Status
Active
View/Download
PDF   ZIP  
Publish Date
Pages
18
Spec. Division
26 - Electrical
CCR

History: Below is a listing of the Revisions and Changes made to this UFGS.

KEYPREPARING ACTIVITY (PA)A ArmyN NavyF Air ForceS NASA [ARCHIVED]
ACTIONN NewR RevisionC ChangeD Deletion
Release PA Action Change # Nature of Change or Revision
May-2022 N C 1 Per CCR 8883, updated Automatic Switch Controls paragraph (2.1.4) with options for 120Vac control power.
May-2021 N R Complete review and update.
Nov-2014 N N Superseding UGFS 26 13 00.00 20 SF6/High- Firepoint Fluids Insulated Pad-Mounted Switchgear