Status
Active
View/Download
PDF   ZIP  
Publish Date
Pages
45
Spec. Division
33 - Utilities
CCR

History: Below is a listing of the Revisions and Changes made to this UFGS.

KEYPREPARING ACTIVITY (PA)A ArmyN NavyF Air ForceS NASA [ARCHIVED]
ACTIONN NewR RevisionC ChangeD Deletion
Release PA Action Change # Nature of Change or Revision
Nov-2021 A R Complete review and update including section title change from STORM DRAINAGE UTILITIES to STORMWATER UTILITIES.
Feb-2019 A C 6 Moved the LID Verification Report to SD-11 Closeout Submittals in response to CCR 6353.
May-2017 A C 5 Added requirements for field quality control.
Nov-2014 A C 4 Replaced ASTM C 924/C924M with ASTM C969/C969M per CCR 3584.
Aug-2014 A C 3 Made change as noted in CCR 3572; added SRPE requirements as noted in CCR 1158; made corrections and changes as noted in CCR 3333
May-2013 A C 2 Added requirements for use of Polypropylene (PP) Pipe
Aug-2012 A C 1 Per CCR 1438, changed AASHTO M 198 to ASTM C990
Feb-2010 A R In response to CCR 2210, tailoring options for Pipe Materials added.
Aug-2009 A R Complete revision of section
Feb-2009 A R Minor corrections throughout
Jan-2008 A N Superseding UFGS 33 40 01 Storm Drainage and UFGS 33 40 00.00 40 Storm Drainage Utilities