Click the 'Date' heading to sort by ascending or descending order.

These documents are available in the following format:  Adobe Acrobat (PDF)

 Indicates the ECB has an attachment (in various formats). Click the title to view the attachment under 'Related Materials'.

Title Final Incorporation Date View
USACE ECB 2026-1 Incorporating Resilience to Nonstationary Hydrometeorological Conditions in USACE Civil Works Studies, Designs, and Projects   This guidance and any new methods will be incorporated into the next appropriate guidance document update. The next update is anticipated to be an engineer circular with a projected publication date of fiscal year 2028. PDF Download ecb_2026_1.pdf
USACE ECB 2025-9 Oversight and Execution of Geophysical Investigations   The requirements included in this ECB will be included in a forthcoming update to EM 1110-1-1802. PDF Download ecb_2025_9.pdf
USACE ECB 2025-8 Executive Order Effects on Existing Sustainability Policies   No additional policy updates are necessary because of these new requirements. Upon expiration of this ECB, UFC 1-200-02 will reflect current guidance. PDF Download ecb_2025_8.pdf
USACE ECB 2025-7 District Engineering Control Systems Point of Contact   This guidance does not affect higher level documents and does not require updating existing requirements. PDF Download ecb_2025_7.pdf
USACE ECB 2025-6 2025 USACE Engineering and Construction Awards - Awardees   This guidance does not affect higher level documents and does not require updating existing requirements. PDF Download ecb_2025_6.pdf
USACE ECB 2025-5 (Revision 1) Mechanical and Electrical Reliability Models for Major Rehabilitation Evaluation Reports   This guidance and any new methods will be incorporated into the next appropriate policy document. PDF Download ecb_2025_5_rev_1.pdf
USACE ECB 2025-4 Inclusion and Retention of GS-0807 Landscape Architects   This guidance does not affect higher level documents and does not require updating existing requirements. PDF Download ecb_2025_4.pdf
USACE ECB 2025-3 Implementation of Quality Risk Indicators   Upon expiration, the EQRI policy and guidance in this ECB will be permanently incorporated into ER 1110-2-217 & ER 1110-3-12. CQRI policy and guidance will be permanently incorporated into ER 1180-1-6 and UFGS 01 45 00. PDF Download ecb_2025_3.pdf
USACE ECB 2025-2 Engineering Oversight of Blasting Operations for Rock Excavation or Rock Production   Upon expiration, the policy and guidance in this ECB will be permanently incorporated into a new ER. PDF Download ecb_2025_2.pdf
USACE ECB 2025-1 Update of UFC 1-200-01 DoD Building Code to include 2024 International Building Code   Upon expiration, the policy and guidance in this ECB will be permanently incorporated into UFC 1-200-01. PDF Download ecb_2025_1.pdf
USACE ECB 2024-8 Design of Fiber Reinforced Polymer Hydraulic Composite Structures  

Upon expiration, the policy and guidance in this ECB will be permanently incorporated into ER 1110-2-8157 New Revision (Target Publication Date: TBD)

PDF Download ecb_2024_8.pdf
USACE ECB 2024-7: Engineering, Construction and Maintenance for Fire Protection and Life Safety of Civil Works Buildings, Structures, and Systems  

Upon expiration, the policy and guidance in this ECB will be permanently incorporated into ER 1110-2-1150 New Revision (Target Publication Date: TBD)

PDF Download ecb_2024_7.pdf
USACE ECB 2024-6 Required use of United Facilities Criteria on USACE Civil Works Projects for Electrical Criteria  

Upon expiration, the policy and guidance in this ECB will be permanently incorporated into ER 1110-2-1150 New Revision (Target Publication Date: TBD)

PDF Download ecb_2024_6.pdf
USACE ECB 2024-5 Changes to Refrigerants   Upon expiration, the policy and guidance in this ECB will be permanently incorporated into UFC 3-410-01 and UFC 3-401-01. PDF Download ecb_2024_5.pdf
USACE ECB 2024-3 Technical Lead for Engineering and Construction Deliverables  

Upon expiration, the policy and guidance in this ECB will be permanently incorporated into ER 1110-2-1150 New Revision (Target Publication Date: TBD)

PDF Download ecb_2024_3.pdf
USACE ECB 2024-11 Construction Quality Management (CQM) for Contractors (CQM-C) Course   This guidance does not affect higher level documents and does not require updating existing requirements. PDF Download ecb_2024_11.pdf
USACE ECB 2024-10 Seismic Parameters Outside United States and Territories  

Upon expiration, the policy and guidance in this ECB will be permanently incorporated into UFC 3-301-01

PDF Download ecb_2024_10.pdf
USACE ECB 2024-02 Energy Optimization & Life Cycle Cost Analysis Requirement Update  

Upon expiration, the policy and guidance in this ECB will be permanently incorporated into ER 1110-1-8173 New Revision (Target Publication Date: TBD)

PDF Download ecb_2024_02.pdf
USACE ECB 2024-01 SpecsIntact Version 5.4 and Ownership Transition   This guidance does not affect higher level documents and does not require updating existing requirements. PDF Download ecb_2024_01.pdf
USACE ECB 2023-9 (Revision 1) Civil Works Design Milestone Checklists   The requirements included in this ECB will be included in a forthcoming update to ER 1110-2-1150. PDF Download ecb_2023_9_rev_1.pdf
USACE ECB 2023-4 Engaging Centers of Expertise in Project Delivery Teams and New Website   This guidance does not affect higher level documents and does not require updating existing requirements. PDF Download ecb_2023_4.pdf
USACE ECB 2023-3 Use of National Geodetic Survey NCAT and VDatum instead of CORPSCON   Upon expiration, the policy and guidance in this ECB will be permanently incorporated into ER 1110-2-8160 and EM 1110-2-6056. PDF Download ecb_2023_3.pdf
USACE ECB 2023-2 Update to the Army Sustainability Implementation Guide   This guidance does not affect higher level documents and does not require updating existing requirements. PDF Download ecb_2023_2.pdf
USACE ECB 2023-14 (Revision 1) Mandatory Consideration of Mass Timber in Army Military Construction (MILCON) and Civil Works Vertical Construction Projects  

Upon expiration, the policy and guidance in this ECB will be permanently incorporated into UFC 1-200-02.

PDF Download ecb_2023_14_rev_1.pdf
USACE ECB 2023-13 Construction Contract Duration and Beneficial Occupancy Date   Upon expiration, the policy and guidance in this ECB will be permanently incorporated into a Construction Management Engineering Regulation. PDF Download ecb_2023_13.pdf
USACE ECB 2023-12 Methods for Storage/Yield Analysis   This guidance and any new methods will be incorporated into the next appropriate policy document. PDF Download ecb_2023_12.pdf
USACE ECB 2023-11 USACE Mega Projects – Overall Project Delivery Guidance   The requirements included in this ECB will be included in a forthcoming update to ER 415-1-3 Design and Construction Evaluations PDF Download ecb_2023_11.pdf
USACE ECB 2023-10 Clarification of Policies and Guidance Associated with the Welding of Hydraulic Steel Structures   New requirements will be included in updates to EM 1110-2-2107, ER 1110-2-8157, and EM 1110-2-6054 to reinforce these requirements upon expiration of this ECB. PDF Download ecb_2023_10.pdf
USACE ECB 2023-1 Meet the Requirements of ASHRAE 90.1-2019 to Optimize Energy Performance   Upon expiration, the policy and guidance in this ECB will be permanently incorporated into ER 1110-1-8173 PDF Download ecb_2023_1.pdf
USACE ECB 2023-08 (Revision 2) Revised Electrification Policy   Upon expiration, the policy and guidance in this ECB will be permanently incorporated into UFC 1-200-02 New Revision (Target Publication Date: TBD) PDF Download ecb_2023_08_rev_2.pdf
USACE ECB 2023-07 Update to P2 Sustainability Reporting Requirements   N/A PDF Download ecb_2023_07.pdf
USACE ECB 2023-05 (Revision 1) Update to Professional Registrations, Licensure, and Certifications Reporting   Upon expiration, the policy and guidance in this ECB will be permanently incorporated into ER 1110-1-8152 PDF Download ecb_2023_5_rev_1.pdf
USACE ECB 2022-7 (Revision 1) Interim Approach for Risk-Informed Designs for Dam and Levee Projects   Upon expiration, the policy and guidance in this ECB will be permanently incorporated into EM 1110-2-1913 and ER 1110-2-1156. PDF Download ecb_2022_7_rev_1.pdf
USACE ECB 2022-4 Elevator Design Compliance   Upon expiration, the policy and guidance in this ECB will be permanently incorporated into UFC 3-490-06. PDF Download ecb_2022_4.pdf
USACE ECB 2022-2 (Revision 1) Cybersecurity Requirements for Design and Construction of Control Systems and Integrated Low Voltage Systems for Permanent and Non-permanent Construction   Upon expiration, the policy and guidance in this ECB will be permanently incorporated into ER 1110-2-1150 (Target Publication Date: TBD) PDF Download ecb_2022_2_rev_1.pdf
USACE ECB 2021-5 (Revision 3) Interpretation of UFC 1-200-01, Delegation of Building Official/Authority Having Jurisdiction (BO/AHJ) Responsibilities, and Waiver/Exemption/Equivalency Approvals   Upon expiration, the policy and guidance in this ECB will be permanently incorporated into MIL STD 3007. PDF Download ecb_2021_5_rev_3.pdf
USACE ECB 2021-10 (Revision 1) Submittal of MILCON Construction Award Data via the Historical Analysis Generator (HII)   N/A PDF Download ecb_2021_10_rev_1.pdf
USACE ECB 2020-6 (Revision 2) Implementation of Resilience Principles in the Engineering & Construction Community of Practice   This guidance does not affect higher level documents and does not require updating existing requirements. PDF Download ecb_2020_6_rev_2.pdf
USACE ECB 2020-12 (Revision 1) Corps of Engineers Reviewer Certification and Access Program (CERCAP)   The requirements included in this ECB will be included in a forthcoming update to ER 1110-2-1150. PDF Download ecb_2020_12_rev_1.pdf
USACE ECB 2018-7 (Revision 3) Advanced Modeling Requirements on USACE Projects   N/A PDF Download ecb_2018_7_rev_3.pdf
USACE ECB 2018-6 (Revision 2) Operations & Maintenance (O&M) Facility Data Requirements   Upon expiration, the policy and guidance in this ECB will be permanently incorporated into UFS 1-300-02. PDF Download ecb_2018_6_rev_2.pdf
USACE ECB 2018-4 (Revision 3) Inclusion of GS-0807, Landscape Architect, on Announcements for Interdisciplinary and Multi-discipline Positions and Developmental Assignments   This guidance does not affect higher level documents and does not require updating existing requirements. PDF Download ecb_2018_4_rev_3.pdf
USACE ECB 2018-17 (Revision 4) New Requirements for Visual Notification for Mass Notification Systems   Upon expiration, the policy and guidance in this ECB will be permanently incorporated into UFC 3-600-01. PDF Download ecb_2018_17_rev_4.pdf
USACE ECB 2018-16 (Revision 1) Standardization and Sustainability Technical Reports for Locks and Dams   This guidance does not affect higher level documents and does not require updating existing requirements. PDF Download ecb_2018_16_rev_1.pdf
USACE ECB 2017-22 (Revision 3) Electronic Red-lines, As-builts, and Record Drawings  

Upon expiration, the policy and guidance in this ECB will be permanently incorporated into a revision of UFGS 01 78 00.

PDF Download ecb_2017_22_rev_3.pdf
USACE ECB 2017-16 (Revision 2) Bentley ProjectWise as the Corporate Tool for Engineering Data Management in USACE   N/A PDF Download ecb_2017_16_rev_2.pdf