Status
Active
View/Download
/FFC/DOD/UFGS/UFGS%2022%2000%2070.pdf
/FFC/DOD/UFGS/UFGS%2022%2000%2070.zip
Publish Date
Pages
96
Spec. Division
22 - Plumbing
CCR
History: Below is a listing of the Revisions and Changes made to this UFGS.
KEY | PREPARING ACTIVITY (PA) | A Army | N Navy | F Air Force | S NASA [ARCHIVED] |
---|---|---|---|---|---|
ACTION | N New | R Revision | C Change | D Deletion |
Release | PA | Date | Action | Change # | Nature of Change or Revision |
---|---|---|---|---|---|
May-2020 | A | May-2020 | R | Complete review and update. | |
Feb-2020 | A | Nov-2011 | C | 3 | Updated paragraph 2.13 a. in response to CCR 2691. |
Aug-2018 | A | Nov-2011 | C | 2 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
Aug-2017 | A | Nov-2011 | C | 1 | Sustainability updates, formatting to meet UFC 1-300-02 , reference updates and general revisions. |
Nov-2011 | A | Nov-2011 | R | Added Deionized Water Piping; revised Drainage Piping; removed mandatory waterless urinals; and revised Copper-Silver Ionization | |
Feb-2011 | A | Feb-2011 | R | Minor clarifications throughout | |
Jun-2010 | A | Jun-2010 | R | INTERIM RELEASE: added EPA registration for Copper-Silver Ionization requirement | |
May-2009 | A | May-2009 | R | Revised Paragraph COPPER-SILVER IONIZATION SYSTEM | |
Feb-2009 | A | Feb-2009 | N | Supersedes UFGS 22 04 00.00 10 Plumbing, Hospital and UFGS 22 04 00.00 20 Hospital Plumbing Fixtures |