Spec. Division
01 - General Requirements
CCR
Summary

The Related Materials are available in  Adobe Acrobat (PDF)

History: Below is a listing of the Revisions and Changes made to this UFGS.

KEYPREPARING ACTIVITY (PA)A ArmyN NavyF Air ForceS NASA [ARCHIVED]
ACTIONN NewR RevisionC ChangeD Deletion
Release PA Action Change # Nature of Change or Revision
May-2025 N C 1

In response to the following: CCR 15361, promoted 'USE OF EXPLOSIVES' from a subparagraph to a main paragraph/article (3.7); CCR 15362, updated Monthly Exposure Report paragraph (1.5); CCR 15523, added Accident Prevention Plan (APP) Design and Accident Prevention Plan (APP) Construction to Submittals and text; CCR 15536, added Critical Lift Plan to Submittals and text; and CCR 16414, updated paragraph Unforeseen Hazardous Material (3.1.4)

May-2024 N R Complete review and update addressing changes within the 2024 EM 385-1-1.
Aug-2023 N C 4 In response to CCR 11849, "CONSTRUCTION INDOOR AIR QUALITY (IAQ) MANAGEMENT PLAN" (1.17) has been relocated to this section from UFGS-01 45 00 QUALITY CONTROL. The references and submittals have also been updated to correspond with this new Article.
Feb-2022 N C 3 Added "Government Designated Authority (GDA)" to Dive Safety Requirements paragraph. In response to CCR 11124, updated first sentence in Competent Person, Cranes and Rigging paragraph.
Nov-2021 N C 2 In response to CCR 10735, corrected CFR reference in the Competent Person for Confined Space Entry paragraph and updated the Work Around Flammable Materials paragraph.
Aug-2021 N C 1 In response to CCR 9981, updated Note in APP-Construction paragraph to clarify instructions for NAVFAC PAC DB and DBB project options.
Nov-2020 N R Revised to include NAVFAC Design-Build Division 01 tailoring option and incorporate CCRs.
Aug-2020 N C 10 In response to CCR 8826, changes to submittal requirements for NAVFAC PAC to mitigate schedule impacts: added Note under Submittal Article SD-01 and updated paragraph "ACCIDENT PREVENTION PLAN (APP)" (1.8).
May-2020 N C 9 In response to CCR 6508, administrative changes made in Part 1 and Part 3 to coincide with industry nomenclature. A link to the contractor safety self-evaluation checklist has been added to Contractor Safety Self-Evaluation Checklist (para 1.5).
Aug-2019 N C 8 In response to CCR 7273, "Dive Operations Plan" has been added as a submittal item under SD-01 and in paragraph "DIVE SAFETY REQUIREMENTS" (1.19)
May-2019 N C 7 In response to CCR 7271, added language to state the District Dive Coordinator will submit documents for approval via the Contracting Officer.
Feb-2018 N C 6 In response to CCR 5966, Note in para 1.6.1 has been updated to include Hawaii; in response to CCR 6077, item "e" under para 3.7.1 "Scaffolding" has been corrected.
Nov-2017 N C 5 Addition of lockout/tagout requirements when the Government of Utility is involved in the electrical outage
Feb-2017 N C 4 Added crane requirements for Critical Lift Plan, Barge Mounted, and Base Mounted Drum Hoists from NAVFAC P-307 that were not in EM 385-1-1. For Navy, added requirement of accident investigation reporting within 5 days of mishaps and 10 days of accidents.
Nov-2016 N C 3 In paragraph "Fall Protection for Roofing Work", item b. Steep-Sloped Roofs, changed slope from "4:1" to "4:12".
Aug-2016 N C 2 Changed requirements for portable ionizing radiation equipment.
May-2016 N C 1 Modified OSHA Form 300 and 300A requirements under Duties of the SSHO.
Nov-2015 N R Updated to EM 385-1-1 (NOV 2014) requirements and terms including clarifying requirements for Dive Protection, Fall Protection, Load Handling Equipment, and Electrical. Added Subcontractor Safety requirements for Navy only.
Aug-2013 N C 2 Modified subparts 1.3,1.6.1, 3.1.3, 3.4; Removed "A" for accept from Submittal Items
Aug-2012 N C 1 Modified subpart 1.7
Feb-2010 N R Section References (SRF) update
Aug-2009 N R Major revision
Aug-2009 N R Major revision
Feb-2009 N R Added 1.6.1.2
Nov-2008 N R Added Note for NAVFAC Pacific projects