UFGS Changes and Revisions  Subscribe to UFGS Changes and Revisions

Related Materials: Policy on UFGS Changes and Revisions

Below is a listing of the Revisions and Changes made to UFGS Sections for each quarterly release.

To view a list for a specific UFGS Release, select the UFGS release date from the 'Release' drop-down and click 'Apply'.

To view a list of all the revisions and changes made to a specific UFGS Section, select 'Any' from the "Release' drop down, type the Section number into the Search bar and select the Section to view, then click 'Apply'.

After clicking 'Apply', you can PRINT REPORT, which will include the nature of the change/revision.

To view the complete detailed history of all the revisions and changes made to a UFGS Section, click on the Section title.

KEY PREPARING ACTIVITY (PA) A Army N Navy F Air Force S NASA
ACTION N New R Revision C Change D Deletion
Release PA UFGS Section Action Change # Nature of Change or Revision
May-2023 N UFGS 01 78 23 Operation and Maintenance Data R Revised throughout to unify Army and Navy requirements of Operation and Maintenance Manuals that were previously in this Section and in UFGS-01 78 24.00 10 and UFGS-01 78 24.00 20. Incorporated industry standards for the Operation and Maintenance Manual organization.
May-2023 A UFGS 01 78 24.00 10 Facility Data Requirements R Non-technical revision to update the Target Refresh Date.
May-2023 N UFGS 01 78 24.00 20 Facility Data Workbook (FDW) R Removed Operation and Maintenance Manual requirements throughout, this content has been incorporated into UFGS 01 78 23. Only Facility Data Workbook requirements remain in this section. Section Title changed from FACILITY ELECTRONIC OPERATION AND MAINTENANCE SUPPORT INFORMATION (eOMSI) to FACILITY DATA WORKBOOK (FDW).
May-2023 A UFGS 01 91 00.15 10 Total Building Commissioning D Section Archived; 01 91 00.15 10 has been superseded by Unified Section UFGS-01 91 00.15 BUILDING COMMISSIONING Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2023 N UFGS 01 91 00.15 20 Total Building Commissioning D Superseded by unified UFGS-01 91 00.15 BUILDING COMMISSIONING. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2023 N UFGS 01 91 00.15 Building Commissioning N Section number has been reinstated with the unification of Army and Navy Commissioning Sections. This new version supersedes UFGS-01 91 00.15 10 and UFGS-01 91 00.15 20 TOTAL BUILDING COMMISSIONING. Title has been changed to BUILDING COMMISSIONING.
May-2023 A UFGS 01 91 19 Building Enclosure Commissioning N New UFGS section superseding UFGS 07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS.
May-2023 A UFGS 02 42 51 Carpet Removal and Reclamation C Administrative Change: Preparing Activity changed from NASA to USACE.
May-2023 A UFGS 07 05 23 Pressure Testing an Air Barrier System for Air Tightness D Superseded by UFGS 01 91 19 BUILDING ENCLOSURE COMMISSIONING. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2023 A UFGS 07 41 63 Fabricated Roof Panel Assemblies C Administrative Change: Preparing Activity changed from NASA to USACE.
May-2023 N UFGS 08 11 69 Metal Storm Doors D Section has been archived with no replacement. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2023 A UFGS 08 22 20 Fiberglass Reinforced Plastic (FRP) Doors and Frames C Administrative Change: Preparing Activity changed from NASA to USACE.
May-2023 A UFGS 08 33 23 Overhead Coiling Doors C Administrative Change: Preparing Activity changed from NASA to USACE
May-2023 A UFGS 08 34 73 Sound Control Door Assemblies C Administrative Change: Preparing Activity changed from NASA to USACE
May-2023 N UFGS 08 41 13 Aluminum-Framed Entrances and Storefronts C Administrative Change: Preparing Activity changed from NASA to NAVFAC.
May-2023 A UFGS 09 23 82 Fireproof Gypsum Plastering C Administrative Change: Preparing Activity changed from NASA to USACE
May-2023 A UFGS 09 67 23.13 Standard Resinous Flooring C Administrative Change: Preparing Activity changed from NASA to USACE
May-2023 A UFGS 09 96 00 High-Performance Coatings C Administrative Change: Preparing Activity changed from NASA to USACE
May-2023 N UFGS 10 44 16 Fire Extinguishers C Administrative Change: Preparing Activity changed from NASA to NAVFAC.
May-2023 N UFGS 23 08 00 Commissioning of Mechanical[ and Plumbing] Systems N Unified Section superseding UFGS-23 08 00.00 20 COMMISSIONING OF MECHANICAL[ AND PLUMBING] SYSTEMS.
May-2023 N UFGS 23 08 00.00 20 Commissioning of Mechanical[ and Plumbing] Systems D Superseded by unified UFGS-23 08 00 COMMISSIONING OF MECHANICAL[ AND PLUMBING] SYSTEMS. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2023 S UFGS 26 12 19.00 40 Pad-Mounted, Liquid-Filled Medium-Voltage Transformers R Complete life cycle review. Updated technical requirements, references, formatting.
May-2023 S UFGS 26 56 13.00 40 Lighting Poles and Standards R Complete life cycle review. Updated technical requirements, references, formatting.
May-2023 A UFGS 31 41 16.16 Synthetic Sheet Piling N New UFGS section.
May-2023 A UFGS 31 63 29 Drilled Concrete Piers and Shafts C Administrative Change: Preparing Activity changed from NASA to USACE
May-2023 S UFGS 33 75 00.00 40 Switchgear and Protection Devices D Archived. No longer used. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
May-2023 A UFGS 35 01 41.00 10 Electromechanical Operating Machinery for Locks and Dams C 3 Incorporated CCR 13056
Feb-2023 N UFGS 01 14 00 Work Restrictions C 1 In response to CCR 12429, updated work requirements at Naval Base Kitsap.
Feb-2023 N UFGS 01 20 00 Price and Payment Procedures C 3 In response to CCR 12177, replaced "lump sum" with "Job" in second Note for Army projects, removed "lump sum" from DREDGING paragraph (1.11).
Feb-2023 N UFGS 01 31 23.13 20 Electronic Construction and Facility Support Contract Management System C 8 In response to CCR 12594, updated ECMS UTILIZATION paragraph (1.6) to clarify when contractors must utilize eCMS for transferring submittals.
Feb-2023 A UFGS 01 33 00 Submittal Procedures C Administrative Change: Preparing Activity changed from NASA to Army.
Feb-2023 N UFGS 07 27 36 Spray Foam Air Barriers C 3 In response to CCR 12503, updated SUBMITTALS article and Prohibited Materials paragraph (2.1.5) to disallow all HFC blowing agents.
Feb-2023 N UFGS 07 57 13 Sprayed Polyurethane Foam (SPF) Roofing C 4 In response to CCR 12504, updated SUBMITTALS article and SPRAY URETHANE FOAM paragraph (2.2) to disallow all HFC blowing agents.
Feb-2023 N UFGS 12 00 01.00 20 Furniture, Fixtures and Equipment (FF&E) Package N New section developed for the design, procurement and installation of furniture, fixtures and equipment (FF&E) for new construction and building renovation projects.
Feb-2023 N UFGS 13 31 33 Frame Supported Membrane Structures for Protection of Aircraft N New section for frame supported membrane structures on airfields, which are commonly referred to as Aircraft Protective Equipment or Sunshades.
Feb-2023 S UFGS 22 07 19.00 40 Plumbing Piping Insulation R Complete life cycle review. Update technical requirements, references, formatting. Incorporated CCRs 5805 and 11444
Feb-2023 A UFGS 22 14 29.00 Sump Pumps R Complete review and update including Section number change from UFGS-22 14 29.00 40 to UFGS-22 14 29.00; Preparing Activity changed from NASA to Army.
Feb-2023 S UFGS 22 66 53.00 40 Laboratory Chemical-Waste and Vent Piping R Complete life cycle review. Update technical requirements, references, formatting.
Feb-2023 S UFGS 23 22 23.00 40 Steam Condensate Pumps R Complete life cycle review. Update technical requirements, references, formatting.
Feb-2023 S UFGS 23 41 13.00 40 Panel Filters R Complete life cycle review. Update technical requirements, references, formatting.
Feb-2023 S UFGS 27 13 23.00 40 Communications Optical Backbone Cabling R Complete life cycle review. Update technical requirements, references, formatting. Incorporated CCRs 4556, 11315, 11317, 11956
Feb-2023 S UFGS 28 33 00.00 40 Fuel-Gas Detection and Alarm R Complete life cycle review. Update technical requirements, references, formatting.
Feb-2023 A UFGS 33 01 98 Slip Lining of Existing Piping for Levee Applications R Complete review and update.
Feb-2023 S UFGS 33 71 01.00 40 Overhead Transmission and Distribution R Complete life cycle review. Update technical requirements, references, formatting.
Feb-2023 S UFGS 40 17 30.00 40 Welding General Piping R Complete life cycle review. Update technical requirements, references, formatting. Incorporated CCR 11345
Feb-2023 N UFGS 41 22 13.15 Bridge Cranes, Overhead Electric, Under Running Trolley C 1 Added an option for alternate wire rope in Division 2 hazardous areas. Updated formatting, references, foreign standard practices, and provided clarifications.
Feb-2023 N UFGS 41 22 13.55 Bridge Cranes, Under Running, Aircraft Hangar C 3 Added an option for alternate wire rope in Division 2 hazardous areas. Updated formatting, foreign standard practices, and provided clarifications.
Nov-2022 N UFGS 01 14 00 Work Restrictions R Complete review to reset section date; address CCRs 12149 & 12150, added "U.S. persons" to General Construction and Finish Work note and paragraph.
Nov-2022 A UFGS 02 65 00 Underground Storage Tank Removal R Complete review and update
Nov-2022 N UFGS 02 84 16 Handling of Lighting Ballasts and Lamps Containing PCBs and Mercury R Complete review to correct passive voice and address CCRs.
Nov-2022 N UFGS 02 84 33 Removal and Disposal of Polychlorinated Biphenyls (PCBs) R Complete review to correct passive voice and address CCRs.
Nov-2022 A UFGS 05 59 10 Rolling Cover for Aviation Refueling Vaults R Complete review and update
Nov-2022 N UFGS 08 34 49.00 20 Hemp Shielded Door R Complete review to correct passive voice and address CCRs.
Nov-2022 N UFGS 08 71 63.10 Electrical Locking Control for Brigs R Complete review to correct passive voice and address CCRs.
Nov-2022 N UFGS 23 64 26 Chilled, Chilled-Hot, and Condenser Water Piping Systems C 6 Updated paragraph "Valves" (3.1.5) removed sentence regarding omitting isolation valves
Nov-2022 A UFGS 26 05 19.00 10 Insulated Wire and Cable N This section number is being reinstated; superseding UFGS-26 05 19.10 10. Complete review and update.
Nov-2022 A UFGS 26 05 19.10 10 Insulated Wire and Cable D Superseded by UFGS 26 05 19.00 10 INSULATED WIRE AND CABLE. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Nov-2022 N UFGS 26 08 00 Apparatus Inspection and Testing R Complete review to correct passive voice and address CCRs.
Nov-2022 N UFGS 26 12 21 Single-Phase Pad-Mounted Transformers R Updated section to address CCRs
Nov-2022 A UFGS 26 29 01.00 10 Electric Motors, 3-Phase Vertical Induction Type R Complete review and update
Nov-2022 A UFGS 26 29 02.00 10 Electric Motors, 3-Phase Vertical Synchronous Type R Complete review and update.
Nov-2022 A UFGS 31 71 19 Tunnel and Shaft Excavation in Rock - Mechanical N New UFGS section.
Nov-2022 A UFGS 32 01 16.71 Cold Milling Asphalt Paving R Complete review and update
Nov-2022 A UFGS 32 13 14.13 Concrete Paving for Airfields and Other Heavy Duty Pavements R Complete review and update
Nov-2022 A UFGS 32 13 15.20 Concrete Pavement for Fuel Storage Containment Dikes R Complete review and update to include section title change from CONCRETE PAVEMENT FOR CONTAINMENT DIKES to CONCRETE PAVEMENT FOR FUEL STORAGE CONTAINMENT DIKES
Nov-2022 F UFGS 32 31 13 Chain Link Fences and Gates C Administrative Change: Preparing Activity changed from NASA to Air Force.
Nov-2022 F UFGS 33 05 23.13 Utility Horizontal Directional Drilling C Administrative Change: Preparing Activity changed from NASA to Air Force.
Nov-2022 F UFGS 33 51 39 Monitoring Wells C Administrative Change: Preparing Activity changed from NASA to Air Force.
Nov-2022 A UFGS 33 56 19 Fuel Impermeable Liner System R Complete review and update
Nov-2022 N UFGS 33 56 21.17 Single Wall Aboveground Fixed Roof Steel POL Storage Tank C 2 In response to various CCRs, including #11869, added ASME BPVC IX to "References" and "Welding Qualifications" paragraph (1.6.1); #11875 added API Std 650 to "Shell Height" paragraph (1.5.1.2), #11983 updated "Roof Perimeter Guardrail" paragraph (2.13.10) and added new Designer Note; #6124 removed wiper requirement and added non-corrosive materials for tape drum and cassette to "Mechanical Tape Level Gauge" (2.13.5) and (2.13.6) paragraphs; and #11261, revised opening Note to coordinate use of floating pans with UFC 3-460-01.
Nov-2022 A UFGS 35 45 01 Vertical Pumps, Axial-Flow and Mixed-Flow Impeller-Type C 2 Vibration standards have been updated in the document and pump baseplate design updated to follow API standards
Nov-2022 N UFGS 41 22 13.15 Bridge Cranes, Overhead Electric, Under Running Trolley R Complete review and major update, including title change (from BRIDGE CRANES, OVERHEAD ELECTRIC, UNDER RUNNING). Clarified terminology and made changes to submittals along with changes to technical and testing requirements.
Nov-2022 N UFGS 41 22 13.55 Bridge Cranes, Under Running, Aircraft Hangar C 2 Updated formatting with some changes to technical requirements.
Nov-2022 A UFGS 44 10 00 Air Pollution Control R Complete review and update
Aug-2022 A UFGS 01 35 29.13 Health, Safety, and Emergency Response Procedures for Contaminated Sites C 1 Incorporated CCR 8953.
Aug-2022 A UFGS 01 50 00 Temporary Construction Facilities and Controls C 2 Incorporated CCRs 10035, 10883, and 10885.
Aug-2022 N UFGS 01 57 19 Temporary Environmental Controls R Revised to align with current industry standards and DoD requirements. This Section supersedes UFGS-01 57 19.00 20 Supplemental Temporary Environmental Controls as all requirements are contained within this Tri-Service, tailorable specification as reorganized paragraphs in a hierarchical presentation.
Aug-2022 N UFGS 01 57 19.01 20 Supplemental Temporary Environmental Controls D Superseded by UFGS 01 5719 Temporary Environmental Controls Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2022 N UFGS 01 58 00 Project Identification C 5 In response to CCR 11903, corrected placement of tailoring tags and updated specifier notes throughout.
Aug-2022 A UFGS 02 41 00 [Demolition] [and] [Deconstruction] R Complete review and update.
Aug-2022 A UFGS 03 11 19.00 Insulating Concrete Forming R Section has been "Reinstated without Revision" as UFGS-03 11 19.00 Insulating Concrete Forming (new section number only) [was archived in 2019,]
Aug-2022 N UFGS 03 30 00 Cast-In-Place Concrete C 4 In response to the following CCRs: 10852, deleted paragraph Maximum Allowable Construction Joint Spacing (3.11.1) and list items a. and b.; 11572, updated Concrete Mix Design paragraph (1.6.1.2); 11445, updated Table under Sulfate Resistance paragraph (2.5.2.4 list item a.); 11120, removed list item b. under Reinforcement paragraph (6.2) and added list item e. under Epoxy-Coated Reinforcing Bars paragraph (2.6.1.2); and 11115, added ASTM A1094/A1094M to the Reference Article and as an option in paragraph Galvanized Reinforcing Bars (2.6.1.1) list item a.
Aug-2022 A UFGS 09 06 00 Schedules for Finishes R Complete review and update.
Aug-2022 N UFGS 09 97 13.27 High Performance Coating for Steel Structures C 1 The May 2022 version of this Section has been made inactivate as it conflicted with FAR requirements; the February 2021 version has been reinstated with changes made to TEST KITS (subparts 2.6.1 and 2.6.2)
Aug-2022 S UFGS 12 31 00 Manufactured Metal Casework D Archived - Casework is specified under Div 6 Wood and plastic. Casework is under the general contract, and is not under furnishings. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2022 S UFGS 12 32 00 Manufactured Wood Casework D Archived - Casework is specified under Div 6 Wood and plastic. Casework is under the general contract, and is not under furnishings. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2022 S UFGS 12 34 00 Manufactured Plastic Casework D Archived - Casework is specified under Div 6 Wood and plastic. Casework is under the general contract, and is not under furnishings. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2022 S UFGS 12 36 00 Countertops D Archived - Casework is specified under Div 6 Wood and plastic. Casework is under the general contract, and is not under furnishings. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2022 S UFGS 22 05 83.63 Cured-In-Place Pipe (CIPP) Lining for Plumbing Applications R Update technical requirements, references and format. Incorporated CCR# 5917, 7843
Aug-2022 S UFGS 23 31 13.00 40 Metal Ducts R Update technical requirements, references and format. Incorporated CCR# 10513
Aug-2022 S UFGS 23 36 00.00 40 Air Terminal Units R Update technical requirements, references and format. Incorporated CCR# 4530, 6338, 6340, 9585
Aug-2022 S UFGS 23 37 13.00 40 Diffusers, Registers, and Grills R Update technical requirements, references and format. Incorporated CCR# 4530, 6338, 6340, 9585
Aug-2022 A UFGS 23 63 00.00 10 Cold Storage Refrigeration Systems D Superseded by unified UFGS 23 63 00.00 COLD STORAGE REFRIGERATION SYSTEMS. Note: The last published PDF version of this Section is available in the previous release in the UFGS Archives.
Aug-2022 A UFGS 23 63 00.00 Cold Storage Refrigeration Systems N Superseding UFGS 23 63 00.00 10 COLD STORAGE REFRIGERATION SYSTEMS.
Aug-2022 S UFGS 23 82 16.00 40 Air Coils R Update technical requirements, references and format.
Aug-2022 A UFGS 26 28 00.00 10 Motor Control Centers, Switchboards and Panelboards R Complete review and update.
Aug-2022 N UFGS 31 31 16.13 Chemical Termite Control R Complete review and update.
Aug-2022 N UFGS 31 31 16.19 Termite Control Barriers R Complete review and update.
Aug-2022 A UFGS 32 11 23.23 Base Course Drainage Layers R Complete review and update
Aug-2022 N UFGS 33 52 80 Liquid Fuels Pipeline Coating Systems R Complete review and update.

Pages