Status
Active
Publish Date
Pages
129
Final Incorporation
This guidance and any new methods will be incorporated into the next appropriate guidance document update. The next update is anticipated to be an engineer circular with a projected publication date of fiscal year 2028.
Category
Guidance
Summary

This Engineering and Construction Bulletin supports the preparedness and resilience of U.S. Army Corps of Engineers Civil Works projects (planned and existing), programs, missions, and operations by incorporating the potential for changing hydrometeorological conditions into hydrologic analyses. The ECB provides a framework to assess exposure to dynamic weather-related threats and hazards tied to hydrologic processes. This guidance identifies actionable measures to reduce vulnerabilities and increase resilience. The steps in this document are meant to supplement, not replace, existing regulations and guidance related to hydrologic analyses for Civil Works studies.