Status
Active
View/Download
PDF   ZIP  
Publish Date
Pages
88
Spec. Division
26 - Electrical
CCR

History: Below is a listing of the Revisions and Changes made to this UFGS.

KEYPREPARING ACTIVITY (PA)A ArmyN NavyF Air ForceS NASA [ARCHIVED]
ACTIONN NewR RevisionC ChangeD Deletion
Release PA Action Change # Nature of Change or Revision
Aug-2025 N C 1

Telecommunications systems information removed and relocated to UFGS-27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM.

May-2025 N R

Complete review and update.

Aug-2023 N R Complete review and update to incorporate CCRs
Nov-2021 N C 3 In response to the following: CCR 10728, "Cable Trays" and optional "Cable Tray Design Data" were added to the Submittal Article under SD-03 and SD-05, respectively, and tagged in the CABLE TRAY paragraph; CCR 10729, optional text added for the cable tray to serve as the EGC in the Trough-Type Cable Trays, Ladder-Type Cable Trays, and Channel-Type Cable Trays paragraphs; and CCR 10730, able Tray Installation paragraph has been updated to prevent partial or complete obstruction of access by cable tray and tray supports.
May-2021 N C 2 Incorporated CCR changes throughout this section.
Nov-2019 N C 1 Incorporated dispersal of criteria from the retired UFC 3-440-05N TROPICAL ENGINEERING, and the addition of corrosion protection criteria to coordinate with UFC 1-200-01 DoD BUILDING CODE.
Aug-2019 N R Complete review and update
Aug-2017 N C 1 Updated to coordinate archiving of Section 23 09 23.13 20 BACnet Direct Digital Control Systems for HVAC to meet the requirement of 10 USC 2867 to adopt a “Department wide, Open Protocol, Energy Monitoring and Utility Control System Specification” for use in military construction and military family housing activities.
Feb-2014 N R Major revision
Aug-2008 N R Deleted reference to L-16303 and note, changed Transmission Distribution to Electrical Distribution
Jul-2007 N R Section References (SRF) update