  DOCX
VA 09 63 13 Brick Flooring 01-01-2021  PDF |  DOCX
VA 07 31 26 Slate Shingles 01-01-2021  PDF |  DOCX
VA 09 72 31 Polypropylene Fabric Wallcovering 01-01-2021  PDF |  DOCX
VA 06 20 00 Finish Carpentry 01-01-2021  PDF |  DOCX
VA 10 28 00 Toilet, Bath and Laundry Accessories 01-01-2021  PDF |  DOCX
VA 03 55 11 Gypsum Concrete Floor Decks 01-01-2021  PDF |  DOCX
VA 11 53 71 Solution Warming Cabinets 01-01-2021  PDF |  DOCX
VA 08 56 19 Pass Windows 01-01-2021  PDF |  DOCX
VA 13 17 23.11 Therapeutic Pool Accessories 01-01-2021  PDF |  DOCX
VA 09 63 40 Stone Flooring 01-01-2021  PDF |  DOCX
VA 07 01 50.19 Preparation for Re-Roofing 01-01-2021  PDF |  DOCX
VA 07 31 29.13 Wood Shingles 01-01-2021  PDF |  DOCX
VA 09 84 33 Sound-Absorbing Wall Units 01-01-2021  PDF |  DOCX
VA 08 11 13 Hollow Metal Doors and Frames 01-01-2021  PDF |  DOCX
VA 10 75 00 Flagpoles 01-01-2021  PDF |  DOCX
VA 04 01 00 Maintenance of Masonry 01-01-2021  PDF |  DOCX
VA 11 71 01 Medical Washing and Sterilizing Equipment 01-01-2021  PDF |  DOCX
VA 08 56 53 Blast Resistant Windows 01-01-2021  PDF |  DOCX
VA 13 19 13 Kennel Enclosures and Gates 01-01-2021  PDF |  DOCX
VA 13 21 29 Constant Temperature Rooms 01-01-2021  PDF |  DOCX
VA 09 65 13 Resilient Base and Accessories 01-01-2021  PDF |  DOCX
VA 07 08 00 Facility Exterior Closure Commissioning 01-01-2021  PDF |  DOCX
VA 07 32 13 Clay Roof Tiles 01-01-2021  PDF |  DOCX
VA 09 91 00 Painting 01-01-2021  PDF |  DOCX
VA 08 11 73 Sliding Metal Fire Doors 01-01-2021  PDF |  DOCX
VA 11 05 12 General Motor Requirements for Equipment 01-01-2021  PDF |  DOCX
VA 04 05 16 Masonry Grouting 01-01-2021  PDF |  DOCX
VA 11 71 02 Laboratory Washing and Sterlizing Equipment 01-01-2021  PDF |  DOCX
VA 08 56 59 Service and Teller Window Units 01-01-2021  PDF |  DOCX
VA 01 81 13.21 Sustainability Certification Requirements - Green Globes 01-01-2021  PDF |  DOCX
VA 13 34 19 Metal Building Systems 01-01-2021  PDF |  DOCX
VA 09 67 23.40 Resinous Poured In Place Resilient Flooring (RES-4) 01-01-2021  PDF |  DOCX

Pages