This page contains document links to Construction Criteria Base

NAVFAC Design-Build Model RFP Design Guidance

NAVFAC logo

Decision Guidance for use of Small Project Design-Build Process (SPDB)

These documents are available in the following format:  Adobe PDF icon Adobe Acrobat (PDF)

Title Date Downloads
Decision Guidance for use of Small Project Design-Build Process (SPDB)06-2011PDF 61 KB
ECB 2004-04 Capital Improvements Categories of Work Classification -- Type: Policy05-2006PDF 46 KB

Unified Facilities Criteria (UFC)

Unified Facilities Criteria (UFC) provide planning, design, construction, sustainment, restoration, and modernization criteria, and apply to the Military Departments, the Defense Agencies, and the DoD Field Activities in accordance with USD(AT&L) Memorandum dated 29 May 2002. UFC are distributed only in electronic media and are effective upon issuance.

The United States Army Corps of Engineers (HQUSACE), Naval Facilities Engineering Command (NAVFAC), and Air Force Civil Engineer Center (AFCEC) are responsible for administration of the UFC system. Points of contact and procedures for the development and maintenance UFC documents are prescribed in the latest edition of MIL-STD-3007.

The purpose of the UFC temporarily residing on this site is to outline the technical requirements for the more typical aspects of Architect/Engineer (A/E) contracts for the Naval Facilities Engineering Command. The information provided in these guides shall be utilized by A/E in the development of the plans, specifications, calculations, and Design-Build Request for Proposals (RFP) which shall serve as the minimum requirements. Project conditions may dictate the need for design that exceeds these minimum requirements.

This guidance applies to all Navy Engineering Field Divisions and Activities and their contractors which are preparing construction contract documents and specifications for all projects on military installations under the Naval Facilities Engineering Command. UFC are applicable to the traditional architectural services customary for Design-Bid-Build construction contracts and for Design-Build construction contracts.

These documents are available in the following format:  Adobe PDF icon Adobe Acrobat (PDF)

Title Date Downloads
UFC 3-540-01 Engine-Driven Generator Systems for Backup Power Applications (DRAFT)11-2013PDF 536 KB
UFC 3-600-10N Fire Protection Engineering (DRAFT)08-2007PDF 209 KB
UFC 3-800-10N Environmental Engineering for Facility Construction (DRAFT)07-2006PDF 218 KB
UFC 4-171-06N Navy Operational Support Center (DRAFT)03-2009PDF 604 KB
UFC 4-215-01 Design: Armories and Arms Rooms (DRAFT)07-23-2009PDF 336 KB
UFC 4-420-01 Design: Ammunition and Explosive Storage Magazines (DRAFT)12-2004PDF 282 KB

For more Unified Facilities Criteria, see the Construction Criteria Base.