History: Below is a listing of the Revisions and Changes made to this UFGS.
KEY | PREPARING ACTIVITY (PA) | A Army | N Navy | F Air Force | S NASA [ARCHIVED] |
---|---|---|---|---|---|
ACTION | N New | R Revision | C Change | D Deletion |
Release | PA | Date | Action | Change # | Nature of Change or Revision |
---|---|---|---|---|---|
Aug-2024 | A | Aug-2024 | R | Complete review and update. | |
May-2020 | A | Feb-2013 | C | 7 | Updated paragraph 2.2.9.2.2 in response to CCR 6151. |
Feb-2020 | A | Feb-2013 | C | 6 | Added reference to paragraph 2.4.1.2 in response to CCR 4249 and updated paragraph 3.2.2.3.4 in response to CCR 4256. |
Nov-2019 | A | Feb-2013 | C | 5 | Incorporated dispersal of criteria from the retired UFC 3-440-05N TROPICAL ENGINEERING, and the addition of corrosion protection criteria to coordinate with UFC 1-200-01 DoD BUILDING CODE. |
Aug-2018 | A | Feb-2013 | C | 4 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Feb-2018 | A | Feb-2013 | C | 3 | In response to CCR 5445, added note to paragraph 3.2.1.6 for NAVFAC MAR Projects |
Nov-2017 | A | Feb-2013 | C | 2 | Added new paragraphs 2.4.1.4 and 2.4.2.7 per Mechanical DWG. |
Aug-2015 | A | Feb-2013 | C | 1 | UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements". |
Feb-2013 | A | Feb-2013 | R | Revised vapor barrier and insulation requirements. | |
Dec-2012 | A | Aug-2010 | C | 2 | INTERIM RELEASE: Removed polyisocyanurate insulation throughout the section. |
Nov-2012 | A | Aug-2010 | C | 1 | CCR 836: deleted aboveground cold pipe phenolic insulation |
Aug-2010 | A | Aug-2010 | R | Added GEI or SCS certification; CCR 3250 | |
Nov-2009 | A | Nov-2009 | R | Revised firestopping to close a CCR | |
Apr-2008 | A | Apr-2008 | R | Compliance with CSI SectionFormat | |
Jan-2008 | A | Jan-2008 | R | Incorporated EPAct05 requirements | |
Oct-2007 | A | Oct-2007 | R | General revisions for pipe, duct and equipment | |
Apr-2007 | A | Apr-2007 | R | Minor change to paragraph Vapor Barrier/Weatherproofing Jacket | |
Feb-2007 | A | Feb-2007 | R | INTERIM RELEASE: Corrected permeability | |
Jan-2007 | A | Jan-2007 | R | Added jacketing system | |
Jul-2006 | A | Jul-2006 | R | Various minor revisions |