Status
Active
View/Download
PDF   ZIP  
Publish Date
Pages
67
Spec. Division
04 - Masonry
CCR

History: Below is a listing of the Revisions and Changes made to this UFGS.

KEYPREPARING ACTIVITY (PA)A ArmyN NavyF Air ForceS NASA [ARCHIVED]
ACTIONN NewR RevisionC ChangeD Deletion
Release PA Action Change # Nature of Change or Revision
May-2025 A R

Complete review and update.

May-2019 A C 2 Added sentence to paragraph 2.6.2.7 in response to CCR 7025.
Nov-2018 A C 1 Added Single-Wythe Exterior Wall CMU Flashing System, requirements for tooled joints, and note for load-bearing unit types.
Nov-2015 A R Title changed from Masonry. UFGS refresh review and update
Nov-2012 A C 1 CCR: 2299: Added provisions for telescoping bar positioners
Feb-2011 A R Add Single-Wythe Masonry Wall Water Penetration Test (CCR 299)
Feb-2009 A R Revised 2.17 Insulation
Oct-2007 A R Updated seismic criteria
Oct-2006 A R Reconciled for lost data
Jul-2006 A R Combined adding NASA requirements and sustainable design requirements