UFGS 31 10 00 Site Clearing |
02-01-2021 |
PDF | ZIP |
CCR |
UFGS 02 32 13 Subsurface Drilling and Sampling |
02-01-2021 |
PDF | ZIP |
CCR |
UFGS 31 66 10 Rock Foundation Preparation |
02-01-2021 |
PDF | ZIP |
CCR |
UFGS 31 21 00 Off-Gassing Mitigation |
02-01-2021 |
PDF | ZIP |
CCR |
UFGS 02 53 16.13 Remediation of Contaminated Soils by Thermal Desorption |
02-01-2021 |
PDF | ZIP |
CCR |
UFGS 31 73 19 Tunnel and Shaft Grouting |
02-01-2021 |
PDF | ZIP |
CCR |
UFGS 09 97 13.27 High Performance Coating for Steel Structures |
02-01-2021 |
PDF | ZIP |
CCR |
UFGS 31 36 00 Gabions |
02-01-2021 |
PDF | ZIP |
CCR |
UFGS 02 54 19.13 Bioremediation Using Landfarming |
02-01-2021 |
PDF | ZIP |
CCR |
UFGS 31 23 01 Underwater Blasting |
02-01-2021 |
PDF | ZIP |
CCR |
UFGS 33 01 50.55 Cleaning of Petroleum Storage Tanks |
02-01-2021 |
PDF | ZIP |
CCR |
UFGS 31 62 23.13 Concrete-Filled Steel Piles |
02-01-2021 |
PDF | ZIP |
CCR |
UFGS 02 54 19.16 Bioremediation of Soils Using Windrow Composting |
02-01-2021 |
PDF | ZIP |
CCR |
UFGS 31 23 06.00 Blasting - Surface |
02-01-2021 |
PDF | ZIP |
CCR |
UFGS 01 33 29 Sustainability Requirements and Reporting |
02-01-2021 |
PDF | ZIP |
CCR |
UFGS 02 51 19 Solidification and Stabilization Decontamination |
02-01-2021 |
PDF | ZIP |
CCR |
UFGS 33 01 50.65 Inspection of Field Fabricated Fuel Storage Tanks |
02-01-2021 |
PDF | ZIP |
CCR |
UFGS 02 56 13.13 Geomembrane Waste Containment |
02-01-2021 |
PDF | ZIP |
CCR |
UFGS 02 56 13.16 Clay Waste Containment |
02-01-2021 |
PDF | ZIP |
CCR |
UFGS 32 84 23 Underground Sprinklers |
02-01-2021 |
PDF | ZIP |
CCR |
UFGS 02 56 13.19 Geosynthetic Clay Liner Waste Containment |
02-01-2021 |
PDF | ZIP |
CCR |
UFGS 33 09 53 Aviation Fuel Pump Control and Annunciation System (Type III) |
02-01-2021 |
PDF | ZIP |
CCR |
UFGS 02 66 13 Select Fill and Topsoil for Landfill Cover |
02-01-2021 |
PDF | ZIP |
CCR |
UFGS 02 66 16 Test Fill |
02-01-2021 |
PDF | ZIP |
CCR |
UFGS 31 32 19.16 Geotextile Soil Stabilization |
02-01-2021 |
PDF | ZIP |
CCR |
UFGS 26 13 00 SF6/High-Firepoint Fluids Insulated Pad-Mounted Switchgear |
05-01-2021 |
PDF | ZIP |
CCR |
UFGS 46 53 62 Continuous Loop Reactor (CLR) Wastewater Treatment System |
05-01-2021 |
PDF | ZIP |
CCR |
UFGS 26 27 29 Marina Electrical Work |
05-01-2021 |
PDF | ZIP |
CCR |
UFGS 46 61 00 Filtration Equipment |
05-01-2021 |
PDF | ZIP |
CCR |
UFGS 46 66 56 Open-Channel Disinfection Equipment |
05-01-2021 |
PDF | ZIP |
CCR |
UFGS 25 08 10 Utility Monitoring and Control System Testing |
05-01-2021 |
PDF | ZIP |
CCR |
UFGS 23 25 00 Chemical Treatment of Water for Mechanical Systems |
05-01-2021 |
PDF | ZIP |
CCR |
UFGS 25 05 11 Cybersecurity for Facility-Related Control Systems |
05-01-2021 |
PDF | ZIP |
CCR |
UFGS 26 42 13 Galvanic (Sacrificial) Anode Cathodic Protection (GACP) System |
05-01-2021 |
PDF | ZIP |
CCR |
UFGS 35 01 70.13 Wire Rope for Gate Operating Devices |
05-01-2021 |
PDF | ZIP |
CCR |
UFGS 26 42 15 Cathodic Protection System for the Interior of Steel Water Tanks |
05-01-2021 |
PDF | ZIP |
CCR |
UFGS 35 45 02.00 10 Submersible Pump, Axial-Flow and Mixed-Flow Type |
05-01-2021 |
PDF | ZIP |
CCR |
UFGS 05 59 20 Fabrication Of Hydraulic Steel Structures |
05-01-2021 |
PDF | ZIP |
CCR |
UFGS 26 42 17 Impressed Current Cathodic Protection (ICCP) System |
05-01-2021 |
PDF | ZIP |
CCR |
UFGS 46 20 20 Sewage Bar Screen and Mechanical Shredder |
05-01-2021 |
PDF | ZIP |
CCR |
UFGS 35 20 16.54 Slide Gates and Actuators |
05-01-2021 |
PDF | ZIP |
CCR |
UFGS 46 24 16 Comminutors |
05-01-2021 |
PDF | ZIP |
CCR |
UFGS 46 07 13.13 Precipitation/Coagulation/Flocculation (P/C/F) Water Treatment |
05-01-2021 |
PDF | ZIP |
CCR |
UFGS 46 51 00.00 10 Air and Gas Diffusion System |
05-01-2021 |
PDF | ZIP |
CCR |
UFGS 23 76 00 Evaporative Cooling Systems |
08-01-2021 |
PDF | ZIP |
CCR |
UFGS 26 35 44 270 VDC Solid State Converter |
08-01-2021 |
PDF | ZIP |
CCR |
UFGS 08 34 16.20 Vertical Lift Fabric Doors |
08-01-2021 |
PDF | ZIP |
CCR |
UFGS 23 54 19 Building Heating Systems, Warm Air |
08-01-2021 |
PDF | ZIP |
CCR |
UFGS 09 97 10.00 10 Metallic Coatings for Hydraulic Structures |
08-01-2021 |
PDF | ZIP |
CCR |
UFGS 33 71 02 Underground Electrical Distribution |
08-01-2021 |
PDF | ZIP |
CCR |
UFGS 23 23 00 Refrigerant Piping |
08-01-2021 |
PDF | ZIP |
CCR |
UFGS 26 24 13 Switchboards |
08-01-2021 |
PDF | ZIP |
CCR |
UFGS 26 56 00 Exterior Lighting |
08-01-2021 |
PDF | SEC |
CCR |
UFGS 26 35 43 400-Hertz (HZ) Solid State Frequency Converter |
08-01-2021 |
PDF | ZIP |
CCR |
UFGS 03 53 14 Light Reflective Nonferrous Metallic Aggregate Floor System |
08-01-2021 |
PDF | ZIP |
CCR |
UFGS 33 01 30.16 TV Inspection of Sewer Lines |
11-01-2021 |
PDF | ZIP |
CCR |
UFGS 33 01 30.72 Relining Sewers |
11-01-2021 |
PDF | ZIP |
CCR |
UFGS 31 23 00.00 Tunnel Excavation – Blasting |
11-01-2021 |
PDF | ZIP |
CCR |
UFGS 33 40 00 Stormwater Utilities |
11-01-2021 |
PDF | ZIP |
CCR |
UFGS 08 34 16.10 Horizontal Rolling Steel Doors |
11-01-2021 |
PDF | ZIP |
CCR |
UFGS 26 11 14.00 10 Main Electric Supply Station and Substation |
11-01-2021 |
PDF | ZIP |
CCR |
UFGS 35 59 13.16 Extruded and Molded Marine Fenders |
11-01-2021 |
PDF | ZIP |
CCR |
UFGS 26 13 13 Metal-Clad Switchgear |
11-01-2021 |
PDF | ZIP |
CCR |
UFGS 26 31 00 Facility-Scale Solar Photovoltaic (PV) Systems |
11-01-2021 |
PDF | ZIP |
CCR |
UFGS 26 13 14 Switchgear House |
11-01-2021 |
PDF | ZIP |
CCR |
UFGS 27 41 00 Audio-Visual Systems |
11-01-2021 |
PDF | ZIP |
CCR |
UFGS 27 51 23 Intercommunication System |
11-01-2021 |
PDF | ZIP |
CCR |
UFGS 26 11 13.00 20 Primary Unit Substation |
11-01-2021 |
PDF | ZIP |
CCR |
UFGS 35 59 13.17 Foam-Filled Marine Fenders |
11-01-2021 |
PDF | ZIP |
CCR |
UFGS 26 11 16 Secondary Unit Substations |
11-01-2021 |
PDF | ZIP |
CCR |
UFGS 35 59 13.18 Pneumatic and Hydro-Pneumatic Marine Fenders |
11-01-2021 |
PDF | ZIP |
CCR |
UFGS 32 31 13 Chain Link Fences and Gates |
11-01-2021 |
PDF | ZIP |
CCR |
UFGS 32 31 13.53 High-Security Fences (Chain Link and Ornamental) and Gates |
11-01-2021 |
PDF | ZIP |
CCR |
UFGS 32 31 26 Wire Fences and Gates |
11-01-2021 |
PDF | ZIP |
CCR |
UFGS 41 22 13.55 Bridge Cranes, Under Running, Aircraft Hangar |
02-01-2022 |
PDF | ZIP |
CCR |
UFGS 34 75 13.13 Crash Rated Active Vehicle Barriers And Controls |
02-01-2022 |
PDF | ZIP |
CCR |
UFGS 35 20 23.13 National Dredging Quality Management Program - Scow [Monitoring][ and ][Ullage] Profile |
02-01-2022 |
PDF | ZIP |
CCR |
UFGS 35 20 23.23 National Dredging Quality Management Program - Hopper Dredge |
02-01-2022 |
PDF | ZIP |
CCR |
UFGS 26 05 33 Dockside Power Connection Stations |
02-01-2022 |
PDF | ZIP |
CCR |
UFGS 35 20 23.33 National Dredging Quality Management Program - Pipeline Hydraulic Dredge |
02-01-2022 |
PDF | ZIP |
CCR |
UFGS 09 97 13.17 Three Coat Epoxy Interior Coating of Welded Steel Petroleum Fuel Tanks |
05-01-2022 |
PDF | ZIP |
CCR |
UFGS 35 20 20 Electrical Equipment for Gate Hoist |
05-01-2022 |
PDF | ZIP |
CCR |
UFGS 35 45 03.00 10 Speed Reducers for Storm Water Pumps |
05-01-2022 |
PDF | ZIP |
CCR |
UFGS 13 48 73 Seismic Control For Miscellaneous Equipment |
05-01-2022 |
PDF | ZIP |
CCR |
UFGS 23 01 30.41 HVAC System Cleaning |
05-01-2022 |
PDF | ZIP |
CCR |
UFGS 01 31 20 Project Technical Data Management and Visualization |
05-01-2022 |
PDF | ZIP |
CCR |
UFGS 32 01 17.61 Sealing Cracks in Asphalt Paving |
05-01-2022 |
PDF | ZIP |
CCR |
UFGS 23 05 15 Common Piping for HVAC |
05-01-2022 |
PDF | ZIP |
CCR |
UFGS 33 51 43 Instrumentation and Performance Monitoring of Structures |
05-01-2022 |
PDF | ZIP |
CCR |
UFGS 32 11 20 [Base Course for Rigid][ and ][Subbase] [Select-Material] [For Flexible Paving] |
05-01-2022 |
PDF | ZIP |
CCR |
UFGS 05 05 20 Post-Installed Concrete and Masonry Anchors |
05-01-2022 |
PDF | ZIP |
CCR |
UFGS 32 11 23 [Aggregate Base Course] [and][or] [Graded Crushed Aggregate Base Course] for Flexible Paving |
05-01-2022 |
PDF | ZIP |
CCR |
UFGS 23 63 00.00 Cold Storage Refrigeration Systems |
08-01-2022 |
PDF | ZIP |
CCR |
UFGS 31 31 16.13 Chemical Termite Control |
08-01-2022 |
PDF | ZIP |
CCR |
UFGS 31 31 16.19 Termite Control Barriers |
08-01-2022 |
PDF | ZIP |
CCR |
UFGS 02 41 00 [Demolition] [and] [Deconstruction] |
08-01-2022 |
PDF | ZIP |
CCR |
UFGS 32 11 23.23 Base Course Drainage Layers |
08-01-2022 |
PDF | ZIP |
CCR |
UFGS 03 11 19.00 Insulating Concrete Forming |
08-01-2022 |
PDF | ZIP |
CCR |
UFGS 09 06 00 Schedules for Finishes |
08-01-2022 |
PDF | ZIP |
CCR |
UFGS 33 52 80 Liquid Fuels Pipeline Coating Systems |
08-01-2022 |
PDF | ZIP |
CCR |
UFGS 35 20 14 Stoplogs |
08-01-2022 |
PDF | ZIP |
CCR |
UFGS 35 20 16.33 Hydraulic Miter Gates |
08-01-2022 |
PDF | ZIP |
CCR |
UFGS 35 20 16.39 Hydraulic Sector Gates |
08-01-2022 |
PDF | ZIP |
CCR |
UFGS 01 57 19 Temporary Environmental Controls |
08-01-2022 |
PDF | ZIP |
CCR |
UFGS 26 28 00.00 10 Motor Control Centers, Switchboards and Panelboards |
08-01-2022 |
PDF | ZIP |
CCR |
UFGS 35 20 16.46 Hydraulic Tainter Gates and Anchorages |
08-01-2022 |
PDF | ZIP |
CCR |
UFGS 35 20 16.53 Hydraulic Vertical Lift Gates |
08-01-2022 |
PDF | ZIP |
CCR |
UFGS 35 20 16.59 Closure Gates |
08-01-2022 |
PDF | ZIP |
CCR |
UFGS 26 29 02.00 10 Electric Motors, 3-Phase Vertical Synchronous Type |
11-01-2022 |
PDF | ZIP |
CCR |
UFGS 41 22 13.15 Bridge Cranes, Overhead Electric, Under Running Trolley |
11-01-2022 |
PDF | ZIP |
CCR |
UFGS 44 10 00 Air Pollution Control |
11-01-2022 |
PDF | ZIP |
CCR |
UFGS 31 71 19 Tunnel and Shaft Excavation in Rock - Mechanical |
11-01-2022 |
PDF | ZIP |
CCR |
UFGS 32 01 16.71 Cold Milling Asphalt Paving |
11-01-2022 |
PDF | ZIP |
CCR |
UFGS 26 12 21 Single-Phase Pad-Mounted Transformers |
11-01-2022 |
PDF | ZIP |
CCR |
UFGS 02 65 00 Underground Storage Tank Removal |
11-01-2022 |
PDF | ZIP |
CCR |
UFGS 02 84 16 Handling of Lighting Ballasts and Lamps Containing PCBs and Mercury |
11-01-2022 |
PDF | ZIP |
CCR |
UFGS 05 59 10 Rolling Cover for Aviation Refueling Vaults |
11-01-2022 |
PDF | ZIP |
CCR |
UFGS 02 84 33 Removal and Disposal of Polychlorinated Biphenyls (PCBs) |
11-01-2022 |
PDF | ZIP |
CCR |
UFGS 08 34 49.00 20 Hemp Shielded Door |
11-01-2022 |
PDF | ZIP |
CCR |
UFGS 08 71 63.10 Electrical Locking Control for Brigs |
11-01-2022 |
PDF | ZIP |
CCR |
UFGS 33 56 19 Fuel Impermeable Liner System |
11-01-2022 |
PDF | ZIP |
CCR |
UFGS 32 13 14.13 Concrete Paving for Airfields and Other Heavy Duty Pavements |
11-01-2022 |
PDF | ZIP |
CCR |
UFGS 26 05 19.00 10 Insulated Wire and Cable |
11-01-2022 |
PDF | ZIP |
CCR |
UFGS 01 14 00 Work Restrictions |
11-01-2022 |
PDF | ZIP |
CCR |
UFGS 26 08 00 Apparatus Inspection and Testing |
11-01-2022 |
PDF | ZIP |
CCR |