Status
Active
View/Download
PDF   ZIP  
Publish Date
Pages
66
Spec. Division
23 - Heating, Ventilating, and Air Conditioning
CCR

History: Below is a listing of the Revisions and Changes made to this UFGS.

KEYPREPARING ACTIVITY (PA)A ArmyN NavyF Air ForceS NASA [ARCHIVED]
ACTIONN NewR RevisionC ChangeD Deletion
Release PA Action Change # Nature of Change or Revision
Aug-2024 A R Complete review and update.
May-2020 A C 7 Updated paragraph 2.2.9.2.2 in response to CCR 6151.
Feb-2020 A C 6 Added reference to paragraph 2.4.1.2 in response to CCR 4249 and updated paragraph 3.2.2.3.4 in response to CCR 4256.
Nov-2019 A C 5 Incorporated dispersal of criteria from the retired UFC 3-440-05N TROPICAL ENGINEERING, and the addition of corrosion protection criteria to coordinate with UFC 1-200-01 DoD BUILDING CODE.
Aug-2018 A C 4 Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.
Feb-2018 A C 3 In response to CCR 5445, added note to paragraph 3.2.1.6 for NAVFAC MAR Projects
Nov-2017 A C 2 Added new paragraphs 2.4.1.4 and 2.4.2.7 per Mechanical DWG.
Aug-2015 A C 1 UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".
Feb-2013 A R Revised vapor barrier and insulation requirements.
Dec-2012 A C 2 INTERIM RELEASE: Removed polyisocyanurate insulation throughout the section.
Nov-2012 A C 1 CCR 836: deleted aboveground cold pipe phenolic insulation
Aug-2010 A R Added GEI or SCS certification; CCR 3250
Nov-2009 A R Revised firestopping to close a CCR
Apr-2008 A R Compliance with CSI SectionFormat
Jan-2008 A R Incorporated EPAct05 requirements
Oct-2007 A R General revisions for pipe, duct and equipment
Apr-2007 A R Minor change to paragraph Vapor Barrier/Weatherproofing Jacket
Feb-2007 A R INTERIM RELEASE: Corrected permeability
Jan-2007 A R Added jacketing system
Jul-2006 A R Various minor revisions