Spec. Division
01 - General Requirements
CCR

History: Below is a listing of the Revisions and Changes made to this UFGS.

KEYPREPARING ACTIVITY (PA)A ArmyN NavyF Air ForceS NASA [ARCHIVED]
ACTIONN NewR RevisionC ChangeD Deletion
Release PA Action Change # Nature of Change or Revision
Aug-2024 A C 3 Incorporated various CCRs.
Aug-2022 A C 2 Incorporated CCRs 10035, 10883, and 10885.
Aug-2021 A C 1 Added Note to Submittal Article with instructions for Navy Design-Build projects.
Nov-2020 A R Revised to include NAVFAC Design-Build Division 01 tailoring options and CCRs.
Aug-2020 A C 4 Added notes for NAVFAC PAC requirements to paragraphs 1.2 and 2.2.1 in response to CCR 8831.
May-2020 A C 3 Added cybersecurity requirements during construction, paragraph 1.6, in response to CCR 7450.
Aug-2019 A C 2 Added tailoring option and editor's note to paragraph 3.6 in response to CCR 7602. Added reference tags and corrected character spacing in paragraph 1.5 in response to CCR 7624.
Feb-2019 A C 1 Corrected spelling errors in paragraphs 2.3.1 and 2.3.2 and deleted out of place measurements below paragraph 2.3.3 in response to CCR 7090.
May-2018 A R Complete review and update.
Feb-2016 A C 3 Added provision for dumpsters tailored to NAVFAC SE
May-2015 A C 2 CCR 4158: Updated Fencing Paragraph a. to height requirements in EM 385-1-1.
Aug-2014 A C 1 Moved execution requirements to Part 3 as noted in CCR 3562
Aug-2009 A R Revised USACE Project Sign requirements
Oct-2007 A N Superseding UFGS 01 50 00.00 20 Temporary Facilities and Controls, UFGS 01 50 00.00 40 Temporary Facilities and Controls, and UFGS 01 50 02.00 10 Temporary Construction Facilities