Status
Active
View/Download
PDF   ZIP  
Publish Date
Pages
34
Spec. Division
08 - Openings
CCR

History: Below is a listing of the Revisions and Changes made to this UFGS.

KEYPREPARING ACTIVITY (PA)A ArmyN NavyF Air ForceS NASA [ARCHIVED]
ACTIONN NewR RevisionC ChangeD Deletion
Release PA Action Change # Nature of Change or Revision
Aug-2024 N C 2 Corrected wind velocities in Wind Loads paragraph (1.3.2.1) to coordinate with UFC 3-301-01.
Nov-2021 N C 1 Targeted update to incorporate recent lessons learned for wire-rope termination, safety arresters, performance standards, warranty and other safety items.
Aug-2021 N R General periodic update to incorporate new fabric door technologies, materials and design methodologies to increase door performance and industry competition.
May-2014 N R Major revision; state-of-the-art study to improve VLFD reliability, improve performance requirements and increase vendor competitiveness.
Aug-2012 N C 1 Modified subparts 1.4.1, 1.5.1, 1.5.3; document was released 7/12
Oct-2006 N R Changes to windload requirements