Unified Facilities Guide Specifications (UFGS)  Subscribe to Unified Facilities Guide Specifications (UFGS)

Title Datesort descending View CCR
UFGS 31 10 00 Site Clearing   02-01-2021  PDF |  ZIP  CCR
UFGS 35 45 01 Vertical Pumps, Axial-Flow and Mixed-Flow Impeller-Type   02-01-2021  PDF |  ZIP  CCR
UFGS 31 56 13.13 Soil-Bentonite Slurry Walls   02-01-2021  PDF |  ZIP  CCR
UFGS 31 21 00 Off-Gassing Mitigation   02-01-2021  PDF |  ZIP  CCR
UFGS 02 32 13 Subsurface Drilling and Sampling   02-01-2021  PDF |  ZIP  CCR
UFGS 31 66 10 Rock Foundation Preparation   02-01-2021  PDF |  ZIP  CCR
UFGS 09 97 13.27 High Performance Coating for Steel Structures   02-01-2021  PDF |  ZIP  CCR
UFGS 31 36 00 Gabions   02-01-2021  PDF |  ZIP  CCR
UFGS 02 53 16.13 Remediation of Contaminated Soils by Thermal Desorption   02-01-2021  PDF |  ZIP  CCR
UFGS 31 73 19 Tunnel and Shaft Grouting   02-01-2021  PDF |  ZIP  CCR
UFGS 31 62 23.13 Concrete-Filled Steel Piles   02-01-2021  PDF |  ZIP  CCR
UFGS 02 54 19.13 Bioremediation Using Landfarming   02-01-2021  PDF |  ZIP  CCR
UFGS 31 23 01 Underwater Blasting   02-01-2021  PDF |  ZIP  CCR
UFGS 33 01 50.55 Cleaning of Petroleum Storage Tanks   02-01-2021  PDF |  ZIP  CCR
UFGS 02 54 19.16 Bioremediation of Soils Using Windrow Composting   02-01-2021  PDF |  ZIP  CCR
UFGS 31 23 06.00 Blasting - Surface   02-01-2021  PDF |  ZIP  CCR
UFGS 01 33 29 Sustainability Requirements and Reporting   02-01-2021  PDF |  ZIP  CCR
UFGS 02 51 19 Solidification and Stabilization Decontamination   02-01-2021  PDF |  ZIP  CCR
UFGS 33 01 50.65 Inspection of Field Fabricated Fuel Storage Tanks   02-01-2021  PDF |  ZIP  CCR
UFGS 02 56 13.13 Geomembrane Waste Containment   02-01-2021  PDF |  ZIP  CCR
UFGS 32 84 23 Underground Sprinklers   02-01-2021  PDF |  ZIP  CCR
UFGS 02 56 13.16 Clay Waste Containment   02-01-2021  PDF |  ZIP  CCR
UFGS 33 09 53 Aviation Fuel Pump Control and Annunciation System (Type III)   02-01-2021  PDF |  ZIP  CCR
UFGS 02 56 13.19 Geosynthetic Clay Liner Waste Containment   02-01-2021  PDF |  ZIP  CCR
UFGS 02 66 13 Select Fill and Topsoil for Landfill Cover   02-01-2021  PDF |  ZIP  CCR
UFGS 46 24 16 Comminutors   05-01-2021  PDF |  ZIP  CCR
UFGS 46 07 13.13 Precipitation/Coagulation/Flocculation (P/C/F) Water Treatment   05-01-2021  PDF |  ZIP  CCR
UFGS 46 51 00.00 10 Air and Gas Diffusion System   05-01-2021  PDF |  ZIP  CCR
UFGS 26 13 00 SF6/High-Firepoint Fluids Insulated Pad-Mounted Switchgear   05-01-2021  PDF |  ZIP  CCR
UFGS 46 53 62 Continuous Loop Reactor (CLR) Wastewater Treatment System   05-01-2021  PDF |  ZIP  CCR
UFGS 26 27 29 Marina Electrical Work   05-01-2021  PDF |  ZIP  CCR
UFGS 46 61 00 Filtration Equipment   05-01-2021  PDF |  ZIP  CCR
UFGS 46 66 56 Open-Channel Disinfection Equipment   05-01-2021  PDF |  ZIP  CCR
UFGS 25 08 10 Utility Monitoring and Control System Testing   05-01-2021  PDF |  ZIP  CCR
UFGS 23 25 00 Chemical Treatment of Water for Mechanical Systems   05-01-2021  PDF |  ZIP  CCR
UFGS 25 05 11 Cybersecurity for Facility-Related Control Systems   05-01-2021  PDF |  ZIP  CCR
UFGS 26 42 13 Galvanic (Sacrificial) Anode Cathodic Protection (GACP) System   05-01-2021  PDF |  ZIP  CCR
UFGS 35 01 70.13 Wire Rope for Gate Operating Devices   05-01-2021  PDF |  ZIP  CCR
UFGS 26 42 15 Cathodic Protection System for the Interior of Steel Water Tanks   05-01-2021  PDF |  ZIP  CCR
UFGS 35 45 02.00 10 Submersible Pump, Axial-Flow and Mixed-Flow Type   05-01-2021  PDF |  ZIP  CCR
UFGS 05 59 20 Fabrication Of Hydraulic Steel Structures   05-01-2021  PDF |  ZIP  CCR
UFGS 26 42 17 Impressed Current Cathodic Protection (ICCP) System   05-01-2021  PDF |  ZIP  CCR
UFGS 46 20 20 Sewage Bar Screen and Mechanical Shredder   05-01-2021  PDF |  ZIP  CCR
UFGS 35 20 16.54 Slide Gates and Actuators   05-01-2021  PDF |  ZIP  CCR
UFGS 03 53 14 Light Reflective Nonferrous Metallic Aggregate Floor System   08-01-2021  PDF |  ZIP  CCR
UFGS 23 76 00 Evaporative Cooling Systems   08-01-2021  PDF |  ZIP  CCR
UFGS 26 35 44 270 VDC Solid State Converter   08-01-2021  PDF |  ZIP  CCR
UFGS 08 34 16.20 Vertical Lift Fabric Doors   08-01-2021  PDF |  ZIP  CCR
UFGS 23 54 19 Building Heating Systems, Warm Air   08-01-2021  PDF |  ZIP  CCR
UFGS 09 97 10.00 10 Metallic Coatings for Hydraulic Structures   08-01-2021  PDF |  ZIP  CCR
UFGS 33 71 02 Underground Electrical Distribution   08-01-2021  PDF |  ZIP  CCR
UFGS 23 23 00 Refrigerant Piping   08-01-2021  PDF |  ZIP  CCR
UFGS 26 24 13 Switchboards   08-01-2021  PDF |  ZIP  CCR
UFGS 26 56 00 Exterior Lighting   08-01-2021  PDF |  SEC  CCR
UFGS 26 35 43 400-Hertz (HZ) Solid State Frequency Converter   08-01-2021  PDF |  ZIP  CCR
UFGS 32 31 13.53 High-Security Fences (Chain Link and Ornamental) and Gates   11-01-2021  PDF |  ZIP  CCR
UFGS 32 31 26 Wire Fences and Gates   11-01-2021  PDF |  ZIP  CCR
UFGS 33 01 30.16 TV Inspection of Sewer Lines   11-01-2021  PDF |  ZIP  CCR
UFGS 33 01 30.72 Relining Sewers   11-01-2021  PDF |  ZIP  CCR
UFGS 33 40 00 Stormwater Utilities   11-01-2021  PDF |  ZIP  CCR
UFGS 31 23 00.00 Tunnel Excavation – Blasting   11-01-2021  PDF |  ZIP  CCR
UFGS 08 34 16.10 Horizontal Rolling Steel Doors   11-01-2021  PDF |  ZIP  CCR
UFGS 26 11 14.00 10 Main Electric Supply Station and Substation   11-01-2021  PDF |  ZIP  CCR
UFGS 35 59 13.16 Extruded and Molded Marine Fenders   11-01-2021  PDF |  ZIP  CCR
UFGS 26 13 13 Metal-Clad Switchgear   11-01-2021  PDF |  ZIP  CCR
UFGS 26 31 00 Facility-Scale Solar Photovoltaic (PV) Systems   11-01-2021  PDF |  ZIP  CCR
UFGS 26 13 14 Switchgear House   11-01-2021  PDF |  ZIP  CCR
UFGS 27 41 00 Audio-Visual Systems   11-01-2021  PDF |  ZIP  CCR
UFGS 27 51 23 Intercommunication System   11-01-2021  PDF |  ZIP  CCR
UFGS 35 59 13.17 Foam-Filled Marine Fenders   11-01-2021  PDF |  ZIP  CCR
UFGS 26 11 13.00 20 Primary Unit Substation   11-01-2021  PDF |  ZIP  CCR
UFGS 35 59 13.18 Pneumatic and Hydro-Pneumatic Marine Fenders   11-01-2021  PDF |  ZIP  CCR
UFGS 26 11 16 Secondary Unit Substations   11-01-2021  PDF |  ZIP  CCR
UFGS 32 31 13 Chain Link Fences and Gates   11-01-2021  PDF |  ZIP  CCR
UFGS 41 22 13.55 Bridge Cranes, Under Running, Aircraft Hangar   02-01-2022  PDF |  ZIP  CCR
UFGS 34 75 13.13 Crash Rated Active Vehicle Barriers And Controls   02-01-2022  PDF |  ZIP  CCR
UFGS 35 20 23.13 National Dredging Quality Management Program - Scow [Monitoring][ and ][Ullage] Profile   02-01-2022  PDF |  ZIP  CCR
UFGS 35 20 23.23 National Dredging Quality Management Program - Hopper Dredge   02-01-2022  PDF |  ZIP  CCR
UFGS 35 20 23.33 National Dredging Quality Management Program - Pipeline Hydraulic Dredge   02-01-2022  PDF |  ZIP  CCR
UFGS 26 05 33 Dockside Power Connection Stations   02-01-2022  PDF |  ZIP  CCR
UFGS 33 51 43 Instrumentation and Performance Monitoring of Structures   05-01-2022  PDF |  ZIP  CCR
UFGS 32 11 20 [Base Course for Rigid][ and ][Subbase] [Select-Material] [For Flexible Paving]   05-01-2022  PDF |  ZIP  CCR
UFGS 05 05 20 Post-Installed Concrete and Masonry Anchors   05-01-2022  PDF |  ZIP  CCR
UFGS 32 11 23 [Aggregate Base Course] [and][or] [Graded Crushed Aggregate Base Course] for Flexible Paving   05-01-2022  PDF |  ZIP  CCR
UFGS 09 97 13.17 Three Coat Epoxy Interior Coating of Welded Steel Petroleum Fuel Tanks   05-01-2022  PDF |  ZIP  CCR
UFGS 35 20 20 Electrical Equipment for Gate Hoist   05-01-2022  PDF |  ZIP  CCR
UFGS 35 45 03.00 10 Speed Reducers for Storm Water Pumps   05-01-2022  PDF |  ZIP  CCR
UFGS 13 48 73 Seismic Control For Miscellaneous Equipment   05-01-2022  PDF |  ZIP  CCR
UFGS 23 01 30.41 HVAC System Cleaning   05-01-2022  PDF |  ZIP  CCR
UFGS 01 31 20 Project Technical Data Management and Visualization   05-01-2022  PDF |  ZIP  CCR
UFGS 32 01 17.61 Sealing Cracks in Asphalt Paving   05-01-2022  PDF |  ZIP  CCR
UFGS 23 05 15 Common Piping for HVAC   05-01-2022  PDF |  ZIP  CCR
UFGS 35 20 16.53 Hydraulic Vertical Lift Gates   08-01-2022  PDF |  ZIP  CCR
UFGS 35 20 16.59 Closure Gates   08-01-2022  PDF |  ZIP  CCR
UFGS 23 63 00.00 Cold Storage Refrigeration Systems   08-01-2022  PDF |  ZIP  CCR
UFGS 31 31 16.13 Chemical Termite Control   08-01-2022  PDF |  ZIP  CCR
UFGS 31 31 16.19 Termite Control Barriers   08-01-2022  PDF |  ZIP  CCR
UFGS 32 11 23.23 Base Course Drainage Layers   08-01-2022  PDF |  ZIP  CCR
UFGS 02 41 00 [Demolition] [and] [Deconstruction]   08-01-2022  PDF |  ZIP  CCR
UFGS 03 11 19.00 Insulating Concrete Forming   08-01-2022  PDF |  ZIP  CCR
UFGS 33 52 80 Liquid Fuels Pipeline Coating Systems   08-01-2022  PDF |  ZIP  CCR
UFGS 09 06 00 Schedules for Finishes   08-01-2022  PDF |  ZIP  CCR
UFGS 35 20 14 Stoplogs   08-01-2022  PDF |  ZIP  CCR
UFGS 35 20 16.33 Hydraulic Miter Gates   08-01-2022  PDF |  ZIP  CCR
UFGS 35 20 16.39 Hydraulic Sector Gates   08-01-2022  PDF |  ZIP  CCR
UFGS 01 57 19 Temporary Environmental Controls   08-01-2022  PDF |  ZIP  CCR
UFGS 26 28 00.00 10 Motor Control Centers, Switchboards and Panelboards   08-01-2022  PDF |  ZIP  CCR
UFGS 35 20 16.46 Hydraulic Tainter Gates and Anchorages   08-01-2022  PDF |  ZIP  CCR
UFGS 26 08 00 Apparatus Inspection and Testing   11-01-2022  PDF |  ZIP  CCR
UFGS 26 29 01.00 10 Electric Motors, 3-Phase Vertical Induction Type   11-01-2022  PDF |  ZIP  CCR
UFGS 26 29 02.00 10 Electric Motors, 3-Phase Vertical Synchronous Type   11-01-2022  PDF |  ZIP  CCR
UFGS 41 22 13.15 Bridge Cranes, Overhead Electric, Under Running Trolley   11-01-2022  PDF |  ZIP  CCR
UFGS 31 71 19 Tunnel and Shaft Excavation in Rock - Mechanical   11-01-2022  PDF |  ZIP  CCR
UFGS 44 10 00 Air Pollution Control   11-01-2022  PDF |  ZIP  CCR
UFGS 32 01 16.71 Cold Milling Asphalt Paving   11-01-2022  PDF |  ZIP  CCR
UFGS 26 12 21 Single-Phase Pad-Mounted Transformers   11-01-2022  PDF |  ZIP  CCR
UFGS 02 65 00 Underground Storage Tank Removal   11-01-2022  PDF |  ZIP  CCR
UFGS 02 84 16 Handling of Lighting Ballasts and Lamps Containing PCBs and Mercury   11-01-2022  PDF |  ZIP  CCR
UFGS 05 59 10 Rolling Cover for Aviation Refueling Vaults   11-01-2022  PDF |  ZIP  CCR
UFGS 02 84 33 Removal and Disposal of Polychlorinated Biphenyls (PCBs)   11-01-2022  PDF |  ZIP  CCR
UFGS 08 34 49.00 20 Hemp Shielded Door   11-01-2022  PDF |  ZIP  CCR
UFGS 33 56 19 Fuel Impermeable Liner System   11-01-2022  PDF |  ZIP  CCR
UFGS 08 71 63.10 Electrical Locking Control for Brigs   11-01-2022  PDF |  ZIP  CCR
UFGS 32 13 14.13 Concrete Paving for Airfields and Other Heavy Duty Pavements   11-01-2022  PDF |  ZIP  CCR
UFGS 26 05 19.00 10 Insulated Wire and Cable   11-01-2022  PDF |  ZIP  CCR

Pages