Status
Active
View/Download
PDF   ZIP  
Publish Date
Pages
62
Spec. Division
35 - Waterway and Marine Construction
CCR

History: Below is a listing of the Revisions and Changes made to this UFGS.

KEYPREPARING ACTIVITY (PA)A ArmyN NavyF Air ForceS NASA [ARCHIVED]
ACTIONN NewR RevisionC ChangeD Deletion
Release PA Action Change # Nature of Change or Revision
Feb-2020 A C 1 Incorporated changes to provide clarification to the responsibility of the contractor related to subsurface interpretation in paragraph 1.6.3; temporary excavation slopes in paragraph 3.9.5; and slope failure and sliding due to fault or negligence of the contractor in paragraph 3.11.
Nov-2018 A R Complete review and update.
Jan-2008 A R Compliance with CSI SectionFormat